Forwards Safety Insp Rept 50-346/90-17 on 900827-31.No Violations Noted
ML20059J251
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/13/1990
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20059J253 List:
References
GL-85-06, GL-85-6, NUDOCS 9009190234
Download: ML20059J251 (2)


See also: IR 05000346/1990017

Text

. ... .

,.

' .

SEP 131990

.

' Docket No. 50 346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Centlemen:

This refers to the special safety inspection conducted by Mr. Rolf A. Westberg '

.

of this office on August 27 through 31, 1990, of activities regarding the

implementation of Generic Letter 85 06 relative to ATWS mitigating systems at

the Davis Besse Nuclear Power Station autherized by NRC Operating License No.

NPF-3 and to the discussion of our findings with Mr. Robert W. Schrauder at

the conclusion of the inspection. ,

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective-

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed'in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

Originni Eigned by Mark A. Ring

.

M. A. Ring Chief

Engineering Branch

Enclosure: anspection

Report No. 50-346/90017(DRS)

See Attached Distribution

ef>

RIII RIII RIII RIII

GLNAs gW -

Wes tberg/j k Gardner fc Ring

9/12/90 9/\S /90 g//390 9/f?/90

9009190234 90o913

PINR g

O ADOCK 05000346 -

PDC

\.

. . , . -. . .--. . . . . .

f.

..

,

.

.

Toledo Edison Company 2

SEP 13 590

Distribution

cc w/enclosura:

L. Stors, Plant Manager

DCD/DCB (RIDS)  ;

OC/LFDCB

Resident Inspector, RIII

James W. Harris, State of Ohio

Robert E. Owen, Ohio

Department of Health'

A. Grandjean,_ State of Ohio,

Public Utilities Commission

-

j

u