Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19970111998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern IR 05000321/19970091997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970051997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970061997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19940171994-09-21021 September 1994 Insp Repts 50-321/94-17 & 50-366/94-17 on 940815-0902. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program for ROs & SROs to Verify How Well They Met Training Objectives IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930241993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items IR 05000321/19930181993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items IR 05000321/19930161993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items 1999-09-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19970111998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern IR 05000321/19970091997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970051997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970061997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19940171994-09-21021 September 1994 Insp Repts 50-321/94-17 & 50-366/94-17 on 940815-0902. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program for ROs & SROs to Verify How Well They Met Training Objectives IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930241993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items IR 05000321/19930181993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items IR 05000321/19930161993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items 1999-09-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19970111998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern IR 05000321/19970091997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970051997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970061997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19940171994-09-21021 September 1994 Insp Repts 50-321/94-17 & 50-366/94-17 on 940815-0902. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program for ROs & SROs to Verify How Well They Met Training Objectives IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930241993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items IR 05000321/19930181993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items IR 05000321/19930161993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items 1999-09-16
[Table view] Category:UTILITY
MONTHYEARIR 05000321/19900221990-11-19019 November 1990 Insp Repts 50-321/90-22 & 50-366/90-22 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Design Mods & Changes & Followup on SSFI Open Items IR 05000321/19900201990-11-13013 November 1990 Insp Repts 50-321/90-20 & 50-366/90-20 on 900915-1020. Violations Noted.Major Areas Inspected:Operations Including Two Unit One Scrams,Main Steam Line Radiation Monitor Trip Settings & Setpoint Controls IR 05000321/19900161990-11-0505 November 1990 Insp Repts 50-321/90-16 & 50-366/90-16 on 901001-12.No Violations or Deviations Noted.Major Areas Inspected: Verification of Corrective Actions for Previous Findings in Areas of EOPs IR 05000321/19900211990-11-0101 November 1990 Insp Repts 50-321/90-21 & 50-366/90-21 on 901001-05.No Violations or Deviations Noted.Major Areas Inspected:Whole Body Counter & Radioanalytical Lab Qc,Fuel Quality & ALARA IR 05000321/19900191990-10-18018 October 1990 Insp Repts 50-321/90-19 & 50-366/90-19 on 900925-28.No Violations Noted.Major Areas Inspected:Annual Emergency Exercise IR 05000321/19900171990-10-12012 October 1990 Insp Repts 50-321/90-17 & 50-366/90-17 on 900911-14.No Violations or Deviations Noted.Major Areas Inspected: Compliance W/Atws Rule IR 05000321/19900141990-07-12012 July 1990 Insp Repts 50-321/90-14 & 50-366/90-14 on 900512-0622.No Specific Strengths or Weaknesses of Licensee Programs Noted. Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation & Events IR 05000321/19900091990-06-0101 June 1990 Insp Repts 50-321/90-09 & 50-366/90-09 on 900331-0511. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing, Allegation Followup & ROs IR 05000321/19900121990-05-0909 May 1990 Insp Repts 50-321/90-12 & 50-366/90-12 on 900416-20.No Violations or Deviations Noted.Major Areas inspected:18 Month Tech Spec Surveillance,Generic Ltr 89-13 & Svc Water Sys Problems Affecting safety-related Equipment IR 05000321/19900111990-05-0303 May 1990 Insp Repts 50-321/90-11 & 50-366/90-11 on 900416-20.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings IR 05000321/19900081990-04-20020 April 1990 Insp Repts 50-321/90-08 & 50-366/90-08 on 900319-23 & 28-31. No Violations or Deviations Noted.Major Areas Inspected: Drywell High Dose Rates,Hydrogen Water Chemistry & Strike Coverage IR 05000321/19900061990-04-18018 April 1990 Insp Repts 50-321/90-06 & 50-366/90-06 on 900305-09 & 19-23. No Violations or Deviations Noted.Major Areas Inspected: Licensee Conformace to Reg Guide 1.97 & Licensee Actions on Previous Insp Findings IR 05000321/19900041990-04-10010 April 1990 Insp Repts 50-321/90-04 & 50-366/90-04 on 900226-0302 & 12-16.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Observation of Work & Work Activities & Review of Radiographs IR 05000321/19900051990-04-0606 April 1990 Insp Repts 50-321/90-05 & 50-366/90-05 on 900217-0330. Violation Noted But Not Cited.Major Areas Inspected: Operational Safety Verification,Maint & Surveillance Testing Observation,Ros,Operator Reactor Events & 10CFR21 Followup IR 05000321/19900031990-03-23023 March 1990 Insp Repts 50-321/90-03 & 50-366/90-03 on 900220-23. Violation Noted Re Min Dilution Flow Alarm/Trip Setpoint for Flow Monitors.Major Areas Inspected:Liquid & Gaseous Radwaste/Effluent Monitoring & Environ Monitoring IR 05000321/19900011990-03-0202 March 1990 Insp Repts 50-321/90-01 & 50-366/90-01 on 900106-0216. Violations Noted Re Proper Position of HPCI Valve & Shift Turnover Briefing.Major Areas Inspected:Operational Safety Verification,Maint Observation & ESF Sys Walkdown IR 05000321/19890321989-12-0404 December 1989 Insp Repts 50-321/89-32,50-366/89-32,50-424/89-34 & 50-425/89-39 on 891115-17.No Violations or Deviations Noted. Major Areas Inspected:Environ Monitoring & QA for Corporate Environ Lab IR 05000321/19890161989-09-20020 September 1989 