IR 05000321/1988038

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-321/88-38 & 50-366/88-38
ML20244C320
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/07/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8904200154
Download: ML20244C320 (1)


Text

.__

.

W E

fg g

..

f

,

-

+

APR 071989 I

'

J

'

. Georgia. Power Company.

ATTN: Mr. W. G.-Hairston,,III

,

Senior Vice President -

_ Nuclear Operations P. O. Box 1295-Birmingham,'AL.'35201

' Gentlemen:

-SUBJECT:

NRC INSPECTION REPORT NOS. 50-321/88-38 AND 50-366/88-38-Thank you _for your supplemental response of February 21. 1989, to our' Notice of Deviation issued on January 9,1989,- concerning ' activities conducted at your'

Plant Hatch facility.

We have evaluated your. response to Item B of the' Notice of Deviation.

We will. examine the implementation of your corrective actions

'during future inspections.

We appreciate your cooperation in. this matter.

Sincerely,

.

togt \\,

it Caudie A. Julian, Chief Engineering Branch Division of Reactor Safety cc:

R. P. Mcdonald, Executive Vice President, Nuclear _ Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, General Manager, Plant Hatch 0. M. Fraser, Site Quality Assurance Manager L.' T. Gucwa,' Manager, Nuclear Engineering and Licensing, Plant Hatch S. B. Tipps, Manager of Nuclear

,

Safety and Compliance State of Georgia bcc: L P. Crocker, NRR M. V. Sinkule; RII NRC Resident Inspector DRS Technical Assistant Document Control Desk L{I f')

R I.h RII

. J/

I th

,

rR u:tm lake MSinkule

'0

/89

/f1/89 p3/p/89

-

i if

!

8904200154 890407 PDR ADOCK 05000321 Q

PDC y

.E601 j