Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:UTILITY
MONTHYEARIR 05000321/19900221990-11-19019 November 1990 Insp Repts 50-321/90-22 & 50-366/90-22 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Design Mods & Changes & Followup on SSFI Open Items IR 05000321/19900201990-11-13013 November 1990 Insp Repts 50-321/90-20 & 50-366/90-20 on 900915-1020. Violations Noted.Major Areas Inspected:Operations Including Two Unit One Scrams,Main Steam Line Radiation Monitor Trip Settings & Setpoint Controls IR 05000321/19900161990-11-0505 November 1990 Insp Repts 50-321/90-16 & 50-366/90-16 on 901001-12.No Violations or Deviations Noted.Major Areas Inspected: Verification of Corrective Actions for Previous Findings in Areas of EOPs IR 05000321/19900211990-11-0101 November 1990 Insp Repts 50-321/90-21 & 50-366/90-21 on 901001-05.No Violations or Deviations Noted.Major Areas Inspected:Whole Body Counter & Radioanalytical Lab Qc,Fuel Quality & ALARA IR 05000321/19900191990-10-18018 October 1990 Insp Repts 50-321/90-19 & 50-366/90-19 on 900925-28.No Violations Noted.Major Areas Inspected:Annual Emergency Exercise IR 05000321/19900171990-10-12012 October 1990 Insp Repts 50-321/90-17 & 50-366/90-17 on 900911-14.No Violations or Deviations Noted.Major Areas Inspected: Compliance W/Atws Rule IR 05000321/19900141990-07-12012 July 1990 Insp Repts 50-321/90-14 & 50-366/90-14 on 900512-0622.No Specific Strengths or Weaknesses of Licensee Programs Noted. Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation & Events IR 05000321/19890161989-09-20020 September 1989 Insp Repts 50-321/89-16 & 50-366/89-16 on 890722-0825. Violations Noted Re Surveillance Tracking Software Deficiency Resulting in Deactivation of Task.Major Areas Inspected:Operational Safety Verification & Maint IR 05000321/19890171989-09-0101 September 1989 Insp Repts 50-321/89-17 & 50-366/89-17 on 890612-16 & 0731- 0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Liquid & Gaseous Radwaste Processing,Control Room Habitability & Water Chemistry IR 05000321/19890181989-08-31031 August 1989 Insp Repts 50-321/89-18 & 50-366/89-18 on 890807-11. Violation Noted Re Failure to Repair Components of post- Accident Sampling Sys.Major Areas Inspected:Emergency Preparedness,Including Emergency Kits & Equipment IR 05000321/19890131989-08-23023 August 1989 Insp Repts 50-321/89-13 & 50-366/89-13 on 890710-13. Violations Noted.Major Areas Inspected:Review of Licensee Organization & Mgt Controls,External Exposure Controls, Dosimetry,Alara Program & Solid Radwaste IR 05000336/19890161989-08-21021 August 1989 Insp Rept 50-336/89-16 on 890616-0726.Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint, Previously Identified Items,Committee Activities,Emergency Diesel Generator Operation & Fuel Oil Sys IR 05000321/19890151989-08-16016 August 1989 Insp Repts 50-321/89-15 & 50-366/89-15 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Nrc Bulletin 80-11,masonry Wall Design & Licensee Action on Previous Insp Findings IR 05000321/19890141989-08-0303 August 1989 Insp Repts 50-321/89-14 & 50-366/89-14 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions on Previous Insp Findings IR 05000321/19890121989-08-0202 August 1989 Insp Repts 50-321/89-12 & 50-366/89-12 on 890624-0721. Licensee-identified Violations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observation,Ros & Surveillance Procedures & Records IR 05000321/19890111989-07-10010 July 1989 Insp Repts 50-321/89-11 & 50-366/89-11 on 890619-23. Violation Noted.Major Areas Inspected:Licensee Actions Re Previous Insp Findings & NRC Bulletins IR 05000321/19890101989-07-0505 July 1989 Insp Repts 50-321/89-10 & 50-366/89-10 on 8905270623.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Calibr & Surveillance Procedures & Records IR 05000321/19890071989-06-19019 June 1989 Insp Repts 50-321/89-07 & 50-366/89-07 on 890422-0526. Licensee Identified Violations Not Being Cited.Major Areas Inspected:Operational Safety Verification,Maint Observations & Surveillance Testing Observations IR 05000321/19890091989-06-0909 June 1989 Partially Withheld Insp Repts 50-321/89-09 & 50-366/89-09 on 890522-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Plan Audit, Testing & Maint,Protected & Vital Areas & Alarm Stations ML20245D5311989-05-22022 May 1989 Insp Repts 50-321/89-02 & 50-366/89-02 on 890227-0317. Violations Noted.Major Areas Inspected:Maint Program & Implementation.Per NRC Temporary Instruction 2515/97 IR 05000321/19890061989-05-0808 May 1989 Insp Repts 50-321/89-06 & 50-366/89-06 on 890321-0421. Violation Noted.Major Areas Inspected:Operational Safety Verification,Ros,Surveillance Testing Observations,Maint observations,10CFR21 Insp & TMI Items IR 05000321/19890051989-04-13013 April 1989 Partially Withheld Insp Repts 50-321/89-05 & 50-366/89-05 on 890320-24 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Records & Repts & Testing & Maint IR 05000321/19890041989-04-11011 April 1989 Insp Repts 50-321/89-04 & 50-366/89-04 on 890225-0320. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation,Ros & Visit to Lpdr IR 05000321/19890011989-03-16016 March 1989 Insp Repts 50-321/89-01 & 50-366/89-01 on 890121-0224. Violations Noted Re Deficient RHR Valve Operability Procedure.Major Areas Inspected:Operational Safety Verification,Maint Observation & Diesel Generator Fuel Oil IR 05000321/19890031989-03-10010 March 1989 Insp Repts 50-321/89-03 & 50-366/89-03 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention/Protection Program Implementation & Followup on Previously Identified Items IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000321/19880421989-02-15015 February 1989 Insp Repts 50-321/88-42 & 50-366/88-42 on 881224-890120.