MAY 2 61988 Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5

!

Georgia Power Company

.

ATTN: Mr. R. P. Mcdonald

'

Executive Vice President -

Nuclear Operations

.

P. O. Box 4545 l

Atlanta, GA 30302 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-321/88-09 AND 50-366/88-09 Thank you for your response of April 28, 1988, to our Notice of Violation issued on March 29, 1988, concerning activities conducted at your Hatch facility. We have evaluated your response to Violation A (No. 88-09-01) and have found it meets the requirements of 10 CFR 2.201. We will examine the implementation of your actions to correct Violation A during future inspections.

With respect to Violation B (No. 88-09-03), we have 2;ncluded, for the reasons presented in the enclosure to this letter, that the violation occurred as stated in the Notice of Violation.

Therefore, in accordance with 10 CFR 2.201(a),

please submit to this office within 30 days of the date of this. letter a written statement that, for Violation 2, describes the corrective steps which have been taken and the results achieved, the corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieved.

Regarding Violation C (No. 88-09-05), which you denied, we have forwarded the issue to the Office of Nuclear Reactor Regulation for additional review. The l

results of our analysis will be furnished to you at a later date.

The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-511.

.

l l

We appreciate your cooperation in this matter.

Sincerely, i

i J. Nelson Grace Regional Administrator

.

EH0LosURE CONTAINS Encl 05"#*'

page 2)

SAFEGUARDS INFORM UPON CEPARATION THI PACE IS DECORTilDLLE g

t\\

sAFEGUAROS W

,

,

880617 hh

$1

PDR

,

.e

_

-

..,

...

h Georgia Power Company 2-MAY 2 6 tgg

,

Enclosure:

Re' ion II Evaluation of Licensee

,esponse (Safeguards Information)

cc w/ enc 1:

J.'T. Beckham, Vice President, Plant Hatch H. C. Nix, Plant Manager 0.'M. Fraser, Site Quality Assurance (QA)

Supervisor

.

L. Gucwa, Manager, Nuclear Safety and Licensing bcc w/ enc 1:

NRR/ORIS/SB bec w/ Inspection Summary:

'NRC Resident Inspector Document Control Desk, 016 State of Georgia

-

'RII

'[

RII RI ibdGuire Cie MSink le GJenkins WTobin 05/g/88

/88 05///88 05p/88 05/yf/88

.

<

RII nictosungcoggggg

'3AFEGUARDS INFORMAT!OI ES$^;o$ gy,xgrjod se st AD /88 f/42 15 DEcoNinoLLEst

,

-.

I

..

,

,

.

f WEGUARDS INFORMATION

)

i L ENCLOSURE CONTAINS SAFEGUARDS INFORMAil0N l

i UPON SEPARAll0N THIS PAGE IS DECONTR0llE0 ?

, ', ;

,

Georgia Power

Executive Department SL-4591

.

024QI

'

X7Q17-H120~

y

3 Apri1 28, 1988

-<

dz E

k$

U. S. Nuclear Regulatory Commission

.2.

" f$

M ATTN:

Document Control Desk C

Hashington, D.C.

20555

'y PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 RESPONSE TO INSPECTION REPORT 88-09 Gentlemen:

In response to your letter of March 29, 1988, and in accordance with the provisions of 10 CFR 2.201, Georgia Power Company (GPC) is providing the enclosed response to the Notice of Violation associated with Inspection Report 88-09.

A copy of this response is being provided to NRC Region II for review.

In the enclosures, a transcription of the NP.C violation precedes GPC's response.

The enclosures contain Safeguards information.

He request that the enclosures be exempt from public disclosure pursuant to 10 CFR 73.21.

Should you have any questions in this regard, please contact this office at any time.

Si rel,

/

b l

R. P. Mcdonald Jf'

Executive Vice President, l

Nuclear Operations REB /lc

!

Enclosures:

1. Violation 88-09-01 and GPC Response l

2. Violation 88-09-03 and GPC Response l

3. Violation 88-09-05 and GPC Responsa

c:

(see next page) j

\\

(

[ ENCLOSURE CONTAINS SAFEGUARD

!

ea J//

ggo " "A l

-

.

l

8-

,,

..

.

-.

' Georgia Power A

,

U..S. Nuclear Regulatory Commission April 28, 1988 Page Two c: Georaia Power Comoany Mr. J. T. Beckham, Jr., Vice President - Plant Hatch Mr. L. T. Gucwa, Manager Nuclear Safety and Licensing GO-NORMS U. S. Nuclear Reaulatory Commission. Washinaton. D. C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch i

!

l

_

I

!

SAFEGUARDS INFORMA,TRM I

d^T I UPON SEPARATION THIS PgA,R0gg[g0Lb ENCLOSURfCONTAlNS SAF I

I i

l I

0240I