|
---|
Category:Inspection Plan
MONTHYEARIR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20220062023-03-0101 March 2023 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2022006) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 IR 05000346/20220052022-08-25025 August 2022 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2022005) ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22202A0522022-07-25025 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22130A1802022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000346/20210062022-03-0202 March 2022 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2021006) ML22034A6772022-02-0303 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000346/2022002 IR 05000346/20210052021-09-0101 September 2021 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2021005) ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21083A1082021-03-24024 March 2021 Staton, Unit 1 - Information Request to Support Upcoming Temporary Inspection 2515/194 Inspection; Inspection Report 05000346/2021012 IR 05000346/20200062021-03-0404 March 2021 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2020006) IR 05000346/20210402021-01-14014 January 2021 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perfom Inspection 05000346/202140 ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20272A2692020-09-28028 September 2020 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiment) Baseline Inspection IR 05000346/20200052020-09-0101 September 2020 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2020005) IR 05000346/20190062020-03-0303 March 2020 Annual Assessment Letter for Davis-Besse (Report 05000346/2019006) IR 05000346/20190052019-08-28028 August 2019 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2019005) ML19190A1372019-07-0808 July 2019 Ltr. 07/08/19 Davis-Besse Nuclear Power Station, Unit 1 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program; Inspection Report 05000346/2019012 (DRS-N.F ML19095B7262019-04-0505 April 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20180062019-03-0404 March 2019 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2018006 ML19043A8012019-02-12012 February 2019 Ltr. 02/12/19 Davis-Besse Nuclear Power Station, Unit 1 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2019011 (DRS-J.Robbins) ML18264A2832018-09-0606 September 2018 Inspection Plan for Davis-Besse Nuclear Power Station for Inspection Report 05000346/2018011 (DRS-D.Betancourt-Roldan) IR 05000346/20180052018-08-28028 August 2018 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2018005) IR 05000346/20170062018-03-0202 March 2018 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2017006) ML18033A5452018-02-0101 February 2018 Notification of NRC Baseline Inspection and Request for Information (DRS-E.Fernandez) IR 05000346/20170052017-08-28028 August 2017 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2017005) IR 05000346/20160062017-03-0101 March 2017 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2016006) ML17019A3222017-01-19019 January 2017 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000346/2017001 ML16350A1742016-12-14014 December 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Davis-Besse Nuclear Power Station IR 05000346/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2016005) ML16125A5032016-05-0303 May 2016 Ltr. 05/03/16 Davis-Besse Nuclear Power Station - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) IR 05000346/20150062016-03-0202 March 2016 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Inspection Report 05000346/2015006) ML15355A1962015-12-18018 December 2015 IR 05000346/2016007, March 28, 2016, Davis-Besse; Request for Information for an NRC Post-Approval Site Inspection for License Renewal IR 05000346/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2015005) L-15-186, Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 572015-06-0505 June 2015 Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 57 IR 05000346/20140012015-03-0404 March 2015 Annual Assessment Letter for Davis-Besse Nuclear Power Station, (Report 05000346/2014001) ML15030A2522015-01-28028 January 2015 Scheduling of Initial OL Exam ML14245A1062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station IR 05000346/20130012014-03-0404 March 2014 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2013001) ML13347B1302013-12-12012 December 2013 is Request for Information ML13246A2072013-09-0303 September 2013 2013 Davis Besse MOC Letter Combined IR 05000346/20120012013-03-0404 March 2013 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2012001) ML12318A1592012-11-13013 November 2012 Ltr. 11/13/12 Davis-Besse Cyber Ti 22011 004 Request for Information ML12248A3432012-09-0404 September 2012 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station IR 05000346/20110072012-03-0505 March 2012 Annual Assessment Letter for Davis-Besse Nuclear Power Station Unit 1 (05000346/2011007) 2023-08-24
[Table view] Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
rch 4, 2002
SUBJECT:
ANNUAL ASSESSMENT LETTER - DAVIS-BESSE NUCLEAR POWER STATION (REPORT 50-346/2002-01)
Dear Mr. Bergendahl:
On January 31, 2002, the NRC staff completed its end-of-cycle plant performance assessment of the Davis-Besse Nuclear Power Station. The end-of-cycle review for Davis-Besse involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from April 1, 2001, to December 31, 2001.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities. On April 3, 2002, we plan to discuss this assessment with you and your staff in a meeting at the Davis-Besse Administration Building. This meeting will be open for public observation.
As discussed in our previous annual assessment letter dated May 31, 2001, this inspection and assessment cycle consisted of three quarters (i.e., the second, third, and fourth quarters of calendar year 2001) instead of the usual four quarters. This change was implemented in order to align the inspection and assessment cycle with the calendar year beginning on January 1, 2002.
