IR 05000346/1988027

From kanterella
Revision as of 16:29, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Enforcement Conference Re Violations Noted in Insp Rept 50-346/88-27 Scheduled for 880926 in Region III
ML20154N190
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/20/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
References
EA-88-234, NUDOCS 8809290217
Download: ML20154N190 (2)


Text

- -- - - . . .. -

%

a si UNITED ST ATES

+ '*,, NUCLE AR REGUL.ATORY COMMISSION

$') ~$ MGION til t

-l 799 moostvtLT mo AD cLEN ELLvN iLuNois som

, f

.....

'

SEP 2: 1988 Docket No. 50-346 EA 88-234

[

Toledo Edison Company ATTN: Mr. Donald Shelton Vice President Nuclear Edison Plaza ,

300 Madison Avenue l Toledo, OH 43652  !

!

Subject: ENFORCEMENT CONFERENCE l

Gentlemen: f I

During the period May 4th through September 2nd,1988, the NRC conducted l'

inspections at the Davis-Besse Nuclear Power Plant, Unit 1, to review an allegation concerring employment discrimination against a Quality Control .

Inspector for raising safety concerns. The results of these inspections are '

described in regional inspection report 50-346/88027 sent to you on September 12, 1988. The report also describes a potential violation of l 10 CFR 5 I The NRC is considering this violation for potential escalated enforcement action and has scheduled an enforcement conference with you for 10:00 ,

(CDT) September 26, 1988 in Region III. At the enforcement conference, you i should be prepared to discuss (1) the safety significance of the potential  :

violation,(2)thespecificandunderlyingcause(s)ofthepotential  !

violation, and (3) the actions taken or planned to correct the potential violation. We request that at the enforcement conference you provide a handout that succinctly describes your position concerning these enforcement consideration

Sincerely, 7 b3hL%

? Edward G. Gre b an, Dire M _

r

!

Division of Reactor Projects cc: L. Storz Plant Manager I tDCD/DCS(RIDS) I

'

Licensing Fee Management Branch Resident Inspector, RI!!  !

Harold W. Kohn, Ohio EPA J James W. Harris, State of Ohio  ;

Robert M. Quillin, Ohio Department of Health s State of Ohio, Public , Qh ,

Utilities Com.ission i 8809290217 eso92o ij l l PDR ADOCK 05000346 l 0 PDC J

_- . .- . _- ~ _ _ . - - ._ - _.

,'

,w i e

uNetto states  !

/" .a ar4%'\

, ,

NUCLE AR REGULATORY COMMisslON f f 3 s REGION Hi l

5* #

tu noosts Lv nono ,

  • ~ ottN ELLvu, stuNois sont

, ISEP 2 01988  !

NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Toledo Edison Company Name of Facility: Davis Besse Nuclear Power Station Docket No.: 50-346 Date and Time of Meeting: September 06,1988,at10:00a.m.(CDT)

,

'

Location of Meeting: U. S. Nuclear Regulatory Comission Region !!!  !

799 Roosevelt Road  ;

Glen Ellyn, IL 60137 l

!

Purpose of Meeting: An enforcement conference to discuss a potential t violation of the requirements of 10 CFR 5 concerning employment discrimination resulting from a Davis-Eesse employee raising scfety issue I RI!! Attendees *  !

A. Bert Davis, Regional Administrator  ;

E. G. Greenman, Director, Division of Reactor Projects t Others as designated by Region !!! [

t Licensee Attendees: i D. Shelton, Vice President Nuclear l L. Storz, Plant Manager (

Others as designated by the licensee i Distribution:

J. M. Taylor, Deputy Executive Director for Regional Operations T. W. Murley, Director Office of Nuclear Reactor Regulation i E. L. Jordan, Director for Analysis and Evaluation of Operational Data J. G. Partlow, Director, Division of Reactor Inspection and Safeguards -

J. Citfford, R!ll Coordinator, EDO l J. Hannon, Director, Project Directorate 111-3, NRR i A. DeAgazio, Licensing Project Manager, NRR j

!

l l

l

'