Insp Repts 50-321/89-16 & 50-366/89-16 on 890722-0825. Violations Noted Re Surveillance Tracking Software Deficiency Resulting in Deactivation of Task.Major Areas Inspected:Operational Safety Verification & Maint IR 05000321/19890171989-09-0101 September 1989 Insp Repts 50-321/89-17 & 50-366/89-17 on 890612-16 & 0731- 0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Liquid & Gaseous Radwaste Processing,Control Room Habitability & Water Chemistry IR 05000321/19890181989-08-31031 August 1989 Insp Repts 50-321/89-18 & 50-366/89-18 on 890807-11. Violation Noted Re Failure to Repair Components of post- Accident Sampling Sys.Major Areas Inspected:Emergency Preparedness,Including Emergency Kits & Equipment IR 05000321/19890131989-08-23023 August 1989 Insp Repts 50-321/89-13 & 50-366/89-13 on 890710-13. Violations Noted.Major Areas Inspected:Review of Licensee Organization & Mgt Controls,External Exposure Controls, Dosimetry,Alara Program & Solid Radwaste IR 05000336/19890161989-08-21021 August 1989 Insp Rept 50-336/89-16 on 890616-0726.Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint, Previously Identified Items,Committee Activities,Emergency Diesel Generator Operation & Fuel Oil Sys IR 05000321/19890151989-08-16016 August 1989 Insp Repts 50-321/89-15 & 50-366/89-15 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Nrc Bulletin 80-11,masonry Wall Design & Licensee Action on Previous Insp Findings IR 05000321/19890141989-08-0303 August 1989 Insp Repts 50-321/89-14 & 50-366/89-14 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions on Previous Insp Findings IR 05000321/19890121989-08-0202 August 1989 Insp Repts 50-321/89-12 & 50-366/89-12 on 890624-0721. Licensee-identified Violations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observation,Ros & Surveillance Procedures & Records IR 05000321/19890111989-07-10010 July 1989 Insp Repts 50-321/89-11 & 50-366/89-11 on 890619-23. Violation Noted.Major Areas Inspected:Licensee Actions Re Previous Insp Findings & NRC Bulletins IR 05000321/19890101989-07-0505 July 1989 Insp Repts 50-321/89-10 & 50-366/89-10 on 8905270623.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Calibr & Surveillance Procedures & Records IR 05000321/19890071989-06-19019 June 1989 Insp Repts 50-321/89-07 & 50-366/89-07 on 890422-0526. Licensee Identified Violations Not Being Cited.Major Areas Inspected:Operational Safety Verification,Maint Observations & Surveillance Testing Observations IR 05000321/19890091989-06-0909 June 1989 Partially Withheld Insp Repts 50-321/89-09 & 50-366/89-09 on 890522-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Plan Audit, Testing & Maint,Protected & Vital Areas & Alarm Stations ML20245D5311989-05-22022 May 1989 Insp Repts 50-321/89-02 & 50-366/89-02 on 890227-0317. Violations Noted.Major Areas Inspected:Maint Program & Implementation.Per NRC Temporary Instruction 2515/97 IR 05000321/19890061989-05-0808 May 1989 Insp Repts 50-321/89-06 & 50-366/89-06 on 890321-0421. Violation Noted.Major Areas Inspected:Operational Safety Verification,Ros,Surveillance Testing Observations,Maint observations,10CFR21 Insp & TMI Items IR 05000321/19890051989-04-13013 April 1989 Partially Withheld Insp Repts 50-321/89-05 & 50-366/89-05 on 890320-24 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Records & Repts & Testing & Maint IR 05000321/19890041989-04-11011 April 1989 Insp Repts 50-321/89-04 & 50-366/89-04 on 890225-0320. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation,Ros & Visit to Lpdr IR 05000321/19890011989-03-16016 March 1989 Insp Repts 50-321/89-01 & 50-366/89-01 on 890121-0224. Violations Noted Re Deficient RHR Valve Operability Procedure.Major Areas Inspected:Operational Safety Verification,Maint Observation & Diesel Generator Fuel Oil IR 05000321/19890031989-03-10010 March 1989 Insp Repts 50-321/89-03 & 50-366/89-03 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention/Protection Program Implementation & Followup on Previously Identified Items IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000321/19880421989-02-15015 February 1989 Insp Repts 50-321/88-42 & 50-366/88-42 on 881224-890120.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Esf Sys Walkdown,Ros, Followup on NRC Bulletin 88-03 & Part 21 Rept IR 05000321/19880301988-11-0808 November 1988 Insp Repts 50-321/88-30 & 50-366/88-30 on 880924-1021. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Testing Observations,Ros, Util Operational Upgrade Efforts & Refueling Activities IR 05000321/19880291988-10-12012 October 1988 Insp Repts 50-321/88-29 & 50-366/88-29 on 880820-0923.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations & Surveillance Testing Observations & Physical Security IR 05000321/19880271988-09-28028 September 1988 Partially Withheld Insp Repts 50-321/88-27 & 50-366/88-27 on 880822-26 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Locks,Keys & Combinations & Access Controls IR 05000321/19880241988-09-22022 September 1988 Insp Repts 50-321/88-24 & 50-366/88-24 on 880723-0819 & 0822-24.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Plant Mods,Esf Sys Walkdowns & Review of Licensee Operational Upgrade Efforts ML20155A2121988-09-22022 September 1988 Insp Repts 50-321/88-24 & 50-366/88-24 on 880723-0819 & 0822-24.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Plant Mods,Esf Sys Walkdowns & Review of Licensee Operational Upgrade Efforts IR 05000321/19880251988-09-22022 September 1988 Insp Repts 50-321/88-25 & 50-366/88-25 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Operational Readiness of Site Emergency Preparedness Program.Weakness Noted Re Current Administrative Control IR 05000321/19880261988-09-0909 September 1988 Insp Repts 50-321/88-26 & 50-366/88-26 on 880816-19.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste,Transportation of Radioactive Matl,Followup on Previous Insp Items & Selected NRC Info Notices IR 05000321/19880221988-08-30030 August 1988 Insp Repts 50-321/88-22 & 50-366/88-22 on 880625-0722.