June 29, 1990 g:ps ys
?v f 3;,;y
/ Docket No. 50-346i DISTRIBUTION i,
KBRETTY1F
-NRC & Local PDRs l
PDIII-3 Reading JZwolinski J
y JHannon PKreutzer W
4 TWambach-OGC
'Mr; Donald C. Shelton E. Jordan ACRS (10)
~Vice President - Nuclear Gray File Region !!!,DRP' l
2 x
Toledo Edison; Company Edison Plaza - Stop 712 300 Madison Avenue Toledo, Ohio 43652=
Dear Mr. Shelton:
l lJ 'a l
SUBJECT:
SAFETY AND PERFORMANCE IMPROVEMENT PROGRAM (SPIP)' IMPLEMENTATION AUDIT AT DAVIS-BESSE NUCLEAR POWER' STATION (TACNo.M68201)
As you are: aware, the NRC staff has determined that a series of audits is-necessary to verify the proper implementation of the-Babcock & Wilcox Owners iGroup'(B&WOG) safety and performance improvement program (SPIP) recomendations at each B&W designed facility. The staff's intent to audit the implementation cof this' program was identified in section 12.2 of the staff's SER on the B&WOG Plant Reassessment Program'(NUREG-1231, November 1987). This audit series-teonsists of La SPIP_ programatic' audit (which has been completed already), a Y
SPIP'recomendation implementation audit, and a followup audit,-.if neessary..
- The implementation audit for your facility is planned
- for~ the week of Juiy 16,.
L1990.l The selected sample of Technical Recomendations. (TRs)-is enclosed.-
It is anticip'ated that the audit will comence with an entrance meeting at' c
10:004 a.m.,' July 16 and conclude with an exit meeting at 10:00 a.m.,
_ July-20.
Sincerely, L
L M.D. Lynch for M
l Thomas.V. Wambach, Sr. Project Manager L'
Project Directorate 111-3
-Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation i
t Enclo~sure 'as' stated l3 wwy-pA 1cc::w/ enclosure See.~next page L
DOCUMENT NAME: 68201 SPIP AUDI t
i
' Office:^
LAlgDhll-3 PD/P III-3 Y
Surname:'
PKle\\ltzer hTWambach/lb annon b
Date:-
y /2g /90 oG/29/90 gg/90
)&
lBragm g g (o
ih eoc y
+
J
^, p.:
l u
o l s.2 l
'lIjf}Ypigq g.
ok UNITED $TATES g.
~ NUCLEAR REGULATORY COMMISSION
- p' une 29 9
j
" Docket'No. 50-346
?
1 LMr.. Donald C. Shelton l
.Vice President - Nuclear Toledo Edison Company Edison Plaza - Stop 712 l
--300 Madison Avenue Toledo, Ohio 43652 1
Dear Mr. Shelton:
SUBJECT:
SAFETY AND PERFORMANCE IMPROVEMENT PROGRAM (SPIP) IMPLEMENTATION 4
AUDIT AT DAVIS-BESSE NUCLEAR POWER STATION.(TAC No. M68201) s
'As you are aware, the NRC staff has determined that a series of audits is.
necessary to verify;the proper-implementation of the Babcock & Wilcox Owners Group (B&WOG) safety.and performance improvement program (SPIP) recommendations l<'o at each B&W designed facility. The staff's intent to audit the implementation of this program was identified =in section 12.2.of'the staff's SER on the B&WOG PlantReassessmentProgram(NUREG-1231 November 1987).. This audit series w
- consistsofaSPIPprogrammatic' audit [whichhasbeencompletedalready),a-L'
' SPIP recomendation imp,lementation audit, and a followup audit, if necessary.
4'
-The implementation audit for your facility is planned for the week of July 16, 1990.' The-selected sample of Technical Recommendation's (TRs)'is enclosed, it is anticipated that the audit will commence with an-entrance meeting at H
10:00 a.m., July 16, and conclude with an exit meeting,at 10:00 a.m.,
July 20.
~
Sincerely, f
W~
?