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Esf Sys Walkdown,Ros, Followup on NRC Bulletin 88-03 & Part 21 Rept IR 05000321/19880301988-11-0808 November 1988 Insp Repts 50-321/88-30 & 50-366/88-30 on 880924-1021. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Testing Observations,Ros, Util Operational Upgrade Efforts & Refueling Activities IR 05000321/19880291988-10-12012 October 1988 Insp Repts 50-321/88-29 & 50-366/88-29 on 880820-0923.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations & Surveillance Testing Observations & Physical Security IR 05000321/19880271988-09-28028 September 1988 Partially Withheld Insp Repts 50-321/88-27 & 50-366/88-27 on 880822-26 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Locks,Keys & Combinations & Access Controls ML20155A2121988-09-22022 September 1988 Insp Repts 50-321/88-24 & 50-366/88-24 on 880723-0819 & 0822-24.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Plant Mods,Esf Sys Walkdowns & Review of Licensee Operational Upgrade Efforts IR 05000321/19880251988-09-22022 September 1988 Insp Repts 50-321/88-25 & 50-366/88-25 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Operational Readiness of Site Emergency Preparedness Program.Weakness Noted Re Current Administrative Control IR 05000321/19880261988-09-0909 September 1988 Insp Repts 50-321/88-26 & 50-366/88-26 on 880816-19.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste,Transportation of Radioactive Matl,Followup on Previous Insp Items & Selected NRC Info Notices IR 05000321/19880221988-08-30030 August 1988 Insp Repts 50-321/88-22 & 50-366/88-22 on 880625-0722.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Radiological Protection & Physical Security IR 05000321/19880231988-08-15015 August 1988 Insp Repts 50-321/88-23 & 50-366/88-23 on 880801-05.No Violations Noted.Major Areas Inspected:Review of Completed post-refueling Startup Tests,Thermal Limits Monitoring, Thermal Power Monitoring & Nuclear Instrument Calibrs ML20153F2351988-07-22022 July 1988 Insp Repts 50-321/88-21 & 50-366/88-21 on 880620-24. Violations Noted.Major Areas Inspected:Fire Protection/ Prevention & Followup on Previously Identified Insp Findings ML20151L9451988-07-21021 July 1988 Insp Repts 50-321/88-17 & 50-366/88-17 on 880521-0624. Violations & Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations, Surveillance Testing Observations & Physical Security IR 05000321/19880121988-06-24024 June 1988 Insp Repts 50-321/88-12 & 50-366/88-12 on 880502-10. Deficiencies Noted.Major Areas Inspected:Emergency Operating Procedures,Including QA Measures,Quality of Control Room Drawings & Evaluation of Containment Venting Provisions IR 05000321/19880151988-06-16016 June 1988 Insp Repts 50-321/88-15 & 50-366/88-15 on 880509-20. Violations Noted.Major Areas Inspected:Operational Performance Assessment Re Effectiveness of Various Plant Groups Including,Operations,Qa & Engineering & Training IR 05000321/19880141988-06-10010 June 1988 Insp Repts 50-321/88-14 & 50-366/88-14 on 880418-20 & 0423-0520.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Radiological Protection & Physical Security IR 05000321/19880161988-05-23023 May 1988 Insp Repts 50-321/88-16 & 50-366/88-16 on 880509-10.No Violations or Deviations Noted.Major Areas Inspected:Review of Recent Changes to General Employee Training,Radiation Instrument Performance Checks IR 05000321/19880111988-05-13013 May 1988 Insp Repts 50-321/88-11 & 50-366/88-11 on 880326-0422. Violation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observations & Physical Security IR 05000321/19880131988-05-13013 May 1988 Insp Repts 50-321/88-13 & 50-366/88-13 on 880418-20.No Violations Noted.Major Areas Inspected:Hydrogen Water Chemistry & Plant Chemistry Control ML20151Z3091988-04-28028 April 1988 Suppl to Insp Repts 50-321/87-25 & 50-366/87-25,consisting of Results of Measurements of Split Water Samples & Criteria for Comparing Analytical Measurements IR 05000321/19880101988-04-27027 April 1988 Insp Repts 50-321/88-10 & 50-366/88-10 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM IR 05000321/19880071988-04-11011 April 1988 Insp Repts 50-321/88-07 & 50-366/88-07 on 880220-0325. Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Radiological Protection & Physical Security IR 05000321/19880081988-04-0101 April 1988 Insp Repts 50-321/88-08 & 50-366/88-08 on 880307-11.No Violations or Deviations Noted.Major Areas Inspected:Areas of Complex Surveillance Testing & IE Bulletin Followup ML20151B9241988-03-24024 March 1988 Partially Withheld Insp Repts 50-321/88-09 & 50-366/88-09 on 880229-0304 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Plan/Procedures,Repts/Records,Testing/Maint, Barriers,Detection Aids & Compensatory Measures IR 05000321/19880031988-03-23023 March 1988 Insp Repts 50-321/88-03 & 50-366/88-03 on 880201-05.No Violations Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping Sys & Mark I Containment long-term Program Mod ML20148H7111988-03-0707 March 1988 Insp Repts 50-321/88-05 & 50-366/88-05 on 880123-0219. Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Maint Observation,Operational Safety Verification,Plant Mods & Physical Security 1990-07-12