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Radiological Protection & Physical Security IR 05000321/19880231988-08-15015 August 1988 Insp Repts 50-321/88-23 & 50-366/88-23 on 880801-05.No Violations Noted.Major Areas Inspected:Review of Completed post-refueling Startup Tests,Thermal Limits Monitoring, Thermal Power Monitoring & Nuclear Instrument Calibrs IR 05000321/19880211988-07-22022 July 1988 Insp Repts 50-321/88-21 & 50-366/88-21 on 880620-24. Violations Noted.Major Areas Inspected:Fire Protection/ Prevention & Followup on Previously Identified Insp Findings ML20151L9451988-07-21021 July 1988 Insp Repts 50-321/88-17 & 50-366/88-17 on 880521-0624. Violations & Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations, Surveillance Testing Observations & Physical Security IR 05000321/19880121988-06-24024 June 1988 Insp Repts 50-321/88-12 & 50-366/88-12 on 880502-10. Deficiencies Noted.Major Areas Inspected:Emergency Operating Procedures,Including QA Measures,Quality of Control Room Drawings & Evaluation of Containment Venting Provisions IR 05000321/19880151988-06-16016 June 1988 Insp Repts 50-321/88-15 & 50-366/88-15 on 880509-20. Violations Noted.Major Areas Inspected:Operational Performance Assessment Re Effectiveness of Various Plant Groups Including,Operations,Qa & Engineering & Training 1990-07-12
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly1999-06-17017 June 1999 PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized1999-05-0707 May 1999 PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury1998-09-18018 September 1998 PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217N1101998-04-21021 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:Maint Personnel Did Not Follow Procedures & Conducted Work That Was Not Specified on Maint Work Order Which Was Outside Approved Personnel Protection Clearance Boundary ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216E7931998-03-10010 March 1998 Notice of Violation from Insp on 971228-980207.Violation Noted:As of 980207,measures Not Correctly Implemented in That Proposed Vendor Manual Change for Sys Not Submitted to Reflect Lower Set Point Requirement for PCV 2T48-F466 ML20199F5061998-01-23023 January 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:On 971118,4 H Reporting Requirement Was Not Met. Several Workers Involved in Unit 2 Outage Activities Signed Into RCA on Improper RWPs Between 970317-0411 IR 05000321/19970111998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 07100116/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:On 971118,4 H Reporting Requirement Was Not Met. Several Workers Involved in Unit 2 Outage Activities Signed Into RCA on Improper RWPs Between 970317-0411 ML20197F3571997-12-15015 December 1997 Notice of Violation from Insp on 971005-1115.Violation Noted:Licensee Failed to Label Properly Eight Spent Vacuum Filters Having Max Contact Dose Rates Ranging from 4.7 to 7.5 Rem Per Hour Which Were Suspended from Unit 1 Catwalk IR 07100005/20110151997-12-15015 December 1997 Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006 ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20197F3711997-12-15015 December 1997 Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006 ML20199G9381997-12-0101 December 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:On 970320,L Tillman Engaged in Deliberate Misconduct Causing Licensee to Be in Violation of TS 5.4,by Failing to Rept That Work Was Mistakenly Performed on Valve 2E51-F102 PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown1997-11-21021 November 1997 PNO-II-97-060:on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown IR 05000321/19970091997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20199B8121997-11-0303 November 1997 Notice of Violation from Insp on 970817-1004.Violation Noted:Written Procedures Were Not Implemented on 970815 & Maintenance Work Was Completed Using Maintenance Work Order W/Inadequate Instructions IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7051997-07-25025 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:On 970609,steps 8.4.5 & 8.5.2 of Administration Control Procedure 30AC-OPS-001-OS,rev 15 Were Not Correctly Implemented ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970051997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970061997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6581997-07-17017 July 1997 Notice of Violation from Insp on 970609-13.Violation Noted: Improperly Stored Matl,Which Had Potential to Impact Performance of Safety Related Equipment in Control Room, Was Identified ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8641997-06-17017 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Listed Examples of Inadequate Testing Procedures Were Identified ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors ML20140C2301997-05-30030 May 1997 Notice of Violation from Insp on 970428-0502.Violation Noted:Policies & Procedures Were Not Adequately Implemented in Employee Assistance Program Info & Released W/O Written Permission from Employee ML20148B8191997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Sections 8.12,8.13,4.2.2,4.7.7 & 8.8.3 of Procedure 30AC-OPS-001-OS Were Not Correctly Implemented IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000321/19973001997-04-0404 April 1997 NRC Operator Licensing Exam Repts 50-321/97-300 & 50-366/97-300 on 970314-20.Exam Results:All Candidates Passed Exam IR 05000321/19970991997-04-0404 April 1997 SALP Repts 50-321/97-99 & 50-366/97-99 for 950528-970222 ML20137F6301997-03-24024 March 1997 Notice of Violation from Insp on 970119-0222.Violation Noted:Design Control Requirements Not Translated Into Specifications ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support 1999-09-16
[Table view] |
Inspection Report - Hatch - 1988024 |
---|
|
|
Text
.
.
'
.,
58 " 49
.,
?
t UNITED STATES
- i g
NUCLEAR REGULATORY COMMISSION
,
e-REGION ll
\\ e,,,, j[
101 MARIETTA ST., N.W.
ATLANTA. GEORGIA 30323 jf i
,
'
Report Numbers:
50-321/88-24 and 50-366/88-24
. Lic9n see: ' Georgia Power Company P.O.-Box'4545 Atlanta, GA 30302 pf Docket Numbers:
50-321 and 50-366 License Numbers:
DPR-57 and NPF-5 l
i Facility Name: Hatch 1 and 2
~
'Inspution Dates: July 23 - August 19 and August 22-24, 1988 Inspection at Hatch site near Baxley, Georgia
,
!
. Inspectors:
[
d OM'M m
Joh G. Menning, Senior Resident Inspector Oate Signed
/
Ey/. 5 ~- w
,4 f-22-W n
RaFidall A. Musser, Residerit -Inspector Date Signed
Accompanying Personnel:,MichaJ7E.Ernstes Approved by:]]'{'fl _
L$G Y - &Z ~WW
'
~
i1 Marvin W '$fnKL1'e,"Cnief, Project Section 3B
'Date Signed Division of Reactor Projects
.
