IR 05000277/1982006
| ML20054F119 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/10/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20054F120 | List: |
| References | |
| NUDOCS 8206150232 | |
| Download: ML20054F119 (2) | |
Text
\\
.
'
JUN 10 W t
Docket Nos. 50-277; 50-278 t
Philadelphia Electric Company
.
ATTN: Mr. S. L. Daltroff
!
Vice President
'
Electric Production l
2301 Market Street
Philadelphia, Pennsylvania 19101 Gentlemen:-
Subject: Combined Inspection 50-277/82-06; 50-278/82-06 i
This refers to your May 19, 1982 reply to our April 22,1082 letter.
'
!
Thank you for infoming us of your corrective and preventive actions. Those ac-tions will be examined during future inspections.
As you requested, we have re-examined Violation A.3, a citation for not adequately I
safeguarding against radiation exposure to workers. We recognize that there was I
an administrative control over reactor water level and that the operators knew how to maintain that level. Your evaluation that the citation is based on the reactor i
operator not knowing why he was to maintain level as specified is correct. This
!
is an essential aspect of safe plant operation and personnel radiation protection -
knowing not only what to do under normal conditions, but what to do if unusual cir-
.
'
cumstances develop. Because the operator did not know about the valve work, he was not in a position to notify the workers of the potential contaminated and ther--
mally het water source if level control difficulty developed. Because this speci-fic instance did not have a high likelihood of a significant radiological conse-quence, we have reclassified the Violation at Severity Level V.
In general, how-ever, we remain concerned about assurance that operators know about any unusual i
conditions and evolutions and are knowledgeable about the potential consequences.
We will emphasize this area during future inspections.
We have also re-examined Violation A.1, a citation for failure to perform the ve-i locity meter calibration for two hydraulic snubbers. Your information indicated
'
that there was a valid calibration check of the indicator. That infomation has beer verified by our resident inspectors. Therefore, we have downgraded the Vio-1ation to Severity Level V.
Your cooperation is appreciated.
Sincerely, Original signea ay
.
.
Richard. Staros ki' Director Division of Project d Resident Programs gol
,
8206150232 820610
'
PDR ADOCK 05000277 O
_ _. _
_ _...
__
,
.-
~.
,
M 101982 Philadelphia Electric Company
cc:
W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire (w/cy of Licensee's Reply)
Eugene J. Bradley, Esquire (w/cy of Licensee's Repl )
Raymond L. Hovis, Esquire (w/cy of Licensee's Repl Michael J. Scibinico II', Assistant Attorney General (w/cy of Licensee's Reply)
Public Document Room (PDR) (w/cy of Licensee's Reply)
local Public Document Room (LPDR) w/cy of Licensee's Reply)
Nuclear Safety Information Center NSIC)(w/cyofLicensee'sReply)
NRC Resident Inspector (w/cy of Licensee's Reply)
Commonwealth of Pennsylvania (w/cy of '.icensee's Reply)
bec:
RegionIDocketRoom(withconcurrences)(w/cyofLicensee'sReply)
i
/}
0/
RI:D RI:
RP RI. : D..P..
.
........
....
........
.
...
...........
................
.............
omcc >
.un= = > cowg.i.,,,meo,, Mc ca.....,,,,
,,,i m.i g... st.,
,tecki,
,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,
9tN.82...........fnl.9..
. f.:..?: l'.....L.2!+.
m, >
....
.......
...................
...............
sac ronu ais tio-ea> Nacu c24a OFFICIAL RECORD COPY uw. mini-m.m
-
_......