IR 05000346/1988027

From kanterella
Jump to navigation Jump to search
Advises That Enforcement Conference Re Violations Noted in Insp Rept 50-346/88-27 Scheduled for 880926 in Region III
ML20154N190
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/20/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
References
EA-88-234, NUDOCS 8809290217
Download: ML20154N190 (2)


Text

-

--

-

-..

..

-

%

a sif.

UNITED ST ATES

'*,,

NUCLE AR REGUL.ATORY COMMISSION

+

$')

~$

MGION til t

- l 799 moostvtLT mo AD

f cLEN ELLvN iLuNois som

,

.....

'

SEP 2: 1988 Docket No. 50-346 EA 88-234

[

Toledo Edison Company ATTN: Mr. Donald Shelton Vice President Nuclear Edison Plaza

,

300 Madison Avenue l

Toledo, OH 43652

!

!

Subject:

ENFORCEMENT CONFERENCE l

f Gentlemen:

I During the period May 4th through September 2nd,1988, the NRC conducted l

inspections at the Davis-Besse Nuclear Power Plant, Unit 1, to review an

'

allegation concerring employment discrimination against a Quality Control

.

Inspector for raising safety concerns. The results of these inspections are

'

described in regional inspection report 50-346/88027 sent to you on September 12, 1988. The report also describes a potential violation of l

10 CFR 50.7.

I The NRC is considering this violation for potential escalated enforcement action and has scheduled an enforcement conference with you for 10:00 a.m.

,

(CDT) September 26, 1988 in Region III. At the enforcement conference, you i

should be prepared to discuss (1) the safety significance of the potential

violation,(2)thespecificandunderlyingcause(s)ofthepotential

!

violation, and (3) the actions taken or planned to correct the potential violation. We request that at the enforcement conference you provide a handout that succinctly describes your position concerning these enforcement considerations.

Sincerely, b3hL%

? Edward G. Gre b an, M _

Dire r

Division of Reactor Projects cc:

L. Storz Plant Manager I

tDCD/DCS(RIDS)

I

'

Licensing Fee Management Branch Resident Inspector, RI!!

Harold W. Kohn, Ohio EPA J

James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health s

State of Ohio, Public Qh

,

,

Utilities Com.ission i

8809290217 eso92o ij l PDR ADOCK 05000346

PDC J

_-

.

.-

. _- ~ _ _.

-

-

._

-

_.

,'

i

,w e

uNetto states

!

/".a ar4%'\\

f NUCLE AR REGULATORY COMMisslON

,

,

f

s REGION Hi l

5*

tu noosts Lv nono

,

ottN ELLvu, stuNois sont

~

ISEP 2 01988

,

NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Toledo Edison Company Name of Facility:

Davis Besse Nuclear Power Station Docket No.:

50-346 Date and Time of Meeting:

September 06,1988,at10:00a.m.(CDT)

,

'

Location of Meeting:

U. S. Nuclear Regulatory Comission Region !!!

!

799 Roosevelt Road

Glen Ellyn, IL 60137 l

!

Purpose of Meeting:

An enforcement conference to discuss a potential t

violation of the requirements of 10 CFR 50.7 concerning employment discrimination resulting from I

a Davis-Eesse employee raising scfety issues.

RI!! Attendees *

!

A. Bert Davis, Regional Administrator

E. G. Greenman, Director, Division of Reactor Projects t

Others as designated by Region !!!

[

t Licensee Attendees:

i D. Shelton, Vice President Nuclear l

L. Storz, Plant Manager (

Others as designated by the licensee i

Distribution:

J. M. Taylor, Deputy Executive Director for Regional Operations T. W. Murley, Director Office of Nuclear Reactor Regulation i

E. L. Jordan, Director for Analysis and Evaluation of Operational Data J. G. Partlow, Director, Division of Reactor Inspection and Safeguards

-

J. Citfford, R!ll Coordinator, EDO J. Hannon, Director, Project Directorate 111-3, NRR i

A. DeAgazio, Licensing Project Manager, NRR j

!

l l

l

'

- -

- - - - - - -

. - - - - -

- -