SUMMARY
>
Scope:
A routine inspection was conducted at the site in the areas of
Operational Safety Verification, Maintenance Observations, Plant
Modifications, Surveillance Testing Observations, ESF System
Walkdowns, Radiological Protection, Physical Security, Reportable Occurrences, Operating Reactor Events, Three Mile Island Items, i
'
!
and Review of t.icensee Operational Upgrade Ef forts.
A reactive
inspertion was also conducted at the site to investigate a facility identified problem associated with Certification of Medical Records.
Results:
Two violations were identified. One violation involved an inadequate I
I EHC system drawing, and the other violation involved for an inadequate
turbine bearing oil system procedure, i
r h
>
f Q
i L
4.---
---
.
..
.
.,
._,
,,,
_., _. _, _ _, _
_, _ _ _,, _ _. _ _,, _ _ _ _ _, _,. _ _ _ _. _,
_,,_m_,_._____
,
_ _ _ _ _ _ _
_
__
. _ _
. _ _ _ _ _ _ _ _ _ _
'.
'
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees C. Coggin, Training and Emergency Preparedness Manager D. Davis, Manager General Support
- K. Oyar, Senior Quality Assurance Field Representative J. Fitzsimmons, Nuclear Security Manager
- P. Fornel, Maintenance Manager
- 0. Fraser, Site Quality Assurance Manager
- M. Googe, Outages and Planning Manager
- R. Granthum, Operating Training Superintendent / Acting Manager
- J. Lewis, Acting Operations Manager
- 0. Moore, Nuclear Training Coordinator - Corporate
- J. Payne, Senior Plant Engineer T. Powers, Engineering Manager 0. Read, Plant Support Manager
- S. Tipps, Nuclear Safety and Compliance Manager R. Zavadoski, Health Physics and Chemistry Manager Other licensee employees contacted included technicians, operators, mechanics, security force members and office personnel.
NRC Resident Inspectors
- J. Monning R. Musser Other NRC Inspectors
- M. Ernstes
- Attended exit interview on August 22, 1988
- Attended exit interview on August 24, 1988
- Attended both exit interviews Acronyms and initialisms used throughout this report are listed in the last paragraph, 2.
Operational Safety Verification (71707) Units 1 and 2 The inspectors kept themselves informed on a daily basis of the overall plant status and any significant safety matters related to plant operations. Daily discussions were held with plant management and various members of the plant operating staff. The inspectors made frequent visits to the control room. Observations included instrument readings, setpoints
.
and recordings, status of operating systems, tags and clearances on equipment, control s and switches, annunciator alarms, adherence to limiting conditions for operation, temporary alterations in effect, daily journals and data sheet entries, control room manning, and access controls. This inspection activity included numerous informal discussions with operators and their supervisors. Weekly, when on site, selected ESF systems were confirmed operable.
The confirmation was made by verifying the following: accessible valve flow path alignment, power supply breaker and fuse status, instrumentation, major component leakage, lubrication, cooling, and general condition.
General plant tours were conducted on at letst a weekly basis. Portions of the control building, turbine building, reactor building, and outside areas were visited.
Observations includeo general plant / equipment conditions, safety related tagout verifications, shift turnover, sampling program, housekeeping and general plant conditions, fire protection equipment, control of activities in progress, radiation protection controls, physical security, problem identification systems, missile hazards, instrumentation and alarms in the control room, and containment isolation.
,
t In the area of housekeeping the following discrepancie: were observed by the inspector and brought to the attention of licensee pecsonnel:
'
On August 1, 1938, empty boxes and other trash were observed in the vicinity of Unit 2 RWCU precoat pump 2G31-C003.
This pump is located on elevation 185 in the Unit 2 reactor building, On August 2, 1988, various items of equipment were observed under and around control room ventilation condensing unit 1Z41-B008B.
These items had apparently not been removed after maintenance on this unit.
On July 25, 1988, the licensee informed the inspector that medical records were found to be incomplete for 24 licensed individuals.
More specifically, it was determined that blood testing and urinalysis had not been performed on these individuals as required by ANSI Standard 3.4.
On August 12, 1988, the inspector was informed that additional checking revealed that the medical records for 62 licensed individuals were
,
incomplete.
Pulmonary function testing had not been performed on 24 individuals.
Blood testing, urinalysis, and pulmcnary function testing had not been performed on the remaining 33 individuals.
The licensee informed the inspector on August 12, 1988, that they planned to have most of the required testing performed within a two-week period.
This licensee-identified matter was followed by the regional inspection staf f (paragraph 13).
At 1647 on August 5,
1983, Unit 2 automatically scrammed from
,
approximately 100 percent of rated power. This scram was caused by trips of the condensate booster and reactor feed pumps. The loss of condensate and feedwater flow resulted in a low reactor vessel water level condition.
The events of this scram are discussed in paragraph 10.
Following the
.
completion of necessary corrective actions, the Unit 2 reactor was again critical at 2239 on August 6.
Unit 2 entered the RUN mode at 0420, and the main generator was synchronized with the grid at 1125 on August 7, 1988.
Rated power was achieved at 2300 on August 8, 1988.
At 2004 on August 9, 1988, the Unit 2 low pressure turbine intercept valves were inadvertently closed while operations personnel were placing an equipment clearance on the EHC system.
Unit 2 was operating at approximately 100 percent of rated power at the time of this event.
Clearance No. 2-88-1336 was being placed to support replacement of the "B" EHC pump. The clearance required the closing of valve 2N32-FV20. When the FV20 valve was closed, low pressure turbine intercept valves Nos. 3 and 4 went fully closed, and intercept valves Nos. 1 and 2 went approximately 60 percent closed.
Control room personnel observed the closing of the intercept valves and immediately reduced power to approximately 50 percent of rated. The FV20 valve was reopened, and all four intercept valves responded by opening fully.
The licensae subsequently conducted an inspection of the condenser bay area of the turbine building and ensured that plant conditions had stabilized prior to increasing power.
