MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
-
r E.J. Hroczka 8-25-03 -
corm $cproved by Station Suoerintendent Effective Date t
)
STATION PROCEOURE COVER CHEET A. IDENTIFICATION Number E0P 576 Rev. 1 Title RPV LEVEL RESTORAf!0N EMERGENCY PROCEDURE Prepared By W. R. McCollum ,
B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE $1GNATURE DATE DEPARTMENT HEAD -[ . 2/02/37 h*W h/W YW Z)h1fff C.o. jfRAA dolm C. UNREVIEVE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
3 (Significant change in procedure method or scope as described in FSAR) YES[2 NO [ ] ]I (If yes, document in DORC/50RC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact) YES [ ] NO [d (If yes, docurcent in PORC/50RC meeting minutes)
D. PROCEDURE REQUIRFS PORC/$0RC REVIEW YES ['f NO [ ]
E. PORC/SORC APPROVAL PORC/SORC Heeting Number /"8['((
F. APPROVAL AND IMPLEMENTATION The atI. ached procedure is hereby approved, and effective on the date below:
NA 7.~ G sh J ,2o -fj*
Station /ServiceWnit Superintendent Effective Date SF-301 Rev. 6 0010250446 001007 13 DR ADGCK 050
s RPV L3 vel Restoration E0P 576 Page 1 Rev. 1
,~., Unit I l' v')
RPV Level Restorhtion Emergency Procedure PAGE NO. EFF. REV.
1-6 1 STEP 5 06JECTIVE5 Enter from CQP
$70 if RPV water level cannot be maintained
> TAF or E0P 577 Upon Deoressurtration b
l Initiate'IC l Release cold leg watar inventory b
t taonsn Injection Lineup Prepare for level restoration d
Monitor RPV tevel/ Pressure Diagnose plant conditions u
late Action Based Upon Parameter Trends and Systee Availability
- GO TC E0P 570 "RPV Level Control"
- GO TO E0P 573 "RP" spray Cooling"
- Go 70 E0P $74 'RPV Steam Cooling"
References:
- 1) Emergency Procedure Guidelines, Millstone Unit One
- 2) Emergency Procedure Guidelines, Appendix 8 ,
- 3) Emergency Procedure Guidelines, Appendix C
- 4) ACP-QA-3.02, Attachment A ECP 576 RPV Level Restoration
i' I
RPV Level Restoration E0P 576 Page 2 Rev. 1
. i r
I
- 1. PURPOSE
(%v) ;
The purpose of this procedure is to restore RPV water level to above i top of active fuel.
l l
- 2. ENTRY CONDITIONS 2.1 This procedure is entered from E0P 570 "RPV Level Control" step 3.2 when RPV water level cannot be maintained above the top of the active fuel (TAF = -127),. or E0P 577 upon depressurization. l
- 3. OPERATOR ACTIONS While executing the following steps: !
E Boron injection is required.
THEN GO TO E0P 575 "RPV Level /Rx Pcwer Control" E RPV water level cannot be determined, RPV Flooding is required, THEN GO TO E0P 578 "RPV Floodir.g".
E RPV Flooding is required for other reasons, LHM GO TO E0P 578 "RPV Flooding".
3.1 Initiate Isolation Candenser 3.2 Line-up for injection and start pumps in two or more of the following normal injection subsystems:
3.2.1 Condensate /Feedwater 3.2.2 LPCI A 3.2.3 LPCI B 3.2.4 Core Spray A 3.2.5 Core Spray B E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 2a
- Rev. 1 .
)
) l
- 1. C04171045 REQUIRING RPV Floo0!NC A. RPY Level control (EOP $70)
- 1. RPY water level cannot be deteraleed.
B. Centatteent Control (E0P 540)
I
- 1. Drywell temperature reaches the RPY Saturation Te'perature.
e
- 2. Suppression Chamber pressure cannot be saintained below the Primary Containment Design Pressure.
C. RPV Level Restoration (EOP $76)
- 1. RPV water ieval cannot be determined.
4
- 0. RPV Level /h Power (EOP 575)
- 1. RPV water level cannot be determined, and h Power cannot be determined or maintained above 85.
II. 8090N INJECT!04 IEQUIREMENTS 6
A. h Power Control (EOP 572)
- 1. If the h is not shut down and Suppression Pool Temperature reaches 110*F.
l E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 3
. Rev. 1 O
sj NOTE Completion of step 3.3 is not necessary for execution of step i 3.4. i 1
3.3 E at least two normal injection subsystems (step 3.2) can not be lined up, line-up as many of the following alternate injection subsystems as possible, BUT 00 NOT INJECT 3.3.1 SLC Test Tank OP 304".
