IR 05000321/1988031

From kanterella
Revision as of 11:50, 20 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/88-31 & 50-366/88-31
ML20235W767
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/23/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8903130172
Download: ML20235W767 (10)


Text

. -- - -

Uhr m

.

. FEB 231989 L

'

Georgia Power Company

..

ATTN: Mr. W. G. Hairston, III Senior Vice President -

Nuclear Operations P. O. Box 12951 Birmingham, AL 35201 Gentlemen:

SUBJECT.: INSPECTION' REPORT NOS. 50-321/88-31 AND 50-366/88-31 Thank you for your response of January 27, 1989, to our Notice of-Violation- !

issued on December 14, 1988, concerning activities conducted at your Hatch facilit We have evaluated .your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your-corrective actions during future inspection We appreciate your. cooperation.in this matter.

,

Sincerely, Caudie .. Julian, Chief Engineering Branch Division of Reactor Safety cc: R. P. Mcdonald, Executive Vice President, Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, General Manager, Plant Hatch 0. M. Fraser, Site Quality Assurance Manager

'

L. T. Gucwa, Manager, Nuclear Engineering and Licensing, Plant Hatch S. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bcc: L. P. Crocker, NRR M. V. Sinkule, RII NRC Resident Inspecto DRS Technical Assistant Document Control Desk

"

oley:ser

-

1 e

"II gMSinkule M

/Sf/89 cy89 02p /89 8903130172 890223 \0 PDR ADOCK 05000321 Q PDC g