Rated power was again achieved at 0037 on August 10, 1988.
Investigation showed that the event on August 9,1988, was caused by a deficient drawing. Drawing H-21243 was used by operations personnel when the equipment clearance was prepared.
This drawing indicated that valve FV20 could be closed without isclating EHC fluid from the low pressure turbine intercept valves.
A review of the as-built configuration showed that the print did not accurately reflect the EHC pump discharge piping.
Regulatory requirements in 10 CFR Part 50, Appendix B, Criterion V,
"Instructions, Procedures, and Orawings," specify that activities affecting quality are to be prescribed and accomplished with documented instructions, procedures, or drawings.
The inadequate drawing is considered to be a violation of this regulatory requirement. This matter will be tracked as violation 366/88-24-01, Inadequate EHC Drawing.
Ore violation was identified.
3.
Mai nteriance 'Aservations (62703) Units 1 and 2 During ti port period, the insoectors observed selected maintenance activities ihe observations included a review of the work documents for adequacy, adherence to procedures, proper tagouts, adherence to technical specifications, radiological controls, observation of all or part of the actual work and/or retesting in progress, specified retest requirements.
and adherence to the appropriate quality controls.
The primary maintenance observations during this month are sumnarized below:
_
_
-
_
_
_
- _.
..
Maintenance Activity Date a.
Replacement of Fire Pump Controller 07/27/88 Piping on Diesel Fire Pump No. 3 per
-
MWO 1-88-2607 and DCR 87-81.
(Unit 1)
b.
Replacement of the RHRSW Air Release 08/02/88 Valve (1E11-F904A) per MWO 1-88-1016.
(Unit 1)
c.
Repair of Post LOCA Radiation Monitor 08/12/88 1011-K622C per MWO 1-88-4672. (Unit 1)
d.
Troubleshooting of LPCI Inverter 08/19/88 1R44-S002 per MWO 1-88-4855 (Unit 1)
As discussed in NRC Inspection Report Nos. 50-321/88-22 and 50-366/88-22, problems were experienced with Unit 1 LPCI inverter 1R44-5002 during the previous reporting period.
Additional LPCI inverter problems were experienced in Unit 1 during this reporting period. On August 1, 1988, LPCI inverter 1R44-5002 tripped. On August 2, 1988, operations personnel received a trouble alarm for Unit 1 LPCI inverter 1R44-5003.
Investigation revealed that fuses had been blown. On August 11, 1988, operations personnel again received a trouble alarm for 1R44-S003.
Investigation revealed that fuses had blown again.
Inverter 1R44-S003 experienced an apparently identical problem on August 12, 1988.
It appeared to the inspector that the licensee's maintenance efforts had been ineffective in identifying and correcting the basic caucc(3) of the LPCI inverter problems. In discussing these concerns with licensee personnel, the inspector learned that the licensee had formed an event review team to
'nvestigate these events.
Additionally, a vendor representative was sent to the site to inspect the inverters.
As noted above, the inspector observed some of the vendor representative's activities on August 19, 1988. The inspector will review this team's report and any corrective actions that result from the investigation.
No violations or deviations were identified.
4.
Plant Modifications (37700) Units 1 and 2 The inspector reviewed documentation packages for selected DCRs that had been implemented and closed by the licensee.
The review included verification that the design changes had been reviewed and approved in accordance with the technical specifications and 10 CFR 50.59, controlled by approved procedures, and verified by appropriate post installation testing and/or inspections. The review also included verification that plant procedures, operator training programs, as built drawings, preventive mai ;enance programs, and the ISI/IST programs were revised, as appropriate, prior to the modification being declared operabl..
.
The DCRs involved in this review were identified by the licensee as Nos.86-218 and 86-219.
No violations or deviations were identified.
5.
Surveillance Testing Observations (61726) Units 1 and 2 The inspectors observed the performance of selected surveillances.
The observation included a review of the procedure for technical adequacy, conformance to technical specifications, verification of test instrument calibration, observation of all or part of the actual surveillances, removal from service and return to service of the system or components affected, and review of the data for acceptability based upon the acceptance criteria. The primary surveillance testing observations during this month are summarized below:
Surveillance Testing Activity Date a.
Channel Functional Test and Calibration 07/26/88 for ATTS Panel 1H11-P926 per procedure 57SV-SUV-012-15 (Unit 1)
b.
RCIC Pump operability test per 08/02/88 procedure 345V-E51-002-15 (Unit 1)
c.
Core Spray Pump IST per procedure 08/05/88 34SV-E21-001-2S (Unit 2)
On August 2, 1988, while observing the Unit 1 RCIC pump operability test, the inspector noted that the "RCIC Barometric Condenser High Pressure" annunciator came in.
The operator performing the test responded by entering the appropriate ARP.
All items identified by the ARP as probable causes for the alarm were checked and all were found to be satisfactory.
The pressure in the condenser was holding steady at 3 inches of Hg Vacuum, the alarm setpoint. Since the above condition did not affect the operability of the system, the test was successfully completed.
Discussions with the system engineer confirmed that the purpose of the RCIC barometric condenser is to ensure proper gland sealing capability of the RCIC turbine. Additionally, the engineer stated that the high pressure condition was caused by ar improperly set cooling water flow control valve.
This condition will be corrected during the next surveillance of the Unit 1 RCIC system.
On August 5, 1988, while observing the Core Spray Pump 2B IST, the inspector noted some problems with the procedure in use, 345V-E21-001-25.
These items were brought to the attention of the Unit 2 Shift Supervisor.
The following is a summation of the problems noted.
(1) Step 7.2.10 states, "THROTTLE OPEN Core Spray Test Valve, 2E21-F015B, to obtain a flow on Flos
- dicator 2E21-R601B, exactly equal to the reference flow recorded....d It is not possible to obtain a flow rate exactly equal to the reference flow as the Flow Indicator reads in divisions of 100 gpm
..
.