3.3.2 M/U Water to SLC System "0P 304".
3.3.3 Boron Tank to SLC System "0P 304".
3.3.4 CRD Pump Test Line "0P 302".
3.3.5 CST to LPCl/CS "0P 335".
3.3.6 Fire System "0P 332A".
3.3.7 ESW to ECCS X-Tie "00 335" 3.4 Monitor RPV pressure and water level. Continue in this procedure at the step indicated in the following table.
RPV Pressure Region High* (> 33n psig) LO(< 330 psig)
$ '$ RISING ~
3.5 3.6
?%*
m :n 3 LOWERING 3.7 3.8 l
- RPV pressure at which Core Spray Pump shut-off-head is reached.
EOF 576 RPV t.evel Restoration
l RPJ Level Restoration E0P 576 Page 4 Rev. 1 b')' While executing the following steps:
E the RPV water level trend reverses or RPV pressure changes region, THEN GO T0 step 3.4 of this procedure.
E RPV water level drops to -48" THEN prevent automatic RPV depressurization by depressing the APR Timer Reset pushbutton and CONTINUE to reset every minute UNTIL,
- RPV water level is o -48", @
Drywell pressure is < 2 psig and the "High Drywell Pressure Reset" key is in the resat position, OR All Core Spray and LPCI pumps are not running, AND the "APR Auto-Blowdown A/C Interlock" alarm is clear.
3.5 RPV level rising end RPV pressure > 330 psig.
3.5.1 IF RPV water level is > -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.2 IF RPV water level is < -127" AND Undensate/Feedwater is available, THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.3 IF RPV water level is < -127" AND E ndensate/Feedwater is not available, THEN GO TO E0P 577 "Emergency RPV Depressurization".
- 3. 6 RPV level rising and RPV pressure < 330 psig.
3.6.1 E RPV pressure is rising, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.6.2 E RPV pressure is M rising, WHEN RPV water level reaches -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3.
E0P 576 RPV Level aestoration
RPV Level Restoration E0P 576 Page 4a Rev.1 ,
ICC5 AUTO-lm!TIATION ) i I
j APR - Drywell Hi Pressure (2 psig) M RPV Low Low Water Level ( 44") M AC !.'.terlock (1 C5 or 1 LPCI) M 120 Sec finer (Timed out)
Core Spray
- Orywell Hi Pressure (2 pelg) M
- RPV Low-Low we'.or Level ,(+44") WITH 68 APV Pressure '.aw (00-350 psig) $
I LPCI
- Drywell Hi Pressure (2 psig) M a RPV Low-Low Water Level (-44") WITH RPV Pressure Low (300-350 psil)
)
l l
E0P $76 RPV l.evel Restoration
r>
RPV Level Restoration E0P 576 Page 5 Rev. 1 -
(D 3.7 RPV level lowering and RPV pressure > 330 psig.
V 3.7.1 H, Condensate /Feedwater is not operating, THEN attempt to start Condensate /Feedwater.
3.7.2 LF, CRD is not operating, THEN attempt to start CRD 3.7.3 E CRD is not operating, AND IF at least two normal injection subsystems are IIned-up for injection with pumps running, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.7.4 E CR0 is rot operating, AND IF no normal injection subsystem.is lined-up Tor injection with at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure).
~
NOTE For Hydrogen / oxygen control following a LOCA, refer to section 7.6 of OP 311.
3.7.5 WHEN RPV level approaches -127" (TAF),
E any system, or normal injection subsystem, or a? ternate injection subsystem is lined-up with at least one pump running.
THEN GO TO E0P 577 "Emergency RPV Depressurization".
IF no system, or normal injection su'> system, or aTternate injection subsystem is liaed-up with at least one pump running, THEN GO TO E0P 574 "RPV Steam Cooling".
E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 6
- Rev. 1 0 3.8 RPV water level lowering and RPV pressure < 330 psig. ;
3.8.1 IF no normal injection system is lined-up for injection Eth at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure).
3.8.2 g RPV pressure is rising, THEN GO TO E0P 577 "Eu egency RPV Depressurizatior".
WHEN RPV water level drops to -127" (TAF),
THEN GO TO E0P 573 "RPV Spray Coeling".
WRM: dip O
FINAL 0
"CP ~;75 iPV *.evel iustoration
,