ML20247K919

From kanterella
Revision as of 08:28, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Electrical Insp Repts 50-277/89-13 & 50-278/89-13 on 890405-07 & 13.Issues to Be Resolved Before Unit 3 Restart Listed.No Violations Noted
ML20247K919
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/18/1989
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20247K925 List:
References
NUDOCS 8906020049
Download: ML20247K919 (3)


See also: IR 05000277/1989013

Text

_ __

.

). ' '

+ ,

t

MAY 181989

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive-Vice President-Nuclear

Correspondence Control Desk

P. O. Box 7520

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Inspection Nos'. 50-277/89-13 and 50-278/89-13

This letter refers to'the electrical inspection conducted by Mr. T. Koshy of

this office on April 5-7 and 13,1989 at your corporate office in Philadelphia,

Pennsylvania. Mr. Koshy discussed the findings of-the inspection with

Mr. R. J. Lees _of your staff at the conclusion of the inspection. In addition,

'Mr. W. V. Johnston (NRC) and Mr. R. J. Lees (PEco) discussed the inspection

findings in a-conference call on April 14, 1989.

The_ areas' examined during the inspection were Unit 2 restart issues identified

in the special electrical team inspection (Report No. 50-277/278-89-07) conducted

on , January 30 - February 10, 1989 and the corrective actions taken by your

staff.

Based on our inspection, continued management attention should be given to

resolution of the following issues for Unit 3.

Voltage Adequacy of DC Equipment

Capacity Margin for Batteries

Emergency Diesel Generator Load Evaluation and Load Control Program

These issues should be resolved before Unit 3 restart.

We acknowledge your letter dated April Id,1989 committing to perform DC system

tests for Unit 2 before the end of the next Unit 2 refueling outage or at any

outage of sufficient duration that commences after July 17, 1989. '

l

Within the scope of this inspection, no violations we e observed.

!

l OFFICIAL RECORD COPY IR PB 2&3 89-13 - 0001.0.0

,

e906020049 89051e 05/17/89

l

PDR ADOCK 05000277

! Q PDC

g ;cj \(

L____ _ _ _ _ _ _ - -

- ._

.

, ya i

'

1

MAY 181989

Philadelphia Electric Company 2 l

f' No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By:

Ylilliam V. Johnston

Thomas T. Martin, Director

Division of Reactor Safety

4

Enclosure: Combined NRC Region I Inspection Report Numbers 50-277/89-13 and

50-278/89-13

cc w/ encl:

. John S. Kemper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nucleer Services

E. C. Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

' Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General' Counsel (Without Report)

Raymond L. Hovis, Esquire i

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (HSIC)

NRC Resident Inspector 4

Commonwealth of Pennsylvania '

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

PA0 (23) SALP and (2) Inspection Reports l

Robert J. Bores, DRSS

R. Martin, NRR

M. Johnson, ED0

!

'

0FFICIAL RECORD COPY IR PB 2&3 89-13 - 0001.2.0

05/11/89

--_ ---_-z - - - - _ - _ - - - - . - - _ -- a

p ,,

t- i ' , - o g;

MAY 181989.

'

f Philadelphia Electric Company 3

'Y

i

i

-)

,

-

bM c0

!

DRS' RI:DRS RI.DRS I:DRS

TKoshy/rw RM CAnderson JStrosnider

4/27/89 4/gthew

7/89 4/87/89 g/ 3 /89

o

0FFICIAL RECORD COPY IR PB 2&3 89-13 - 0002.0.0

04/26/89

.-

-~------Au______ _ _ _ _ _ _ _ , _