(between 4000-5000 gpm). (2) Step 7.2.11 states, "WHEN Core Spray flow is greater than 950 GPM, confirm that Core Spray Minimum Flow Valve, 2E21-F0318, CLOSES." This step is difficult to perform due to the coarse scale on flow indicator 2E21-R6018.
(3) Step 7.2.22 states, "WHEN Core Spray Flow decreases to less than 700 GPM, confirm that Core Spray Minimum Flow Valve, 2E21-F0318, OPENS." This step is also difficult to perform due to the coarse scale on flow indicator 2E21-R601B. The reading of this flow indicator at low flow ranges is a problem with all four loops of core spray, loop A and B for each unit.
No violations or deviations were identified.
'
6.
ESF System Walkdowns (71710) Unit 1 The inspectors routinely conducted partial walkdowns of ESF systems. Valve and breaker / switch lineups and equipment conditions were randomly verified both locally and in the control room to ensure that lineups were in
,
accordance with operability requirements and that equipment material conditions were satisfactory. The MCREC system was walked down in detail on August 2, 1988.
As noted in paragraph 3, a housekeeping discrepancy was observed at that time and brought to the attention of the Unit 1 Shift Supervisor.
No violations or deviations were noted.
7.
Radiological Protection (71709) Units 1 and 2 The resident inspectors reviewed aspects of the licensee's radiological protection orogram in the course of the monthly activities.
The performance of health physics and other personnel was observed on various shif ts to include:
involvement of health physics supervision, use of radiation work permits, use of personnel monitoring equipment, control of high radiation areas, use of friskers and personal contamination fronitors, and posting and labeling.
No violations or deviations were noted.
8.
Physical Security (71881) Units 1 and 2 In the course of the monthly activities, the resident inspectors included a review of the licensee's rhysical secu-ity program. The performance of various shifts of the secur force was coserved in the conduct of daily i y of t.,pervnsion, availability of armed activities to include: aya t
response personnel, protectt vital access controls, searching of personnel, packages and vehicle, vadge issuance and retrieval, escorting of visitors, patrols and compensatory posts.
No violations or deviations were note _
.
..
.
9.
Reportable Occurrences (90712 and 92700) Units 1 and 2 A number of Licensee Event Reports (LER) were reviewed for potential generic impact, to detect trends, and to determine whether corrective actions appeared appropriate. Events which were reported immediately were also reviewed as they occurred to determine that technical specifications were being met and the public health and safety were of utmost consideration.
Unit 1:
88-05 Personnel Error Causes Air Introduction Into Turbine Lube Oil Coolers Resulting in Scram The events of this LER concern an improper exchange of main turbine lube oil coolers that resulted in a turbine trip and reactor scram. 1he scram occurred on April 19, 1988, and was discussed in NRC Inspection Report Nos. 50-321/88-11 and 50-366/88-11.
Investigation revealed that the turbine bearing oil system operating procedure (3450-N34-008-1N) did not address the exchange of these coolers.
Personnel
,
t performed the exchange operation without procedural
guidance and inadvertently introduced air into the turbine lube oil system.
Technical Specification 6.8.1.a requires that written procedures be estabitshed, implemented, and maintained covering the activities referenced in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.
Section 4 of Appendix
"A" of Regul6 tory Guide 1.33 recommends procedures for the operatior, of the turbine generator system.
This matter is considered a violation of Technical Specification 6.8.1.a and will be tracked as i
violation 321/88-24-02, Inadequate Turbine Bearing 011 l
System Procedure.
88-07 Lack of Administrative Control Causes Potential Diesel Generator Inoperability This LER concerns the closing of rollup fire door IL48-D143 for D/G 1R43-50018 room without adequate consideration of the affect on D/G operability. The
fire door was initially found to be stuck at mid l
position and then closed to comply with requirements of the Fire Hazard Analysis.
The licensee subsequently questioned whether the rollup fire door's closed position could adversely affect the operability of 0/G 1R43-50018.
An engineering study and special testing have established that the D/G room maximum
,
design temperature (122*F) would be exceeded af ter approximately 19 minutes of operation at 2800 KW on a 95'F day. The licensee's corrective actions were reviewed by the inspector. This matter appears to be
.
.
.
a violation of Technical Specification 0/G operability requirements.
However, since all the requirements specified in 10 CFR Part 2, Appendix C, Section V, were satisfied, this licensee-identified violation is not being cited. Additionally, review of the LER is closed.
88-10 Deficient Procedure Allows Configuration Where Monitors Do Not Meet Operability Requirements This LER concerns a configuration of the Recombiner Building Ventilation Radiation Noble Gas Monitors that would preclude annunciation of an inoperable or downscale condition in the main control room.
The Recombiner Building Ventilation Radiation Noble Gas Detection System consists of two separate monitors.
These monitors were being maintained with one in service while the other monitor was in a standby mode.
The licensee determined that under these conditions failure of the monitor in service due to an inoperable or downscale condition would not be annunciated in the control room.
Table 4.14.2-1, Item 3.a, of the technical specification requires that main control room annunciation on inoperable or downscale conditions be demonstrated during quarterly functional testing.
Correctite action involved doactivating the redundant nonitor and initiating procedure changes to ensure that the redundant monitor is maintained in either a deactivated or fully operable condition.
This matter appears to be a violation of the previously cited technical specification requirements.
However, since all the requirements spectfied ir 10 CFR Part 2, Appendix C, Section V, were satisf1ed, this licensee-identified violation is not being cited.
Review of the LER is closed.
Unit 2:
87-10 Failed Instrument Line Leakage Exceeds Allowable Limits Resulting in Reactor Shutdown This LER was previously discussed in NRC Inspection Report Nos. 50-321/88-22 and 50-366/88-22. Review of the LER remained open pending the receipt of a revision to the LER providing the results of a metallurgical analysis of the failed instrument line.
Revision 1 of ti.e LER was issued on August 12, 1988.
The licensee has determined that the failure mode was high cycle f atigue.
The licensee intends to perform an engineering evaluation of this instrument line and its supports to determine if additional modifications are needed to prevent additional high cycle fatigue failures.