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly1999-06-17017 June 1999 PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized1999-05-0707 May 1999 PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury1998-09-18018 September 1998 PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217N1101998-04-21021 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:Maint Personnel Did Not Follow Procedures & Conducted Work That Was Not Specified on Maint Work Order Which Was Outside Approved Personnel Protection Clearance Boundary ML20216E7931998-03-10010 March 1998 Notice of Violation from Insp on 971228-980207.Violation Noted:As of 980207,measures Not Correctly Implemented in That Proposed Vendor Manual Change for Sys Not Submitted to Reflect Lower Set Point Requirement for PCV 2T48-F466 ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5061998-01-23023 January 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:On 971118,4 H Reporting Requirement Was Not Met. Several Workers Involved in Unit 2 Outage Activities Signed Into RCA on Improper RWPs Between 970317-0411 ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3571997-12-15015 December 1997 Notice of Violation from Insp on 971005-1115.Violation Noted:Licensee Failed to Label Properly Eight Spent Vacuum Filters Having Max Contact Dose Rates Ranging from 4.7 to 7.5 Rem Per Hour Which Were Suspended from Unit 1 Catwalk ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20197F3711997-12-15015 December 1997 Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006 ML20199G9381997-12-0101 December 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:On 970320,L Tillman Engaged in Deliberate Misconduct Causing Licensee to Be in Violation of TS 5.4,by Failing to Rept That Work Was Mistakenly Performed on Valve 2E51-F102 PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown1997-11-21021 November 1997 PNO-II-97-060:on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown ML20199B8121997-11-0303 November 1997 Notice of Violation from Insp on 970817-1004.Violation Noted:Written Procedures Were Not Implemented on 970815 & Maintenance Work Was Completed Using Maintenance Work Order W/Inadequate Instructions ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196J7051997-07-25025 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:On 970609,steps 8.4.5 & 8.5.2 of Administration Control Procedure 30AC-OPS-001-OS,rev 15 Were Not Correctly Implemented ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6581997-07-17017 July 1997 Notice of Violation from Insp on 970609-13.Violation Noted: Improperly Stored Matl,Which Had Potential to Impact Performance of Safety Related Equipment in Control Room, Was Identified ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F8641997-06-17017 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Listed Examples of Inadequate Testing Procedures Were Identified ML20140C2301997-05-30030 May 1997 Notice of Violation from Insp on 970428-0502.Violation Noted:Policies & Procedures Were Not Adequately Implemented in Employee Assistance Program Info & Released W/O Written Permission from Employee ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors ML20148B8191997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Sections 8.12,8.13,4.2.2,4.7.7 & 8.8.3 of Procedure 30AC-OPS-001-OS Were Not Correctly Implemented IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000321/19973001997-04-0404 April 1997 NRC Operator Licensing Exam Repts 50-321/97-300 & 50-366/97-300 on 970314-20.Exam Results:All Candidates Passed Exam IR 05000321/19970991997-04-0404 April 1997 SALP Repts 50-321/97-99 & 50-366/97-99 for 950528-970222 ML20137F6301997-03-24024 March 1997 Notice of Violation from Insp on 970119-0222.Violation Noted:Design Control Requirements Not Translated Into Specifications ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-97-017, on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed1997-03-13013 March 1997 PNO-II-97-017:on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed ML20134L0771997-02-13013 February 1997 Notice of Violation from Insp on 961208-970118.Violation Noted:Written Procedures Were Not Implemented & Listed Examples of Failure to Implement Procedures for Radiation Control Activities Were Identified PNO-II-97-006A, on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions1997-01-30030 January 1997 PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions PNO-II-97-006, on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified1997-01-29029 January 1997 PNO-II-97-006:on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified 1999-09-16
[Table view] |
Inspection Report - Hatch - 1988030 |
---|
|
|
Text
'
. .
UNIT E3 STATES
[g.oEs:qq%* NUCLEAR REGULATORY COMMISSION y' ' ' s REGION ti y , j 101 MARIETTA STREET, # 1 s ATL ANT A, GEORGI A 30323
\ ...+ /
Report Nos: 50-321/88-30 and 50-366/88-30 Licensee: Georgia Power Company P.O. Box 4545 Atlanta, GA 30302 Docket Nos: 50-321 and 50-466 License Nos: OPR-57 and NPF-5 Facility Name: Hatch 1 and 2 Inspection Dates: September 24 - October 21, 1988 Inspection at h.cch site near Baxley, Georgia Inspectors: _ wnI t //.F- M'
John'E. Menning, Senic, sident inspectcr Date Signed
-
/ .n A M all A. Musser, Resident Inspector
// .h W Dafe Signed 0'?d L c<. h Na z PlZ 8C harle A. Patterson, Pro ct Engineer Date igned Approved by: A444Ed x 8 F RirVin V. Sinkule Chief, Project Section 3B D6te 5fgned Division of Reactor Projects SUMMARY Scope: This routine inspection was conducted at the site in the areas of Operational Safety Verification, Maintenance Observations, Surveillance Testing Observations, Reportable Occurrences Review of Licensee's Operational Upgrade Efforts, and Refueling Activitie Results: In the areas inspected, two violations were identified involving failure to follow written procedure The first violation resulted in the improper addition of water to the suppression pool, and the second violation resulted in the improper leak rate testing of a core spray valve.
i
!
l i 8811150284 G81109 l FDR ADOCK 05000321 l Q PDC I
- _. _-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ .
. -
- , ,
t
!
>
REPORT DETAILS l
! Persons Contacted Licensee Employees
- D Davis, Manager General Support ,
'
- J. Fitzsimmons, Nuclear Security Manager P. Fornel, Maintenance Manager f
- 0. Fraser, Site Quality Assurance Manager :
- H. Googe, Outages and Planning Manager [
- J. Lewis, Acting Operations Manager 4
- C, Moore, Plant Support Manager !
H. Nix, General Manager '
- T. Powers, Engineering Manager
- H. Sumner, Plant Manager L
'
- S. Tipps, Nuclear Safety and Compliance Manager R. Zavadoski, Health Physics and Chemistry Manager
.
Other licensee employees contacted included technicians, operators, {
mechanics, security force members and office personne NRC Resident inspectors !
l
R. Musser j
>
NRC managerent on site during inspection period: f r
L. Crocker, Project Manager, Project Directorate !!-3, NRR !
M. Ernst. Acting Regional Administrator, Region !! (
0. Matthews, Director, Project Directorate !!-3, NRR !
L. Reyes, Director, Divinion of Reactor Projects, Region !! !
M. Sinkule, Chiaf, Project Section 3B, Region II j
- Attended exit interview Acronyms and initialisms used throughout this report are listed in the l last paragrap ( Operational Safety Verification (71707) Units 1 and 2 The inspectors kept themselves infomed on a daily basis of the overall l plant statur, and any significant safety matters related to plant !
operations. Daily discussiont were held with plant management and various [
members of the plant operating staff. The inspectors made frequent visits :
to the control room. Observations included instrument readings, setpoints i
i
,---.-..---_--,--,,__---__.-,-_.---..-,--.]
-
?
.
!
.
'
!
i I i
i 2 l
.
i i
f i
and recordings, status of operating systems, tags and clearances on i equipment, controls and switches, annunciator alarms, adherence to i
limiting conditions for operation, temporary alterations in effect, daily j i journals and data sheet entries, control room manning, and access ;
! controls. This inspection activity included numerous informal discussions !
i with operators and their supervisors. Weekly, when on site, selected ESF l
,
systems were confirmed operable. The confirmation was made by verifying i j the following: accessible valve flow path alignment, power supply breaker i a and fuse status, instrumentation, major component leakage, lubrication, !
! cooling, and general conditio !
j General plant tours were conducted on at least a weekly basi Portions l i of the control building, turbine building, reactor building, and outside !
! areas were visited. Observations included general pant / equipment !
! conditions, safety-related tagout verifications, shif'. turnovar, sampling ;
I program, housekeeping and genera'. plant conditions, five protection !
J equipment, control of activities in progress, radiation protection [
q controls, physical security, problem identification systems, missile i l hazards, instrumentation and alarms in the control room, and containment !
j isolatio t f
l As previously reported in NRC Inspet tion Report Nos. 50-321/88-29 and l t 50-366/88-29, the licensee was in the process of using "high-tech" sonic '
i equipment to map the various frequencies heard in the fuel pool in an ;
i ef fort to locate the Unit 1 spent fuel pool linrr leak. On September 23 j 1988, a frequency that could be attributed to a leak in the liner was
,
discovered tear a bracket on the fuel pool cooling return line. A visual
- inspection (with an underwater camera) of the area confirmed the existence
- of a crack. On September 25-26, 1988, an underwater repair of the spent j
! fuel pool was performed. A patt5 was welded to the liner wall and leakage i i was reduced to zer The repair appears to have co.*rected the condition,
' and the licensee anticipates no further actio l l
At 0755 on September 27, 1988, the licensee comenced the shutdown of Unit 1 in preparation for the unit's eleventh refueling outage. The
unit's main generator was disconnected from the grid at 0528 on September 28, 198 The reactor was subsequently manually scramed at i 0930 on September 28, 1988, and the cold shutdown condition was achieved
i at 0320 on September 29, 193 At 1025 on October 3, 1988, the licensee j began defueling the core. Core unload was completed at 0557 on October 9,
198 On September 27, 1988, while adding water to the Unit 1 suppression pool
,
per Section 7.4.3 of Unit 1 procedure 3450-E21-001-15. "Core Spray l System," personnel allowed the suppression pool water level to reach
approximately 152 inches. Once the addition of water to the suppression pool was stopped, the licensee entered the Technical Specification 3.7. limiti> g condition for operation which requires the unit to be in hot
.
'
shutdown within 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> The licensee returned the suppression pool i water level to within the technical specification-pernitted range of
- - , - - - - - - - - - - . - - - -,
.
, .
