Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs
ML20210C438
Person / Time
Site: Davis Besse 
Issue date: 07/20/1999
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Campbell G
CENTERIOR ENERGY
Shared Package
ML20210C443 List:
References
50-346-99-08, NUDOCS 9907260064
Download: ML20210C438 (3)


See also: IR 05000346/1999008

Text

4

!

= /pauh4%

NUCLEAR REGULATORY COMMISSION

UNITED STATES

.'

'

]

i,

REGION lil

$

801 WARRENVILLE ROAD

' '8

N(******/

LISLE, ILLINOIS 60532-4351

'

July 20,1999

Mr. Guy G. Campbell

Vice President - Nuclear.

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2

Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/99008(DRP)

Dear Mr. Campbell:

On June 22,1999, the NRC completed an inspection at your Davis-Besse Lite. The enclosed

report presents the results of that inspection.

During the inspection period, the plant was operated in a conservative, risk-informed manner.

The unidentified reactor coolant system leak rate approached the Technical Specification limit

of 1 gallon per minute prior to the recently completed maintenance outage. Your efforts to

reduce the leak rate during the outage were effective. Subsequent to the end of the outage,

low flow rates have been routinely occurring in the containment atmosphere particulate and

gaseous radiation monitoring system. While your staff has been aggressive in attempting to

identify the reasons for this phenomenon, the frequent filter changes required to address the -

- low flow conditions have been a distraction to plant personnel.

Based on the results of this inspection, the NRC has determined that three violations of NRC

requirements occurred. - These violations are being treated as Non-Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report.' If you contest the violations or the severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection toport, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

- Washington, DC 20555-0001, with copies to the Regional Administrator, Region Ill, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

"

9907260064 990720

PDR

ADOCK 05000346

'

e

PDR

,

i

!

s

.

G. Campbell

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

Sincerely,

l

/s/ T. J. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No. 50-346

License No. NPF-3

Enclosure: Inspection Report 50-346/99008(DRP)

cc w/ encl:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, FirstEnergy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, Chairman, Ohio Public

Utilities Commission

I

DOCUMENT NAME: G:\\DAVi\\DAV99008.DRP .

To receNo e copy of thle document, Indicate in the bou *C" e Copy without attacNanci *E" e Copy with attachtenct *N= e too copy

OFFICE

Rlli

N

Kozak:codb

NAME

DATF.

07/s/99

OFFICIAL RECORD COPY

j

.

.

. m .-

es

1

'

,

G. Campbell

-3-

'

Distribution:

RPC (E-Mail)

SNB (Project Mgr.) (E-mail)

J. Caldwell, Rlli w/enci

B. Clayton, Rlll w/enct

SRI Davis-Besse w/ encl

DRP w/ encl

DRS w/enci

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

l

!-

.260021