Review of this LER is close _ _ __ __ __ __. _ ____ _ __ _____ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
%
- -
.
09-01 Inadequate Procedure Causes Mis-Assembly of Valve Resulting in ESF System Inoperability
.
This LER concerns the mis-assembly of the Unit 2 HPCI turbine stop valve.
The problem was initially identified when operations personnel noted a double position indication, indicating that the valve was between the open and closed position.
During subsequent troubleshooting involving stroking of the valve, the valve stuck at approximately 50 percent closed and a metal-to-metal binding noise was heard.
Disassembly of the valve revealed that the split coupling connecting the valve stem to the hydraulic actuator piston rod had a clearance of 5/8 of an inch between the stem and piston rod. The clearance should have been no greater than 1/16 of an inch.
Investigation showed that the stop valve was last disassembled and reassembled in June of 1983. Review of the procedure used at that time revealed that it failed to provide step-by-step instructions for reassembly of the valve.
It was concluded that procedural inadequacies resulted in the improper adjustment of the clearance between the stem and th2 piston rod.
Correcti/e actions involved initiating procedure changes to provide better valve reassembly instructions and ensuring that the Unit 1 HPCI turbine stop valve was properly assembled.
Technical Specification 6.8.1.a requires that written procedures be established, implemented, and maintained covering the activities referenced in Appendix
"A" of Regulatory Guide 1.33, Revision 2,
February 1978.
Section 9 of Appendix
"A" of Regulatory Guide 1.33 states that maintenance that can affect the performance of safety-related equipment should be performed in accordance with written procedures, documented ins ructions, or appropriate drawings. The inadequate maintenance procedure appears to constitute a violation of Technical Specification 6.8.1.a.
However, since all the requirements specified in
,
10 CFR Part 2, Appendix C, Section V, were satisfied, this lice.isee-identified violation is not being cited.
Review of the LER is closed.
88-08 Calibration Procedural Deficiency for Feedwater Controller Causes Low Water Level Scram
'
The events of this LER concern the Unit 2 reactor scram on March 21, 1988. Prior to the scram, control room personnel were in the process of trans/ erring the FCS from startup control to single element control as part of normal unit startup operations. Fluctuations
i
.
y
_
_ _. _ _ _.
..7
_. - _ -
,
-
.
.
.
.
in reactor vessel water level were observed and the
"2A" RFP subsequently tripped on low suction pressure.
The FCS instability was attributed to improper settings on the master controller module (2C32-K636).
The licensee could not establish when the controller settings had been changed to the incorrect values.
However, the involved calibration procedure (57CP-CAL-048-2) was found to be deficient in that it did not require the recording of as-found and as-lef t settings for the controller (2C32-K636) and the control amplifier (2C32-K637). The inspector reviewed the l icerisee 's corrective actions which included development of a more comprehensive procedure for calibration of the FCS master control loop. Review of this LER is closed.
88-19 Personnel Error Results in Missed Reactor Protection System Functional Test This LER concerns a failure to perform main turbine stop valve RPS surveillance within the interval specified in the technical specifications.
More soecifically, the functional testing requirements of Technical Specification Table 4.3.1-1, Item 9, were not performed on time.
Upon discovery of this situation, the licensee entered the appropriate LCO and initiated the required testing.
Testing per procedure 345V-C71-001-25,
"Turbine Stop Valve Instrument Functional Test,"
was satisfactorily completed and the LC0 was terminated. This matter is considered a violation of the technical specification surveillance requirement.
However, since all the requirements specified in 10 CFR Part 2, Appendix C, Section V, were satisfied, this licensee-identified violation is not being cited.
Review of the LER is closed.
One violation was identified.
10.
Operating Reactor Events (93702) Unit 2 The inspectors reviewed activities associated with the below listed reactor event.
The review included determination of cause, safety significance, performance of personnel and systems, and corrective action.
The inspectors examined instrument recordings, computer printouts, operations journal entries, and scram reports and also had discussions with operations, maintenance, and engineering support personnel as appropriate.
i
,
I
.
..
.
.
Unit 2 automatically scrammed from approximately 100 percent of rated power at 1647 on August 5, 1988. Prior to this event, I&C personnel were installing RFP "2A" minimum flow controller 2N21-R3846 in control room
-
panel 2H11-P662. At that time a 3 amp fuse supplying power to the minimum flow controllers for the condensate pumps, condensate booster pumps, and RFPs blew.
(This fuse is identified as fuse F7 on licensee print H 23840.) Since the air operated minimum flow valves for these pumps are designed to fail open, the valves all opened when power to the controllers was lost.
The condensate booster and RFPs subsequently tripped on low suction pressure.
Reactor vessel water level decreased to approximately minus 65 inches indicated during the transient.
Both HPCI and RCIC auto initiated as expected, returning vessel water level to its normal band.
Reactor pressure was controlled by EHC to less than 920 psig.
No SRVs were actuated.
However, operations personnel noted that RWCU inboard isolation valve 2G31-F001 did not close as expected at the vessel level setpoint for Group V isolation of minus 35 inches.
Investigation revealed that the vessel water level transmitter (2B21-N081B) providing the isolation signal to 2G31-E001 did not respond to level changes.
The defective transmitter was replaced. This transmitter was identified as Rosemount Part No. 11540P5RJ with Serial No. 411213. Licensee personnel indicated to the inspector that the defective transmitter would be returned to the vendor for a failure analysis.
Within the areas inspected, no violations or deviations were identified.
11.
Three Mile Island Items (item numbers from NUREG 0737)
Item II.F.2.3.B concerns the covering of reactor pressure vessel water level reference legs B21-0003A and B with insulation to prevent flashing due to high drywell temperatures. This item remained open pending the completion of work and review of packages for DCRs86-218 and 86-219 for Units 1 and 2, respectively.
DCR 86-218 was closed on October 10, 1987, and was subsequently reviewed by the inspector. DCR 86-219 was closed on April 8,1988, and was subsequently reviewed by the inspector. This item is closed for Units 1 and 2.
