Grants Termination of Requirements Set Forth in Section VA of Order to Permit Operation of Both Units at Full Power
ML20248H804
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/05/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8910120091
Download: ML20248H804 (3)


Text

- --

7

+

+ .

0ctober 5, 1989

. Docket Nos. 50-277-50-278 Philadelphia Electric Company.

ATTN: Mr. C. A. McNeill Executive Vice President-Nuclear Correspondence Control Desk P. 0. Box 7520 Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Termination of Requirements of Order RE: Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 On March 31, 1987, the Executive Director for Operations issued an Order directing the Philadelphia Electric Company to shut down Peach Bottom Atomic Power Station and take certain corrective actions to address concerns including failure of both the line organization and the quality assurance progrcm to identify conditions adverse to safety. The actions outlined in your letter of April 6,1987, were evaluated as part of our inspection program and determined to fulfill the requirements of Sections V.A. and V.B of the Order.

In my letter dated October 19, 1988, the NRC accepted your proposed " Plan for Restart of Peach Bottom Atomic Power Station" in response to the requirements set forth in Section V.C. of.the Order. We conducted an assessment of your implementation of this plan during an Integrated Assessment Team Inspection in February 1989, and concluded that your performance relative to the Peach Bottom facility was at a level sufficient to support safe startup and operation of the facility and that there were no fundamental flaws that would inhibit your l ability to ensure reactor or public safety during plant operation.

On April 26, June 28, and again on July 21, 1989, I relaxed the requirements set forth in Section V.A. of the Order to permit operation of Unit 2 at 35%, 70%

and full power respectively. We conducted an assessment at the 100% NRC holdpoint of your Power Ascension Testing Program. As a resulL, the staff determined that management continues to be aggressive in problem resolution and is directly involved in assuring nuclear safety.

l' 8910120091 epf ooc; gDR ADOCK 05000277 PDC 0FFICIAL RECORD COPY TERM. OF REQUIRE OF ORDER PB -

10/05/89 / 1g

( [SOJ

c w

, ).f, &;'

5 ,

Phila'delphia Electric Company 2 Therefore; in'accordance with Section V.E. of the Order, I hereby fully relax and terminate the requirements set forth in Section V.A. of the Order to permit

-operation of both units at full power.

No reply to this letter is necessary. Thank you-for your cooperation in this matter.

Sincerely, Original Signed By VILLILL T. EUSSELL William T. Russell Regional Administrator cc:

- John S. Kemper, Sr. , Senior Vice President-Nuclear J.-W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station -

Jack Urban, General. Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J.'Bradley, Esquire, Assistant General Counsel (Without-Report)

Raymond L..Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations G. A. Hunger, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document' Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP PA0 (25)-SALP and (2) Inspection Reports R. Martin, NRR J. Dyer, EDO RI:)R F C M 3 : RP PT; P llRR R :9RA RI:RA Doerflein/rh1 W nville ane Murley rtin Russell 9/y1/89 9/A /89 /$/89 /C/[/89 /6/I/89 9//[/89 0FFICIAL RECORD COPY TERM. OF REQUIRE OF ORDER PB -

0002.0.0 09/27/89 I

l

.I . ', ' Philadelphia Electric Company . . ..a ,

Thara hra h **~4-ts with festion YiC4 ur I. lie Oldet ,1 llWPWUy fully P4lix and terminata tha requirements cet forth in Section V.A. of the OrdeF to permit operation of. both units at full power.

No reply to this letter is, necessary. Thank you for your cooperation in this matter.

Sincerely.

Williim T. Russell Wig 16ni1 Administrator CC:

John S. Xemper, Sr., Senior Vice President-Nuclear J. W. Gallagher, Vice President, Nuclear Services E. C. Xistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire ~

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. German, Manager External Affairs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Megette, Power Plant Siting, Nuclear Evaluations G. A. Hunger, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Pubite Document Room (PDR)

Local Publ.ic Document Room (LPDR)

Nuclear Safety Infonnation Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec:

RegionIDocketRoom(withconcurrences)

Management Assistant DRMA (w/o enc!)

Section Chief, DRP PA0 (25) SALP and (2) Inspection Reports R. Martin, NRR J. Dyer, EDO [ TERM. OF REQUIRE OF ORDER PB]

RI:DRP RI:DRP RI:DRP RI:DRA RI:RA Doerflein/rh1 Linville Kane Martin Russell P/ /89 9/ /09 9/ /89 9/ /89 9/ /89 ADP* ,i k ur, ley berman JPar\t' lod T TP

')' 89 h/89 10h4 /89 e 10/M/89 i

_ _ _ _ _ _ _ _