H
[ Thomas V. Wambach, Sr. Project Manager H
Project Directorate 111-3 d
O Division of Reactor Projects - III, IV, Y and Special Projects g]m Office of Nuclear Reactor P,egulation l Enclosure as stated H
?
cc::w/ enclosure B
.See next page-
~
l l-l
'j.
'r J-
+
1 f
j
- 's
. DAVIS BESSE NUCLEAR POWER STATION BWOG SPIP IMPLEMENTATION Selected BWOG SPIP Technical Recommendations (TRs) - (15 total)
F:
TRs requiring follow up action based on progranaatic audit findings K: _
TRs designated." Key" P:
TRs requiring procedure changes or plant modifications 0:
TRs of importance based on plant operating experiences R:
TRs rejected TR-008-ICS Make improvements to reactor runback capabilities. (K,P)
TR-038-ICS Develop and implement a preventative maintenance program for the ICS/NNI. (K,P)
TR 066-MFW -Ensure that a single electrical failure will not cause a loss of both feedwater trains.
(F,K)
TR 070-MFW Provide the capability to override a close signal to the MFW block valve.
(K,R)**
TR-071-MFW Install valve position indication for startup and MFW regulating valves.
(P)
TR-099-0PS Include guidance on excessive MFW, throttling AFW and throttling HPI in plant procedures.
(K,P,0)
TR 119-PES Implement preventative maintenance for electrical buses. (K,P)
..TR-122-I AS Instrument air system should be systematically inspected for leaks.
(F)
TR-149-IAS Instrument air-system components 'should be designed to withstand maximum: flow generated by all air compressors. (0)
TR-155-EFW Limit the maximum flow rate delivered by the EFW system. (K)
TR-159-0PS. Evaluate secondary system controls to achieve remote manual control in the Main Control Room of all post-trip steam flow paths, MFW and EFW, (K,P,0) t~
TR-174-MSS Improve response of the modulating turbine bypass valves. (see TR-048-MSS)
(F)
TR-180-MTS Provide a monitoring capability for the EHC system for root cause determination. (P)
TR-190-ICS Develop backup controls for pressurizer level and pressure control.
(F,K,P)-
TR-219-0PS Include plant response for a turbine trip and runback below 451 in the operator training program.
(0)
- The Toledo Edison basis for rejecting TR-070-MFW will be reviewed in the implementation audit during the week of July 16, 1990.
a-
?
,g.
+
'k 4
=
, e -.
'J~Mr. Donald C. Shelton Davis-Besse Nuclear Power Station-
., - Toledo Edison Company Unit No.il cc: '
David.E; Burke. Esq..
-The Cleveland Electric:
Radiological Health Program
.111uminating_ Company-Ohio Department of Health P. 0.. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 43212 1
- Mr. Robert W..Schreuder Attorney' General Manager, Nuclear Lica sing Department of. Attorney
--Toledo Edison Company General Edison Plaza 30 East Broad Street
- 300 Madison Avenue Columbus, Ohio - 43215 Toledo,'.0hio 43652 Mr. James W. Harris, Director
. Gerald Charnoff LEsq.
(AddresseeOnly)
- Shaw.Pittman, Potts Division of Power Generation and Trowbridge Ohio Department of Industrial Relations 2323 West 5th Avenue 2300 N Street N.W.
Washington, D.C. 20037 P. 0.. Box 825 Columbus, Ohio 43216 Regional Administrator, Region 111
.U.S. Nuclear Regulatory Comission Ohio Environmental Protection Agency 799 Roosevelt Road DERR--Compliance Unit Glen Ellyn',.1111nois 60137.
P0 Box 1049 1800 Watermark Drive
-Mr. Robert B. Borsum-ATTN: Zack A. -Clayton
. Babcock & Wilcox-Columbus, Ohio 43266-0149
' Nuclear Power Generation Division Suite 525, 1700 Rockville Pike President, Board of fRockville -MD: 20852 County Comissioners of Ottawa County Resid5ntinspector Port Clinton, Ohio 43452 c
' U. S.: Nuclear Regulatory Comission 5503 N. State Route 2 Oak Harbor, Ohio 4'. ' 4 9 State of Ohio Public Utilities Comission'
.180 East Broad Street Columbus, Ohio 43266-0573 7 j
.,1
.-