Forwards Safety Insp Repts 50-277/87-15 & 50-278/87-15 on 870425-0531.No Violations Noted.Advises That LER 3-87-01 Did Not Address Operator Inattentiveness Issue Associated W/ Scram on 870317.Revised LER to Be Submitted
ML20234B378
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/26/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20234B380 List:
References
NUDOCS 8707060006
Download: ML20234B378 (2)


See also: IR 05000277/1987015

Text

_. _ _ _

. _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _____

.'

.

2 6 JUN 1987

Docket Nos. 50-277/DPR-44

50-278/DPR-56

l Philadelphia Electric Company

l ATTN: Mr. J. W. Gallagher

Vice President

Nuclear Operations

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

,

Subject: Combined Inspection 50-277/87-15; 50-278/87-15

This transmits the findings of the routine safety inspection by Messrs. i

R. J. Urban, L. E. Myers, and T. P. Johnson on April 25 to May 31,1987, at

the Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings

were based on observation of activities, interviews, measurements and

document reviews, and have been discussed with Mr. D. M. Smith of your )

staff.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

Within the scope of this inspection, no violations were observed. Your

attention is directed to Paragraph 6.2.3. of the enclosed Inspection Report 1

which discussed a concern relative to Licensee Event Report (LER) 3-87-01.

,

!

The LER did not address the operator inattentiveness issue associated with

operator response to control room indications prior to the scram on March 17,

1987. We note that you intend to submit a revised LER which will address the

issue of operator inattentiveness. l

No reply to this letter is required. Your cooperation with us is

appreciated.

Sincerely, l

William F. Kane, Director,

Division of Reactor Projects

Enclosure:

NRC Region I Combined Inspection Report No. 50-277/15 and 50-278/15

i

8707060006 870626

PDR

O

ADOCK 05000277

PDR

Ol

i

Ifl

1

l

_oans, n__ ~~ - - ~ ---- -

e

1

'

Philadelphia Electric Company 2 2 6 JUN 1987

cc w/ enc 1:  !

D. M. Smith, Manager, Peach Bottom Atomic Power Station i

John S. Kemper, Senior Vice President, Engineering and Production

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic l

Electric i

G. Leitch, Nuclear Generation Manager

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Engineer in Charge, Licensing Section

Thomas S. Shaw, Jr. , Vice President - Production, Delmarva Power i

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. Linville, Section Chief, DRP

M. Shanbaky, Chief, FRPS, DRSS

SRI, Limerick I

J. Durr, DRS

R . V6tu ty

Q,{}ySS(SLL kh

l

l

l

l

-

_ , ,

,

'

RI:DRP

Jphnson

RI:DRP

Williams

Rf:DRP

Linville

[RP

Gallo

'Ib'

]

6/.N87 6/p4/87 6/I 787 6/ 7

0FFICIAL' RECORD COPY CIR PB 87-15 - 0002.0.0

06/15/87

- _ _ - _ _ _ _ - _ _ _ _