I Davis-Besse Nudear Power Station

= S501 North State Route 2 l m Oak Harbor, Ohio 43449-9760 Quy G. Campbell 419-3214508 Vice President- Nuclear Fax:419-321-8337 Docket Number 50-346 License Number NPF-3 Serial Number 2599 June 23, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 l

Subject:

The Davis-Besse Nuclear Power Station (DBNPS) Response to Generic Letter (GL) 98-01, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants" Ladies and Gentlemen:

The purpose of this letter is to respond to the Nuclear Regulatory Commission's request for information regarding Year 2000 readiness at nuclear power plants. Generic Letter 98-01 requested a response on the status of facility Y2K readiness by July 1,1999.

On January 14,1999, the Commission issued Supplement I to Generic Letter 98-01 to modify the request for information in the original generic letter.

The Supplement stated: l "In responding to this supplement to GL 98-01, the addressee should confirm Y2K readiness of the facility with regard to those systems within the scope of the license and NRC regulations, and I those systems required for continued operation of the facility after January 1,2000. For those l systems which are not Y2K ready as of July 1,1999, the addressee should provide a status and completion schedule for achieving readiness by the year 2000."

In response, the DBNPS is voluntarily reporting facility readiness as outuned in Supplement I to Generic Letter 98-01. Enclosed is the Year 2000 Readiness Disclosure for the DBNPS, reporting

the status of facility Y2K readiness. This disclosure is submitted under the guidelines of the l

" Year 2000 Information and Readiness Disclosure Act"(Public Law 105-271).

9907010055 990623

^

PDR ADOCK 05000346 P pg

p ,

,- Dogket Number 50-346

! License Number NPF-3

}

l Serial Number 2599 l Page 2 l

Should you have any questions or require additional information, please contact Mr. James L.  !

Freels, Manager - Regulatory Affairs, at (419) 321-8466.

l l

Very tmly yours,

% by l k FWK/laj Enclosure ,

Attachment ec: S. N. Bailey, DB-1 NRC/NRR Project Manager J. E. Dyer, Regional Administrator, NRC Region III K. S. Zellers, DB-1 NRC Senior Resident Inspector Utility Radiolc,,. . Safety Board I

e

, Docket Number 50-346 License Number NPF-3 Serial Number 2599 Enclosure Year 2000 Readiness Disclosure This year 2000 readiness disclosure is made for the Davis-Besse Nuclear Power Station (DBNPS) under the " Year 2000 Information and Readiness Disclosure Act" (Public Law 105-271), j l

This disclosure addresses the Y2K readiness of the facility with regard to those systems within the scope of the license, NRC regulations, and other systems required for continued operation of the facility after January 1,2000. A facility that is "Y2K Ready" has followed a prescribed program to identify and resolve Y2K issues so the facility can operate reliably while meeting commitments.

The FirstEnergy Nuclear Operating Company has conducted a year 2000 readiness program similar to that outlined in Nuclear Utility Year 2000 Readiness, NEI/NUSMG 97-07. The program applies to software, hardware and firmware whose failure due to a Y2K problem would prevent the performance of the safety function of a structure, system or component. Additionally, the program applies to any software, hardware, or firmware whose failure due to a Y2K problem would prevent continued operation of the nuclear facility well beyond December 31,1999. The facility program also includes identifying and, where appropriate, remediating embedded systems.

The program has provided for risk management efforts and development of contingency plans for key rollover dates.

The Y2K readiness program has been completed through the detailed assessment phase for those systems required for operation of the DBNPS facility. Only the following remediation remains to be completed to achieve year 2000 readiness at the facility:

Y2KRemediation Action Due Date For Completion DAVIS-BESSE MAINTENANCE MANAGEMENT 8/1/99 SYSTEM SURVEILLANCE TRACKING MODULE This system is used to track and schedule testing activities required for regulatory compliance in accordance with the facility's Technical Specifications. Remaining activities include software modification, testing and implementation.

To the best of our knowledge and belief, upon completion of this item, the DBNPS facility will be "Y2K Ready." Further, a contingency plan has been developed to mitigate the impact of Y2K-induced events at key rollover dates.

l l

l J

j

i p

i ..

,; ', Docket Number 50-346 License Number NPF-3 Serial Number 2599 Attachment I

COMMITMENT LIST THE FOLLOWING LIST IDENTIFIES THOSE ACTIONS COMMITTED TO BY THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) IN THIS DOCUMENT.

ANY OTHER ACTIONS DISCUSSED IN THE SUBMITTAL REPRESENT INTENDED OR PLANNED ACTIONS BY THE DBNPS. THEY ARE DESCRIBED ONLY FOR INFORMATION AND ARE NOT REGULATORY COMMITMENTS.

PLEASE NOTIFY THE MANAGER - REGULATORY AFFAIRS (419-321-8466) AT THE DBNPS OF ANY QUESTIONS REGARDING THIS DOCUMENT OR ANY i

' ASSOCIATED REGULATORY COMMITMENTS. k COMMITMENTS DUE DATE The Davis-Besse Maintenance Management 08/01/99 System - Surveillance Tracking Module will be 'Y2K Ready.