Forwards Safety Insp Rept 50-346/89-14 on 890424-0604. No Response to Violations Required
ML20245G137
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20245G140 List:
References
NUDOCS 8906290036
Download: ML20245G137 (2)


See also: IR 05000346/1989014

Text

- - _ _ _ - - _ - _ _ _ _ _ .

p rac UNITED STATES

j_M NUCLEAR REGULATORY COMMISslON

g 7, REGION llt

5h 5 iE - 799 ROOSEVELT RO AD (

'* GLEN ELLYN, ILLINots 60137

,

.....

JUN 2 21989

I

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald C. Shelton,

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 4T 72

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. 'P. M. Byron,

R. K. Walton, and D. C. Kosloff of this office on April 24 through June 4,1989,

of activities at Davis-Besse Nuclear Power Station authorized by Facility

Operating License No. NPF-3 and to the discussion of our findings with

Mr. L. Storz at the conclusion of the inspection.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in Paragraph 2 of the enclosed report. The

inspection showed that action had been taken to correct the identified

violations and to prevent recurrence. Our understanding of your corrective

actions are described in Paragraph 2 of the enclosed inspection report.

Consequently, no reply to these violations is required and we have no further

questions regarding these matters at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

I

Richard C. Knop, Ch f

Reactor Projects Branch 3

Enclosure: Inspection Report

No. 50-346/89014(DRP)

See Attached Distribution

0

~

'3906290036 890622

PDR ADOCK 05000346

PNV

[\i

G

.

-- -_ .. .. - - - _ - - _. -- _

. . - _

.

-1-

4 s

. .

I. .

, e

.i e

9 Toldeol Edison. Company 2'

,

- J@ 2 2 m

.

! Distribution-

cc w/ enclosure:

L. Storz, P1 ant Manager-

gDCD/DCB;(RIDS)]TEREli

L1cersing Fee Management' Branch

l Resident Inspector, RIII.

' James W. Harris,-State of Ohio.-

' Roger Suppes, Ohio? ..~

. Department of Health ~

A. Grandjean,= State of. Ohio,.

-Public Utilities Commission

. -

.

,

4

() -

u

.

-- .- ena. . __ _ _ - - - a--._-- - a.-- - ---- ---.--------_.-- _ _ - - - - - - - - - - - - - - - - --- ---------_----_--u--------.-----.u--,-------_----_--________-x__-A