ML20217F837
| ML20217F837 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/08/1999 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Campbell G CENTERIOR ENERGY |
| Shared Package | |
| ML20217F841 | List: |
| References | |
| 50-346-99-10, NUDOCS 9910210091 | |
| Download: ML20217F837 (3) | |
See also: IR 05000346/1999010
Text
a rg'o. .
. UNITED STATES
a
1.
'
,,
NUCLEAR REGULATORY COMM'SSION
,
'
8
o
- REGION ill
,
' 801 WARRENVILLE ROAD
.I
j--
l S,,
LISLE, ILLINOIS 60532 4351
-
4*..+
'
Odober 8,1999
.[
'
I
,
1
~
Mr. Guy G. Campbell
l
Vice President - Nuclear
l
FirstEnergy Nuclear Operating Company .
)
Davis-Besse Nuclear Power Station
5501 North State Route 2
Oak Harbor, OH -43449-9760
s
SUBJECT:
DAVIS-BESSE INSPECTION REPORT 50-346/99010(DRP)
Dear'Mr. Campbell:
On Se' tember 13,1999, the NRC completed an inspection at your Davis-Besse site. The
I
p
enclosed report presents the results of that inspection.
j
.
Overall, your facility was operated in a conservative and conscientious manner. However, the
inspectors identified that important-to-safety doors within the facility have been either left open
- or blocked open for convenience on a number of occasions over the past several months. It
. appears not there is a generallack of sensitivity amongst your staff to the importance of these
.' doors.'
)
I
'
1 Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. This violation was reported to the NRC in a licensee event report and
concerned the failure of your staff to conduct a timely engineering evaluation following
excessive cooldown of the pressurizer during the shutdown for the recent maintenance outage
at the station. This violation is being treated as a Non-Cited Violation, consistent with
Appendix C of the Enforcement Policy. This Non-Cited Violation is described in the subject
inspection report. If you contest the violation or the severity level of this Non-Cited Violation,
you should provide a response within 30 days of the date of this inspection report, with the
. basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region Ill, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
,
DC 20555-0001.
.
!
1
{
t
9
.-
9910210091'991000
t-
ADOCK 05000346
1
(
G'
4
I
l
,
'b.
.
. G. Campbell =
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
/o/ T. Kozak
Thomas J. Kozak, Chief
Reactor Projects Branch 4
Docket No. 50-346 -
License No. NPF-3
Enclosure:
Inspection Report 50-346/99010(DRP)
cc w!enet:
~ J. Stetz, Senior Vice President - Nuclear
'
J. Lash, Plant Manager
J. Freels, Manager, Regulatory Affairs
M. O'Reilly, FirstEnergy
State Liaison Officer, State of Ohio
R. Owen, Ohio Department of Health
C. Glazer, Chairman, Ohio Public
Utilities Commission
DOCUMENT NAME: G:\\DAVl\\DAV99010 DRP. WPD
T.
.
.nm.
- -
wc.co.im
wec.co
wic.
..
OFFICE'
Rlli
k
Kozak:dp#b
NAME-
j
DATE
10$/99
OFFICIAL RECORD COPY
1
!
I
r
,
e,
.-
T
'G. Campbell
' 3-
-
' Distribution:
,
RPC (E-Mail)
-
SNB (Project Mgr.) (E-mail)
- J. Caldwell, Rill w/enci
B. Clayton, Rlll w/enci
SRI Davis-Besse w/enci
' DRP w/enci
.DRS w/enci
Rlli PRR w/enci:-
PUBLIC IE-01 w/enci
Docket File w/enci -
. GREENS
1
^ IEO (E-Mail) -
. DOCDESK (E-Mail)
.
i
}
,-
(
'
l
,
I
i