Forwards Insp Rept 50-346/98-17 on 980918-1109 & NOV Re Inadequate Maint Work Order Used by Electrician During Removal of Primary Water Storage Tank Temp Indicator
ML20198B539
Person / Time
Site: Davis Besse, 03000346
Issue date: 12/09/1998
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20198B542 List:
References
50-346-98-17, NUDOCS 9812210006
Download: ML20198B539 (4)


See also: IR 05000346/1998017

Text

. -._ . ~ _ . _ _ . _ - - _ . . . _ _ _ - . - - . - - . - .~. - . - . - . - - . - _ - . .

_

A444- UNITED STATES '

NUCLEAR REGULATORY COMMISSION

l _' [ o REGION lil

j g -y 801 WARRENVILLE ROAD

t t USLE, ILLINOIS 60532-4351

l

\...../ December 9,1998

l

Mr. John'K. Wood .

Vice President - Nuclear

l

Davis-Besse Nuclear Power Station

L _ Centerior Service Company .

l 5501 North State Route 2

- Oak Harbor, OH 43449

SUBJECT: DAVIS-BESSE INSPECTION REPORT 50-346/98017(DRP) AND

NOTICE OF VIOLATION

Dear Mr. Wood:

i

On November 9,1998, the NRC completed an inspection at the Davis-Besse reactor facility.

During that inspection, plant operators were challenged by several events which led to manual -

reactor trips from approximately full power on September 24 and October 14, an automatic

,

reactor trip from 4 percent power on October 18, and a plant runbcck from 100 percent to

i- 60 percent power on October 21. The circumstances surrounding the October 14 manual

L reactor trip were described in Inspection Report 50-346/98019._ The circumstances surrounding 'i

the other events are described in the enclosed repoit l

'

I

I  ; Operators responded promptly and effectively to the events to ensure the plant was in a stable

' condition following each event. While each of these events were reviewed and individual causes

were identified and addressed, it is of concern that the processes in place were not effective in

- preventing these events from occurring. It is our understanding that a collective significance

i review has been initiated to assess the various events that have occurred over the past several

'

months and to develop actions to improve overall performance at the facility. A management

meeting to discuss the initial results of the review has been scheduled for December 16,1998,

at the NRC Region lli Office in Lisle, Illinoisc ,

One' violation of NRC requirements was identified during this inspection conceming an

. inadequate maintenance work order (MWO) which was used by an electrician during the

, removal of a primary water storage tank temperature indicator. The MWO contained incorrect

'~

instructions concerning a fuse removal from an instrumentation panel and, when the work was

performed, the plant runback mentioned above occurred.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

= surrounding it are described in detail in the enclosed report. The NRC has concluded that

information regarding the reason for the violation, and the corrective actions taken and planned

.

to correct the violation and prevent recurrence, are already adequately addressed in the

enclosed report. Therefore, you are not required to respond to this letter unless the description

,

therein does'not accurately reflect your correct lve actions or your position, in that case, or if you

choose to provide additional information, you should follow the instructions specified in the

enclosed Notice.- 'i

o

a

9812210006 981209

PDR ADOCK 05000346

L e PDR

l

l

. uu a_, , _. _ . ~ . , _

-. . . . -. . . _. - -. . - _ _ - . - . , . _ . ... .-

,

' J. Wood -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the

enclosures, and your response, if any, will be placed in the NRC Public Document Room.

Sincerely,

(b.>

ThoQas . Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-346

License No.: NPF-3  ;

Enclosures: 1. Notice of Violation j

2. Inspection Report ,

50-346/98017(DRP) ]

l

cc w/encls: J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

i

. . _ _ _ ___ _ _._ ._ _ _.__ _ _ . _ __

,

J. Wood -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the

enclosures, and your response, if any, will be placed in the NRC Public Document Room.

Sincerely,

/s/ T. J. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-346

License No.: NPF-3

Enclosures: 1. Notice of Violation

2. Inspection Report ,

50-346/98017(DRP)

cc w/encis: J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

DOCUMENT NAME: G:\DAVi\DAV98017.DRP

To receive a copy of thle document, Indicate in the box 'C's Copy without attacNencl *E's Copy with attachtenci *N" a No copy

OFFICE Rill Rlli D

NAME DuPontM Kozak Y

DATE n/9 / fr 17J 9 / D

OFFICIAL RECORD COPY

-.. .

J. Wood -3-

$

Distribution:

RPC. (E-Mail) -

Project Mgr., NRR w/encls

J. Caldwell, Rill w/encls

C. Pederson, Rill w/encls

B. Clayton, Rlli w/encls

SRI Davis-Besse w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rlli PRR w/encls

~PUBLIC lE-01 w/encls

Docket File w/encls

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

\

l