No violations or deviations were identified.
12.
Review of Licensee's Operational Upgrade Efforts - Units 1 and 2 As discussed in NRC Inspection Report Nos. 50-321/88-14 and 50-366/88-14, the licensee voluntarily initiated a program in April of 1988 to upgrade certain aspects of operational performance.
The referenced report mentioned that the resident inspectors would review longer term operational upgrade efforts as related activities were completed.
The area discussed below was reviewed during the current reporting period.
Emergency Diesel Generator Testing: The licensee has completed actions to reduce the number of emergency diesel generator fast starts in an effort to prolong engine life and improve reliability.
More specifically, the methodology for conducting monthly operability testing has been changed.
-
_ _ _ _ - _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _
__ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _
..
.
.
In the past, the diesel generators were fast started; i.e, synchronous speed was achieved in a maximum of 12 seconds.
The licensee has revised the monthly operability test procedures to provide for slow starting of the diesels and for barring of the engines following operation.
The inspector reviewed the following surveillance procedures:
Procedure No.
Rev.
Effective Date Diesel Generator 345V-R43-001-IS
06/27/88 1A 34SV-R43-001-2S
06/27/88 2A 34SV-R43-002-15
06/27/88 IB 345V-R43-002-2S
06/27/88 IB 345V-R43-003-IS
06/27/88 1C 345V-R43-003-25
07/19/88 2C Review of the licensee's upgrade efforts in the emergency diesel generator testing area is closed.
No violations or deviations were identified.
13.
Certification of Medical Records (71707) Units 1 and 2 A
reactive inspection was conducted on August 22-24.
1988, by Michael E. Ernstes to investigate a facility identifiec problem associated with the certification of the physical examinations required by 10 CFR 55.23 for operatcr license applications.
Interviews were concucted with training department personnel responsible for submitting NkC Form 396 with license app 11 cations and with the physicians conducting the physical examinations.
On June 16, 1988, a renewal application was submitted by Plant Hatch for an operator who heid a no-solo operators license. The restriction was due to the operator being a diabetic. The NRC requested a copy of his medical evaluation to be reviewed by the NRC doctor.
The Hatch training department discovered at this time that there were no blood tests conducted for his evaluation, Further investigation showed that all examinations conducted by Dr. DeJarnette of Vidalia, Georgia, after June 1987 did not have blood, urine, or plumonary tests.
In addition, the examinations conducted by Dr. Poblete of Baxley, Georgia, did rot have pulmonary tests included.
Effective May 26, 1987, NRC Form 396 was enanged such that the physician signed a single statement stating that the individual met the guidance provided in ANSI /ANS 3.4-1983.
In July 1987, Georgia Power Company held a meeting with the doctors to discuss these changes in documentation.
At this meeting, discussion was given to the possibility of comoining some of the testing on the various types of physicals.
In order to meet the standards established in ANSI /ANS 3.4-1983, Dr. DeJarnette had been taking credit for the blood. urine, and pulmonary tests conducted through the Employee Health Plan.
These physical examinations are performed on-site annually to all licensed personnel.
Dr. Poblete had also been using the
..
..
.
pulmonary tests from the same program as part of their evaluations.
Although all aspects of ANSI /ANS 3.4-1983 had been met, it could not be readily verified from the records of medical examinations. This prompted the training department to establish corrective actions to better ensure that all parts of the standard are met prior to signing NRC Form 396.
In order to verify that the guidance contained in ANSI /ANS 3.4-1933 was followed, all licensed operators who were examined subsequent to &Jne 1987 were reexamined in the areas which had not been performed as part of the physical.
This consisted of 38 individuals getting blood, urine, and pulmonary tests from Dr. DeJarnette and 24 individuals receiving pulmonary tests from Dr. Poblete. All tests were completed for these 62 individuals on August 23, 1988.
None of these test results indicated disqualifying conditions.
To prevent recurrence of this problem, a new medical examination form was developed to be used by the doctors.
This form includes all of the specifics of ANSI /ANS 3.4-1983. In addition, Dan Moore, Nuclear Training Coordinator, Georgia Power Company, will be reviewing all certificates of medical evaluation for completeness prior to signing and submitting NRC Form 396.
In the future, licensing physical examinations will be conducted independently of all other physical examinations.
Dan Moore will also be performing a check of the medical evaluation records at Plant Vogtle to ensure compliance with the previously mentioned standards.
14.
Exit Interview (30703)
The inspection scope and findings were summarized on August 22 and August 24, 1988, with those persons indicated in paragraph 1 above. The licensee did not identify as proprietary any of the material provided to or reviewed by the inspectors during this inspection. Dissenting comments were not received from the licensee.
Item Number Status Description / Reference Paragraph 366/88-24-01 Opened VIOLATION - Inadequate EHC Drawing (paragraph 2)
321/88-24-02 Opened VIOLATION - Inadequate Turbine Bearing 011 System Procedure (paragraph 9)
i
..
,.
,
.
15.
Acronyms and Abbreviations As-Built Notice ABN
-
ANSI American National Standards Institute
-
ARP Annunciator Response Procedure
-
DCR Design Change Request
-
Diesel Generator D/G
-
EHC Electrohydraulic Control System
-
ESF Engineered Safety Feature
-
FCS Feedwater Control System
-
Gallons Per Minute GPM
-
HPCI High Pressure Coolant Injection
-
I&C Instrumentation and Controls
-
ISI Inservice Inspection
-
IST Inservice Testing
-
'
LCO Limiting Condition for Operations
-
Loss of Coolant Accident LOCA
-
LPCI Low Pressure Coolant Injection
-
MCREC - Main Control Room Environmental Control MWO Maintenance Work Order
-
RCIC Reactor Core Isolation Cooling
-
RFP Reactor Feed Pump
-
RHRSW - Residual Heat Removal Service Water i
Reactor Protection System RPS
-
RWCU Reactor Water Cleanup System
-
Safety Relief Valve SRV
-
i