Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-277/82-06 & 50-278/82-06
ML20054F119
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/10/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20054F120 List:
References
NUDOCS 8206150232
Download: ML20054F119 (2)


Text

\ : .

'

JUN 10 W t

Docket Nos. 50-277; 50-278 l t

.

Philadelphia Electric Company

! ATTN: Mr. S. L. Daltroff

'

Vice President Electric Production l l 2301 Market Street

Philadelphia, Pennsylvania 19101 Gentlemen
-

Subject: Combined Inspection 50-277/82-06; 50-278/82-06 i

This refers to your May 19, 1982 reply to our April 22,1082 lette '

!

Thank you for infoming us of your corrective and preventive actions. Those ac-  !

tions will be examined during future inspection l As you requested, we have re-examined Violation A.3, a citation for not adequately I safeguarding against radiation exposure to workers. We recognize that there was I an administrative control over reactor water level and that the operators knew how to maintain that level. Your evaluation that the citation is based on the reactor i

operator not knowing why he was to maintain level as specified is correct. This

! is an essential aspect of safe plant operation and personnel radiation protection -

.

'

knowing not only what to do under normal conditions, but what to do if unusual cir-cumstances develop. Because the operator did not know about the valve work, he was not in a position to notify the workers of the potential contaminated and ther--

mally het water source if level control difficulty developed. Because this speci-fic instance did not have a high likelihood of a significant radiological conse-quence, we have reclassified the Violation at Severity Level V. In general, how-ever, we remain concerned about assurance that operators know about any unusual i conditions and evolutions and are knowledgeable about the potential consequence We will emphasize this area during future inspection We have also re-examined Violation A.1, a citation for failure to perform the ve-i' locity meter calibration for two hydraulic snubbers. Your information indicated that there was a valid calibration check of the indicator. That infomation has beer verified by our resident inspectors. Therefore, we have downgraded the Vio-1ation to Severity Level Your cooperation is appreciate

Sincerely,

. Original signea ay

.  ;

Richard . Staros ki' Director Division of Project d Resident Programs

,

8206150232 820610 '

gol PDR ADOCK 05000277 O PDR

_ _ . _

_ _ . . . __ ,

.- ~.

,

Philadelphia Electric Company 2 M 101982 cc:

W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire (w/cy of Licensee's Reply)

Eugene J. Bradley, Esquire (w/cy of Licensee's Repl )

Raymond L. Hovis, Esquire (w/cy of Licensee's Repl Michael J. Scibinico II', Assistant Attorney General (w/cy of Licensee's Reply)

Public Document Room (PDR) (w/cy of Licensee's Reply)

local Public Document Room (LPDR) w/cy of Licensee's Reply)

Nuclear Safety Information Center NSIC)(w/cyofLicensee'sReply)

NRC Resident Inspector (w/cy of Licensee's Reply)

Commonwealth of Pennsylvania (w/cy of '.icensee's Reply)

bec:

RegionIDocketRoom(withconcurrences)(w/cyofLicensee'sReply)

i

/} 0/

RI:D RI: RP omcc > RI. : D..P.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.un= = > cowg.i.,,,meo, , Mc ca ..... , ,,, , , ,i m.i g .. . st., ,tecki , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

m, > 9tN.82 .. . ...... ..fnl.9. . . f.:..?: l'.. .. .L.2!+ . .... ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

sac ronu ais tio-ea> Nacu c24a OFFICIAL RECORD COPY uw. mini- _ . . . . . .