IR 05000277/2014001

From kanterella
Jump to navigation Jump to search
ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001)
ML15062A180
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2015
From: Fred Bower
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Nuclear
BOWER, FL
Shared Package
ML15049A477 List:
References
IR 2014001
Download: ML15062A180 (5)


Text

rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2014001 AND 05000278/2014001)

Dear Mr. Hanson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection program at PBAPS, we also plan to conduct Inspection Procedure (lP) 71004, "Power Uprate, and IP 60855.1, Operation of an IFISI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site is being coordinated for the week of June 22, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

From January 1 to December 31, 2014, the NRC issued one traditional escalated enforcement action associated with the violation found in the inspection report 07200029/14-008 (ML14307A797). Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders, to follow-up on this violation.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Enclosure: Peach Bottom Atomic Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A180 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/ GSB FBower/ FLB DATE 02/19/15 02/ 19 /15

Page 1 of 2 Peach Bottom 01/26/2015 09:41:20 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 3/23EXAM - INITIAL OL EXAM 3 2 02/23/2015 02/27/2015 U01911 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM 2 03/23/2015 04/03/2015 U01911 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM 7111111B - REQUAL INSP W/ P/F RESULTS 2 2, 3 03/23/2015 03/27/2015 IP 7111111B Licensed Operator Requalification Program EP - EP PROGRAM INSPECTION 1 2, 3 03/09/2015 03/13/2015 IP 7111402 Alert and Notification System Testing 2, 3 03/09/2015 03/13/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/09/2015 03/13/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 03/16/2015 03/20/2015 IP 7111105T Fire Protection [Triennial]

2, 3 03/30/2015 04/03/2015 IP 7111105T Fire Protection [Triennial]

71152B - PI&R - BIENNIAL 5 2, 3 04/06/2015 04/10/2015 IP 71152B Problem Identification and Resolution 2, 3 04/20/2015 04/24/2015 IP 71152B Problem Identification and Resolution ISFSI - ISFSI LOADING INSPECTION 1 2, 3 05/11/2015 05/15/2015 IP 60855 Operation Of An ISFSI 2, 3 05/11/2015 05/15/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RS7 - 71124.07 1 2, 3 06/22/2015 06/26/2015 IP 71124.07 Radiological Environmental Monitoring Program 71124.08 - RADWASTE 1 2, 3 07/20/2015 07/24/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS45 - 71124.03, .04, .05 1 2, 3 07/20/2015 07/24/2015 IP 71124.04 Occupational Dose Assessment 2, 3 07/20/2015 07/24/2015 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - U3 INSERVICE INSPECTION 1 3 09/14/2015 09/18/2015 IP 7111108G Inservice Inspection Activities - BWR RS123 - 71124.01, .02, .03 1 2, 3 09/28/2015 10/02/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 09/28/2015 10/02/2015 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 09/28/2015 10/02/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 09/28/2015 10/02/2015 IP 71151-OR01 2, 3 09/28/2015 10/02/2015 IP 71151-PR01 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Peach Bottom 01/26/2015 09:41:20 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111117T - PERMANENT PLANT MODIFICATIONS 3 2, 3 01/25/2016 01/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 02/08/2016 02/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE EVALUATION 4 2, 3 04/25/2016 04/29/2016 IP 7111401 Exercise Evaluation RS1234 - HP INSPECTION 1 2, 3 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 03/07/2016 03/11/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 03/07/2016 03/11/2016 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 1 2, 3 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance RS567 - HP TEAM INSPECTION 3 2, 3 06/20/2016 06/24/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 06/20/2016 06/24/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.