IR 05000293/1985015
| ML20206N132 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/14/1986 |
| From: | Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lydon J BOSTON EDISON CO. |
| Shared Package | |
| ML20206N138 | List: |
| References | |
| NUDOCS 8608260099 | |
| Download: ML20206N132 (2) | |
Text
AUG 141986 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. James M. Lydon Chief Operating Officer 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
SUBJECT: COMBINED EXAMINATION AND INSPECTION REPORT NO. 50-293/86-15 (OL)
The week of May 5,1986, the NRC conducted a Training Program Inspection and administered examinations to cmpicyees of your company who had applied for licenses to operate your Pilgrim Nuclear Power Station. At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.
In accordance with 10 CFR 2.790 of the. Commissions regulations, a copy of this letter and the enclosure (s) will be placed in the NRC Public Document Room.
No reply to this letter is required. Your cooperation in this matter is appreciated.
Original Signed By:
Harry B. Kister, Chief Reactor Projects Branch No. 1 Division of Reactor Projects Enclosure: Examination and Inspection Report No. 50-293/86-15 (OL)
w/ Attachments 1, 2, 3, and 4 cc w/ enclosure and Attachments 1, 2, 3, and 4:
C. J. Mathis, Station Manager D. Sanford, Training Manager Senior Resident Inspector Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Massachusetts cc w/ enclosure without Attachments 1, 2, 3, and 4:
L. Oxsen, Vice President, Nuclear Operations J. Shotwell, Assistant Attorney General P. Levy, Chairman, Dept. of Public Utilities Chairman, Board of Selectmen J. D. Keyes Plymouth Civil Defense Director Senator Edward P. Kirby 60814 FFICIAL RECORD COPY OL ER PILGRIM - 0001.0.0 ge2gga soog3 08/12/86 J M J-(
V i
(
Boston Edison Company M/C Nuclear
bcc w/ enclosure without Attachments 1, 2, 3, and 4 DRP Section Chief Examiner Chief, OLB DHFT, NRR Contract Exam Supervisor Region I Docket Room (w/ concurrences)
Master Exam File OL File G. Robinson, NRC Consultant RI:DRP g RI:DRP R:
- D I: RP Howe /fi Crescenzo Ki St nider ter 07/it/86 07/$86
/
/f/86 Qu
0FFICIAL RECORD COPY OL ER PILGRIM - 0002.0.0 i'
07/16/86