<
,
f
,
146-150 inches within 10 minutes thus terminating the limiting condition for operatio At the time of this event, Unit I was operating at
[
,] approcimately 95 percent of rated power and was connencing shutdown for
,
the refu W ag outag l
,
]
Section 7.4.3 of procedure 3450-E21-001-15 sta'es in part that suppression i pool level must be maintained between 146 inches and 150 it.ches, i
- Technical Specification 6.8.1.a requires that written procedures bo i
!
i established, implemented, and maintained as "econaended in Appendix A of i- Regulatory Guide 1.33 Revision 2 February 197 Appendix A of !
{ Regulatory Guide 1.33, Rcvision 2. recomendt pr ocedures for startup, ;
i operation, and shutdown of safety-related systems. This matter is a *
violation of Technical Srecification 6.8.1.a in that procedure t l 3450-E21-001-15 was 1ot followed by persnnnel odding water to the j j suppression poo This matter will be tracked as violation 321/8840-01, i j Improper Addition of Water to Suppression Poo j The inspectors toured the diesel generator building on October 5,1988, !
anti inspected the diesel generator building batteries. A seperate i l 125-volt diesel generator building battery is furnished for each diesel i
'
generator and associated 4 kilovolt bus. Controi power for each diesen l l generator, its genera'.or breaker, and the associated 4 kilovolt switengear ('
1 bus power feeder circuit breakers is supplied by its respective battery.
J The battery racks are designed to assure continuous operation of ?quipment !
j under maximum seismic shock condition i 2 I i The Unit 1 battery racks showed signs of corrosion, and several bolted !
4 restraints were not properly installed. The restraints of concern were on r the battery rack rails and consisted of a bolt threaded into a rectangular i l me W. locking device. The locking device has "V" notches that me.h with !
j
the rails. Several locking devices were not oriented such that the proper {
J sesh was obtained. The inspector discussed this concern with plant !
{ management and the system engineers. The licensee produced an internal i i Georgia Power Company letter dated Febrary 11, 1987, (Seismic Qualif !
I cation of Diesel Generator Battery Ra.k REA HT 6701) stating that the l battery racks were found to be structtrally adequate to withstand seismic j loadings but that the problem with the serrated nutt should be corrected j at the next outage to ensure proper safety margins. Apparently, this work
- was not perfonned at the next outage and was delayed. The system i
] engineers initiated MW0s on October 6, 1988, to coerect this item during [
l the current outage for Unit 1. The work was subsequently perforned under ;
l MW0s 1-88-6008, 9, and 10. On October 21, 1988, the inspector verified i
that this work had been performed by inspecting the Unit 1 battery rack f
' !
l Un;t 2 battery racks are a newer type, and the same conditions did not f j exit as did for Unit !
l I
'
One violation was identifie !
.
t J
i
._ ___ - _ _ _ _ _
'
, .
9 e 4 Maintenance Observations (62703) Units 1 and 2 During the report period, the inspcctors observed selected maintenance activities. Th" cbservations included a review of the work document, for adequacy, adherence to procedures, proper tagouts, adherence to *echnical specifications, radiological controls, observation of all or pat t of the octual work and/or retesting in progress, specified retest requirements, and adherence to the appropriate quality control The primary maintenance observations during this month are summarized below:
.tintenance Activity Date Replacement of an oil line on the 10/05/88 Condensate Booster Pump Motor 1N21-C002B per MWO 1-88-1083 (Unit 1) Shortening of wires within a junction 10/07/88 box on Diese' Generator 1C to correct condition of onduit extending from the junction tsx per MWO 1-87-3111 (Unit 1)
I Repair of FW controller 2C32-R600 per 10/13/88 MWO 2-88-4106 (Unit 2)
1 Replacement of lube oil temperature 10/19/83 l switch 2R43-N023A on Diesel Generator 2A per MWO 2-88-1917(Unit 2)
No violations or deviations were identifie Surveillance Testing Observations (61726) Units 1 and 2 The inspectors observed the perfomance of selected surveillances. The observation included a review of the procedure for technical adequacy, ccnfomance to technical specifications, verification of test instrument calibration, observation of all cr part of the actual surveillances, removal from service and return to service of the system or components affected, and review of the data for acceptability based upon the accepti. net criteria. The prirary surveillance testing observations during this month are sumarized below:
Surveillance Testing Activity Date Diesel Gererator 1A Monthly Test 10/04/88 per prc a are 345V-R43-001-15 (Unit 1) Source Range Monitor Flux Response 10/07/88 Test per .rocedure 42FH-ERP-013-05 (Unit 1)
_ _ _ _
_ _ _ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _
.
.. . :
!
'
5 l
!
Surveillance Testinq Activity Date !
(cont'd) HPCURCIC Pump Suction Source 10/19/88 Instrument Functional Test per l procedure 575V-SUY-015-25 (Unit 2)
,
At approximately 00M on October 5,1988, personnel on the refueling floor noted tne introduction of bubbles and cloudy water into the Unit I reactor ,
vessel through i core spray sparge Investigation revealed that .
personnel attempting to local leak rate test core spray system valve l 1E21 F005B (in the "B" Loop of the system) incorrectly connected the test .
apparatus to the "A" Loop of the core spray system. Upon pressurizing the !
test volume, nitrogen was introduced into the non-isolated "A" Loop of the "
system and ultimately exited through the core spray sparger into the [
reactor vessel. At the time of this event, Unit I was in the REFUEL mode, !
and core unload was in progress. The leak rate testing was being l performed in accordance with procedure 42SV-TET-001-15 "Primary i Containment Periodic Type B and C Leakage Tests," Rev. Attachment 3 of i this procedure provides th* local leak rate test configuration for valve {
1E21-F005 Technical Specification 6.8.1.c requires that written i procedures be establish *d, impemented, and maintained for surveillance ,
and test activities of safety-t elated equipment. This matter is a !