Overall, Davis-Besse operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as the first two quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2003. Also, along with routine outage-related inspections, we will conduct an inspection associated with Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles." The enclosed inspection plan details the inspections scheduled through March 31, 2003. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The last 6 months of the inspection plan are tentative and may be revised at the Mid-Cycle Review meeting.
In addition to the baseline inspection program, the NRC issued safeguards advisories recommending that nuclear power plant licensees go to the highest level of security immediately following the terrorist attacks on the World Trade Center and the Pentagon, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants, including the Davis-Besse Nuclear Power Station, remain at a high level of security. On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. These additional compensatory requirements will provide the NRC with reasonable assurance that public health and safety and the common defense and security continue to be adequately protected in the current generalized high-level threat environment. These requirements will remain in effect pending notification from the Commission that a significant change in the threat environment occurs, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs. To date, we have monitored Davis-Besse Nuclear Power Station actions in response to the terrorist attacks through a series of audits. With the issuance of the Order, we will evaluate Davis-Besse Nuclear Power Station's compliance with these interim requirements.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Christine A. Lipa, Chief Projects Branch 4 Division of Reactor Projects, Region III Docket No. 50-346 License No. NPF-3 Enclosure: Davis-Besse Inspection/Activity Plan cc w/encl: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio ADAMS Distribution:
AJM DFT H. Nieh, OEDO T. Boyce, NRR Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 BAH3
DOCUMENT NAME: G:\EOC Ltrs\2002\Dav-eoc02.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME Collins:co CLipa DATE 03/ /02 02/ /02 OFFICIAL RECORD COPY
Page 1 of 2 Davis-Besse 03/08/2002 06:49:11 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISI - INSERVICE INSPECTION & TI-145 1 1 IP 2515/145 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01) 02/20/2002 03/15/2002 Safety Issues 1 IP 7111108 Inservice Inspection Activities 02/20/2002 03/15/2002 Baseline Inspections FY 2002 - DAVIS-BESSE INIT EXAM 03/2002 2 1 W90052 OL - INITIAL EXAM - DAVIS-BESSE - FEB/MAR 2002 03/04/2002 03/08/2002 Not Applicable IP 71121 - ALARA OUTAGE RP INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/04/2002 03/15/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/04/2002 03/15/2002 Baseline Inspections SI - REACTOR VESSEL HEAD SPECIAL INPSECTION 1 1 IP 93812 Special Inspection 03/08/2002 05/24/2002 Event Response Inspection BIP - ROUTINE RESIDENT INSPECTION 2 1 IP 7111106 Flood Protection Measures 04/01/2002 05/11/2002 Baseline Inspections IP 71114 - BASELINE EP ROUTINE INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 04/22/2002 04/26/2002 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/22/2002 04/26/2002 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/22/2002 04/26/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/22/2002 04/26/2002 Baseline Inspections IP 71121 - OCCUPATIONAL RAD SAFETY INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/03/2002 06/07/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 06/03/2002 06/07/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 06/03/2002 06/07/2002 Baseline Inspections 71130 - SAFEGUARDS INSPECTION-AA/AC/PI/PC 1 1 IP 7113001 Access Authorization Program (Behavior Observation Only) 07/22/2002 07/26/2002 Baseline Inspections 1 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 07/22/2002 07/26/2002 Baseline Inspections 1 IP 7113004 Security Plan Changes 07/22/2002 07/26/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/22/2002 07/26/2002 Baseline Inspections IP 71121 - RAD INSTRUMENTATION INSPECTION 1 1 IP 7112103 Radiation Monitoring Instrumentation 09/09/2002 09/13/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/09/2002 09/13/2002 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION 3 1 IP 7111105T Fire Protection 10/07/2002 10/25/2002 Baseline Inspections CONT B - SAFEGUARDS INSPECTION-RESPONSE TEST 2 1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 10/21/2002 10/25/2002 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Davis-Besse 03/08/2002 06:49:11 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type BIP - PROBLEM IDENTIFICATION AND RESOLUTION 3 1 IP 71152B Identification and Resolution of Problems 11/04/2002 11/22/2002 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification 11/11/2002 11/15/2002 Baseline Inspections SSDI - SAFETY SYSTEM BIENNIAL (DRS) 6 1 IP 7111121 Safety System Design and Performance Capability 01/27/2003 02/14/2003 Baseline Inspections IP 71122 - LIQ/GASEOUS EFFLUENTS INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2003 03/14/2003 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/10/2003 03/14/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.