ML20246C456
| ML20246C456 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/17/1989 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML20246C458 | List: |
| References | |
| NUDOCS 8908240391 | |
| Download: ML20246C456 (2) | |
See also: IR 05000346/1989016
Text
y ~.
w-
y,.
-;
<
--
@W
,Y
"
.+
p.. , m
S
.Qtn
(l6.0*
,g,
l
p
, g .y
,
C
.
x
.y
, ,
q ,,
.;
-
'
,i
'
,
t-
' AUG 1. 7 193g --
,
,
,
,
o
. Docket:No. 50-346
l Toledo Edison Company.
ATTN:
Mr.' Donald Shelton-
-
Vice President
>
.
Nuclear
EdisonLPlaza
?300 Madison Avenue
Toledo, OH..43652
.
Gentlemen:
8
.
.
.
.
This refers to the routine safety inspection conducted by Messrs. P. M. Byron,
E.f R.q Schweibinz, R. K. Walton, and D. C. Kosloff of this office on June 5-
through July 16 and 24. -1989,- of activities at Davis-Besse Nuclear Power.
' Station' authorized by Facility Operating License No'. NPF-3 and to the
discussion ~of our. findings with Mr.-L. Storz at the. conclusion of the.
. inspection.
- The enclosed copy'of our inspection report 1 identifies areas examined during-
'
,
sthel inspection. 'Within thesel areas, the inspection consisted ofta selective-
' examination of procedures and representative records, observations,. and
N
. interviews with personnel.
'During'this inspection,-certain of your activities appeared to be.in violation
of-NRC requirements, as.specified in the enclosed Notice.
A written. response-
is. required.
Also other activities appeared to be in violation.of NRC-requirements as-
--described.in Paragraph 7 of the enclosed report. The inspection showed'that
actions had been taken to correct the identified violation and to prevent
recurrence.
Our understanding ~ of your corrective actions is described in
' Paragraph.7 of the enclosed inspection report.
However, this violation was
5
.. identified by you and meets the criteria of 10 CFR 2, . Appendix C,Section V.G
i.--
and therefore, a Notice of Violation will not be issued.
In'accordance with 10 CFR 2.790 of the Commission's regulations, a copy
'
of'this letter and the enclosed inspection report'will be placed in the
NRC Public Document Room.
b
f
- \\-
8908240391 890817
ADOCK 05000346
O
. _ - -
_
_--_
__
_
__-_
_ - _ _ - - _ -
y , ,.
-
v ;g
?9. ..
.
'
~
> . ,
' ;fh ,
<"[-
p (
- 4
. :
R.
2ToledoJEdison' Company:
- 2 'AUG'1 ' 7 igsg .
._
"
- o
It
- p t
!We-will gladly discuss any: questions youLhave concerning this inspection.
'
. Sincerely,
>
,
3;
OldGINAL SIGNED BY R. W. DeFAYETrg
R. C. Knop, Chief.
Reactor Projects Branch 3
,
Enclosures:
,,
'
1. ' Notice of. Violation-'
2. -Inspection Report
.
.
No.'50-346/89016(DRP)-
cc w/ enclosures:
L
'L. Storz, Plant Manager
>
e
'DCD/DCB.'(RIDS)'
Licensing. Fee Management Branch .
Resident. Inspector,.'RIII
JJames W.' Harris,15 tate of Ohio-
Roger. Suppes',. Ohio;
Department,oL Heal.th-
-l A. Grandjean, State of Ohio,
Public Utilities Commission
,
..
i,
i
-.
q
.{
^RI
R
RIII
~
V.
WV
.D-
ette/ims
e'
p
8/f
slW
7 17
l
__
_ _ _ _
- _ - _ - _ - _ - _ - - - - _ - - - - _ _ _ _ - - _ _ _ _ _ - _ - _ - - _ -
-_