violation of Technical Specification 6.8.1.c in that procedure t 42SV-TET-001-15 was not followed by personnel attempting to test valve j 1E21-F005 This matte. Will be racked as violation 321/88-30 02, [
Improper Leak Rate Testing of Core Spray Valv One violation was identifie !
i 5. Reportable Occurrences (90712 and 92700) Units 1 and 2 A number of LERS were reviewed for potWial generic irrpact, to detect i trends, and to determine whether corrective actions appeared appropriat I Events which .<ere reported imediately were ;150 reviewed as they occurred !
to determine that technical specifications w?.i* being met and the public health and safety were of utmost consideratio ;
Unit 1: 88-13 Fecdwater Controller Failure Causes Reactor Scram on l Low Water Level l t
This LER concerns the Unit 1 automatic scram on t Septembei 4,198 The "A" RFP controller initially [
malfunctioned, resulting in a decrease in reactor t vessel water level. Yessel water level was restored and power level was reduce The "B" RFP controller subsequently failed downscale, resulting in a rapid i i reduction in vessel water level and an automatic scram :
l on low water level. The events of this LER and the [
, licensee's corrective actions were previously :
discussed in NRC Inspection Report Nos. 50-321/88 29 l and 50-366/88-2 Review of this LER is closed, f i
f
k
- _ _ _ _ - _ >
__
.
.
. .
.
r Unit 2: 82-103 RHRSW Heat Exchanger Flow Control Valve Fails in ;
Closed Position !
This LER concerns the failure of the "A" RHRSW heat !
exchanger flow control valve in the closed position ;
when operations personnel were attempting to place the .
'
"A" loop of RHRSW in service. Unit 2 was operating at approximately 100 percent of rated power at the time of this even The failure was determined to be i caused by a defective relay in the valve's position !
modulator. Corrective act;ons involved replacing the :
defective relay, recalibrating the modulator, and !
satisfactorily operability testing the "A" loop of l RHRS Review of this LER is closed, t 2 88-05 Personna Error Results in Instruments Inoperable i Longer Thar. Allowed t'or Surveillance
'
Thi LER cont. erns the removal from service of ATTS trip units 2B21-N680C and D for a period of time i greater than the two hours allowed by the technical .
i specification These trip units are part of the i primary containment isolation instrumentation and are I activated by a reactor vessel low level (Level 3) !
'
signal. Jumpers were installed across these trip units on March 5, 1988, during the validation of EFCV Approximately
,
j operability procedure 575V-SUV-004-2 eight and one half hours later, ATTS trip units !
j 2B21-N680C and 0 were returned to servic Footnote b !
i of Technical Specification Table 3.3.2-1 allows a trip i unit to be placed in an inoperable status for up to i
- two hours for required surveillance without placing :
the absociated channel in a tripped conditio l l '
Personnel validating procedure 575V-SUV-004-25 had d
apparently failed to comply with the time limitation :
section of that procedure. The inspcctor reviewed the !
licensee's corrective actions for this matter which ;
,
included revising the EFCV operability procedure to r
- emphasize the two-hour technical specification time !
'
, limitation. The inspectors reviewed Revision 2 of [
procedure 575V-SUV-004 ts, "Excess Flow Check Valve :
'
'
Operebility," and determined that the intended changes had been made. This matter appears to be a violation !
of Technical Specification Table 3.3.2-1. Howeve :
'
since all the requirements specified in 10 CFR Part 2 >
Appendix C,Section V, were satisfied, this licensee- p
- identified violation is not being cited.
i Additionally, review of this LER is close i
!
.,
I I
, l t
- - -
,
.
, .
.
88-21 Component Failure Results in Group 5 Isolation of Primary Containment Isolation System This LER concerns the unanticipated isolation of the RNCU system on high differential flow on August 31, 1988. At the time of this event the RWCU system "B" demineralizer was being placed into service following backwash and precoat operation Investigation revealed that the "B" demineralizer loop relief valve (2G31-F0628) had lifted and remained open for an indeterminate amount of time. The open reitet valve diverted process fluid to the RBED sump r,reating a high differential flow conditio Corre ctive action involved repiacing the relief valve with a similar valve under DCR 88-27 The fatied valve was identified as Model No. LCT-?G manufactured by J. E. Lonergan Company. RevirW of this LER is close High Pressure Coolant Injection Isolation Oue to Broken Wire to Speed Pickup The events of this LER concern the unanticipated isolation of HpCI during post maintenance testing on September 2, 198 The HPCI turbine tripped and the inboard steam supply primary containment isolation
'
salve (2E41-F002) closed on a high steam line differential pressure signal. No evidence of leakage
, was found. Fu.*ther investigation revealed that the l cable to the magnetic speed pickup for the HPCI l turbine had been damaged (presumedly duri ni, the maintenance). This cable provides speed feedback to
! the turbine speed controller. The cable was found to be pulled loose from its connector preventing feedback i
of turbine speed to the flow controller (2E41-F612)
and speed indicatcr (2E41-C002). This condition caused the Turbine control Valve to go full open l during ':he testing, resulting in the closure of
'
2E41 F002 on hi h differential pressure. The licensee l intends to deve op a meuanism to better protect this I cable from inadvertent damag It is anticipated that this mechanism will be implemented in Unit i during the current refueling outage and in Unit 2 during the Spring 1989 refueling outage. Review of this LER is ,
close (
6. Review of Licensee's Operationa? Upgrade Efforts - Units 1 and 2 As discussed in NRC Inspection Report Nos. 50-321/88-14 and 50-366/88-14 the licensee voluntarily initiated a progran in April of 1988 to upgrade certain aspects of operational performanc The referenced reports i
'
, ,
-
. .
l
.
I
,
8 ,
i< !
J l i mentioned that the resident inspectors would review longer-term I
! operational upgrade efforts as related activities were completed. The I
.
areas discussed below were reviewed during this reporting perio i j Nuisance Annunciates: The skansee has conducted a review of annuncia- ;
, tors for their functhnal purpose 3nd desig Design changes have been (
, initiated for 47 annunaiators (24 in Unit 1 and 23 in Unit 2) to reduce !
nuisance conditions. 1he inspectors conducted a review of the list of j jl affected annunciators. This included a partial review of the Design
-
,
Change Requests which changed the annunc'ators status. Additionally, on t
- October 14, 1988, a rout \ne tour of the Utit 2 control room revealed only two lit annunciators. These annunciators wtre being controlled and logged j in the annunciator control Nook as specified by procedure 30AC 0PS-009-05, [
l Rev. O. "Control Roon Instramentation." The aondition of the nuisance i 1 annunciators has improved vastly since the st art of the operational *
j upgrade program as evidenced by only two lit annunciators on the front f panels in the Unit 2 control them. Review M the licensee's operational l
j upgrade efforts in the nuisance enunciatM area is considered closed, i Houtekeepino and Cleanliness: The licensee decided to reemphasize the ;
j autnority and responsibility for establishing and maintaining high !
!
standards of plant housekt; ping and cleanliness in less traveled areas of t l t'ie plant. Additionally, a follow-up comprehensive management inspection [
j to evaluate the effectiveness of this effort was planned and expected to l l be completed by August 198 !
\ Procedurc 20AC-BLO-001-05, "Plant Housekeeping and Cleanliness Control," I was issued on August 10, 1988, to establish the requirements and [
l responsibilities for implementing an effective housekeeping and ;
,
cleanliness program at Plant Hatch. In reviewing this procedure the l inspectors noted that it addresses housekeeping practices, levels of i cleanliness, system cleanliness, and tool contro*, requirements. Related j
,
'
l inspection requirements are also proviled. Fe instance, the Manager }
l General Support is responsible for issuing ant' periodically updating a ,
t Plant Responsibility Matrix which identif tt.s responsibility for [
j housekeeping inspection Department managers are responsible for
- ensuring that weekly housekeeping inspections are conducted in those areas
- for which they are responsible. Personnel responsible for cleanup must i
! also be identified. Inspections must be documented on a nonthly basis and l forwarded to the Superintendent of Buildings and Grounds fur review and l
subseqsent traasmittal to Document Contro !
!
{
The licensee also developed administrative guideline AG-MGR-36 0588N,
,'
"Management Housekeeping Inspection Program, to define a program for (
'
conducting management housekeeping inspection In essence, the administrative guideline assigns responsibility to the Plant Manager, Plant Support Manager and Department Managers for conducting housekeeping inspections of assigned areas and reporting results at the monthly
< Management Staff Meetin Inspections are required on a quarterly basis
{
and inspection findings are reported on a special Housekeeping Inspection j
Form. The inspectors reviewed forms documcnting the results of management i l
l i
l I !
i
_ _ _
.
1 .
.
s .
i
.! housekeeping inspections conducted August 4-5, 1988. The inspectors
- determined that the licensee had conducted .he management housekeeping
'
inspections committed to in *,he operational upgrade program.
! Review of the licensee's operational upgrade effortr in the area of housekeeping and cleanliness is closed. However, tne inspectors will
^
continue to monitor the licensee's performance ir,inis area as part of the routine implementation of NRC Inspection Procedure 71707.
! Equipment Labeling: The licensee's longer-tem efforts in this area J involved correcting any remaining equipment labeling that did not comply
< with Plant Hatch labeling procedures. Current labeling requirements are i contained in procedure 30AC 0PS-008-05, "Systen and Component labeling,'
Rev. O, dated May 17, 1988. Licensee representatives indicated to the inspectors early in this reporting period that they considered the longer-term upgrado efforts to be completed. The inspectors subsequently reviewed the labeling on selected panels, systems, and other items of equipmen*, to assess the effectiveness of the licensee's actions. Labels on the following items were reviewed on September 28-29, 1988: th and 12th Stage Heaters Instrument Panel 2H21-P218 (Unit 2) Stator Cooling Unit 2N43-B001 (Unit 2) Condensate Polishing Control Panel 2N21-P001A (Unit 2) th Stage Heater Instrument Panel 2H21-P216 (Unit 2) i /200 Volt MCC 2R24-5012 (Unit 2) Reactor Yessel Level and Pressure Instrument Pack 2H21-P405B (Unit 2)
9 RecirculationMGSet2B31-5001A(Unit 2) CRD Hydraulic System (Unit 2) th and 8th Stage Heater Panel 1H21 P217 (Unit 1)
j. Hydrogen Seal Oil Unit INA2-0001 (Unit 1) Volt MCC IL24 5006 (Unit 1) Condensate Booster Pumps 1N21-C0028 and C (Unit 1)
The inspectors concluded during reviews of the above items that observed labeling essentially complied with the requirements of 30AC 0PS-008-0 However, two discrepancies were observed and brought to the attention of cognizant licensee personnel. Instrument valve 2C11-N002-TV1 in the Unit 2 CR0 Hydraulic system was unlabeled. Additionally, a circuit breaker in the 58 position on Unit 1 600 volt MCC 1R24-5006 was unlabele In view of the very large number of equipment labels at Plant Hatch, it is clear that the licensee's labeling program will only be effective over the long tem if technicians, equipment operators, and craf t personnel are diligent in reporting discrepancies. The inspectors noted that the Plant Manager comunicated equipeent labeling requirements to plant personnel via Managenent Memo MM-MGR-02-0888 dated August 25, 198 Review of the licensee's operational upgrade efforts in the area of equipment labeling is close .-
. i
. .
I (i 10 f
'
!
I
!
J 7. Refueling Activities (60710) Unit 1 The inspectors observed the off-load of fuel from Unit 1 on October 4-5, !
1988. Fuel handling operations were monitored from the control room and i i refuel floo Phone comunications were established between the control l room and the refuelint bridge. A senior Reactor Operator was in charge of
'
,
the refueling operations and stationed on the refueling bridge. Fuel i
,
handling operations are conducted per plant procedure 42FH-ERP-014-05, i Fuel Movement Operatio Also, the radiation work permit for fuel !
handling was reviewed and plant personnel on the refueling bridge were i dressed in the appropriate protective clothing as required by the permi {
i lhe fuel transfer shects and fuel status tag board was observed being used
- and kept curren The fuel off-load wr3 being conducted in a spiral t
! pattern as required by un' t technical necifications. The off load !
I sequence also retained fur fuel bundles iround each of the four source !
I range monitors until all other bundles vere removed. This off-load i sequence allowed maximum usage of the source range monitors during off-
) load. The inspectors did not observe any problems while watching fuel
- movemen [
J l
1 However, two minor problems did occur during fuel movemen First, fuel }
l handling was delayed for two hours on October 4,1988, af ter air bubbles j and dirty water was noted coming from the core spray sparger when local
'
leak rate testing was started on core spray loop "B". This event is
'
discussed in paragraph 4 abov )
I !
l The second problem occurred on October 5,1988, af ter a fuel bundle was l J slightly buttped against the transfer canal between the reactor cavity and I spent fuel pool. This occurred because the fuel "grapple normal full up" f I light was on but the grapple was actually several feet from full up, i
- After moving the bundle away from the core, the operator noticed that the i
!
bundle would not clear the transfer canal. However, the movement was not !
,
stopped in time to prevent the morrentum of the bundle from causing the 1 bundle to buep into the transfer canal. Fuel handling procedure
.I 42FH-ERP-014-05, step 5.2.11 states that the fuel grapple must be in the i full up position prior to moving the bridge or trolle The inspectors .
- reviewed this natter with the cognizant system engineers. The fuel !
grapple consists of several telescoping sections. The top section is
- stationary and contains the limit switches for full out. The next lower
!
'
section moves up into the top sectior, to make up these limit switches. In this case, the associated air hoses for the fuel grapple had become caught
- in the telescoping section, causing the limit switches to indicate full j
, out although the fuel grapple was not full up. It appeared that the air j hoses were not being taken up smoothly on the takeup reels. The hoses f j were subsequently lubricated to allow smooth takaup. Reactor Sngineering l
' was tasked to examine the fuel channel surrounding the fuel bundle for any {
l evidence of denting or damag [
[
1 l
'
i I
>
I
'
' _ _ _ - _ _I
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
r- --------,
-
. ;
!
!
i i
The inspecurs reviewed the procedere for fuel handling equipment checkout [
for usage and notea that smooth operation of the takeup reels is checke !
Since the fuel grapple was nearly full out and indicated this, this f problem was not easil/ identified by operations personnel. The problem (
was one requiring minor equipment adjustment and did not involve a i procedure or personnel error, f
) ExitIn'.erview(30703) l L
The inspection scos e and findings were summarized on October 21, 1988, l with those persons 2ndicated in paragraph 1 above. The license !
identified violation %dicated in paragraph 5 was also discussed. The inspectors described tre areas inspected and discussed in detail the !
g inspection results listed below. The licensee did not identify as '
proprietary any of the material provided to or reviewed by the inspectors owing this inspection, and dissenting coments were not received from the license j Item Number Status Description /Referenct paraqraoh [
321/88-30-01 Opened VIOLATION - Improper Addition of Water to Suppression Pool ;
(paragraph 2) {
321/88 30-02 Opened VIOLATION - Improper Leak Rate Testing of Core Spray Valve (par: graph 4) Acronyms and Abbreviations l
ATTS Analog Transmitter Trip System f CRD - Control Rod Drive !
DCR - Design Change Request i EFCV - Excen Flow Check Valve [
ESF - Engineered Safety feature t FW - Feedwater i
'
HPCI - High Pressure Coolant injection LER - Licensee Event Report MCC - Motor Control Center NG - Motor-Generator MWO - Maintenance Work Order NRR - Office of Nuclear Reactor Regulation .
RBED - Reactor Building Equignent Drain j RCIC - Reactor Core Isolation Cooling [
RFP - Reactor feedwater Pump t RRRSW - Residual Hiat Removal Service Water RWCU - Reactor Water Cleanup l