Insp Rept 50-346/88-24 on 880804-1020.Violations Noted. Major Areas inspected:post-mod Procedure Review & Tests Witnessing,Containment Integrated Leak Rate Test (Cilrt), Cilrt Procedure Review,Test Witnessing & Evaluation
ML20206M410
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/18/1988
From: Mendez R, Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19064A392 List:
References
50-346-88-24, NUDOCS 8811300558
Download: ML20206M410 (19)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _

e

.

e U.S. NUCLEAR REGULATORf COMMISSION

REGION III

Report No. 50-346/88024(ORS)

Docket No. 50-346 License No. NPF-3 t.icensee:

Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name:

Davis-Besse, Unit 1 Inspection At:

Oak Harbor, Ohio

!

Inspection Conducted:

August 4 through October 20, 1988 Inspector:

R. Mendez

  1. pr.4 /f /914'

e Date W

,

Approved By:

M. i. Phillips, Chief M r d, /2 /9P#

e Oparational Programs Section Date Inspection Summary Inspection on August 4 through October 20, 1988 (Report No. 50-346/88024(DRS))

l Areas Inspected:

Routine, announced inspection by a Region based inspector of Post Modification Procedure Review, Post Modification Test Witnessing, Containment Integrated Leak Rate Test (CILRT), CILRT Procedure Review, CILRT Test Witnessing, CILRT Test Results Evaluation, NRC modules utilized during this inspection included 72701, 70307, 70313 70323, and 61720 Results:

Three violations were identified (failure to take auequate corrective action to lineup valves - Paragraph 5.b.(2); failure to perform an as-found local leak rate test - Paragraph 3.d; and failure to follow proc wures and i

properly lineup valves - Paragraphs 3.a, 3.c.(1), 3.c.(4), 3.f.(3), and 5.b.(1)).

l l

'

set 130055s sat 121 PDR ADOCK 05U00345 o

PDC

<

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

.

DETAILS j

1.

Persons Contacted Toledo Edison Company

-

L. F. Storz, Plant Manager

  1. R. K. Flood, Assistant Plant Manager
    • J. Kasper, Operations Superintendent

.

+#*E. Caba, Station Performance Supervisor

  1. J. E. Moyers, Quality Verification Manager

+#*B. Shingleton, Licensing Engineer

  1. C. Ashworth, QA Surveillance i.

+*S. Honma, Compliance Supervisor

  • E. Chimahusky, Performance Supervisor
  • J. Wood, Systems Engineer R. Garver, System Engineer
  • H. Knaszek, Senior Design Engineer J. Tabonn, Test Leader

<

D. Gallegos, Test Leader J. Nelson, Test Leader

-

j S. Loeper, Test Leader T.

Knox, Test Leader

.

D. Johnson, Test Leader T. Woodroffe, Test Leader

,

+R. Elfstrom, Performance and Senior Engineer

  • S. Cjain, Nuclear Engineering Manager
  • C. Daft, Technical Planning Manager
  • J. Stotz, Associate Nuclear Engineer i
  • R. W. Shrauder, Nuclear Licensing Manager
  • P. Hilderbrandt, Engineering Director i

G. Gibbs, Performance Engineering Director j

  • N. Bonner, Maintenance Manager
  1. J. E. Moyers, Quality Verification Manager j

Stone and Webster

  1. R. I. Parry, ILRT Consultant
  1. J. L. Barnes, ILRT Shift Test Director

,

l 8Q. E. Harper, ILRT Shift Test Director

)

Nuclear Regulatory Commission

!

  1. P. M. Byron, Senior Resident Inspector j
  • D. Kosloff, Resident Inspector t
  • Denotes persons attending the exit meeting of September 9, 1988.
  1. Denotes persons attending the exit meeting of September 30, 1988.

,

l

+ Denotes persons attending the telephone conference calls on October 20, 1988.

i

!

l

,

.- _. _ _ _ _ _.-_,

- _,- _---- - - - - _ - _

...

,

i

.

,

'

!

!

>

.

.

The inspector also contacted other licensee personnel including members i

of the technical, operating, and regulatory assurance staff.

l 2.

Post Modification Test Procedure Review

!

The inspector reviewed procedures for post modification testing, f

surveillance testing, and periodic testing which were used to verify the i

functional capability of plant systems.

This review verified that the i

test procedures adequately demonstrated the functional capabilities of

!

the systems in their anticipated operating conditions; were reviewed

'

and approved by the appropriate management personnel; and contained appropriate acceptance criteria.

During the 1988 outage, the licensee initiated several changes to the Davis-Besse plant configuration.

The major changes included modifying the auxiliary feedwater (AFW) system to install new DC powered modulating control valves and cavitating venturis to control steam generator level.

Other changes to the auxiliary feedwater system included location changes to the control circuit and control switches to the Steam and Feedwater Rupture Control System (SFRCS)/AFW Panel; steam generator level control modifications; and additional control room and local indication.

The inspector reviewed the procedures and observed the functional capability of the above modifications to the auxiliary feedwater system, the modifications to the motor driven feed pump, the SFRCS acceptance test and surveillance testing performed during the outage.

The following procedures were reviewed:

DB-SP-04152, Revision 00, "AFPT 1 HSS, LSS, and Overspeed Trip Test" DB-PF-10037, Revision 00, "Makeup Feed and Bleed Mode 5 Test" DB-SC-10067, Revision 00, "ICS/NN! Auto Select Test" DB-PF-10059, Revision 00, "AFW System Auxiliary Steam Test" DB-PF-10076, Revision 00, "Makeup Feed and Bleed Hydrostatic Tests" DB-PF-10050, Revision 00 "Motor Driven Feed Pump System Flush and Acceptance Test" DB-PF-10058, Revision 00, "Auxiliary Feedwater Level Control System Response Test" 08-50-03114, Revision 00, "SFAS Integrated Time Response Test" DB-SP-04153 Revision 00, "AFPT 2 HSS, LSS, and Overspeed Trip Test" DB-SP-10015, Revision 00, "HPI Test Line Performance Test" DB-PF-10031, Revision 00, "AFW Sy! tem Main Steam Tests" OB-SP-10072, Revision 00, "LPI System Injection Test"

- _ _

_ _ _ _

._ _.

,

'

,

.

DB-PF-10020, Revision 00, "Remote Multiplexer - C4601 - Acceptance Test" l

-

08-SC-10073, Revision 00, "SFAS Block Switch Verification Test" l

l DB-PF-10061, Revision 00, "SFRCS Acceptance Test" J

t

!

No violations or deviations were identified.

!

'

.;

i

3.

Post Modification Test Witnessing

Y J

The inspector observed post modification testing, surveillance testing,

and periodic testing which were performed to verify the functional i

l operability of the systems.

Observations of testing verified that

,

j testing was performed in accordance with approved procedures; limiting i

conditions for operation were met; prerequisites and initial conditions

. :

l were met; and that deficiencies during the performance of the test were

!

adequately documented and resolved.

i

,

The inspector witntssed the following tests:

[

,

DB-SP-04152, Revision 00, "AFPT 1 HSS, LSS, and Overspeed Trip Test"

)

DB-PF-10037, Revision 00, "Makeup Feed and Bleed Mode 5 Test" f

i i

0B-5C-10067, Revision 00, "ICS/NNI Auto Select Test"

1 DB-PF-10059, Revision 00, "AFW System Auxiliary Steam Test"

I OB-PF-1.976, Revision 00, "Makeup Feed and Bleed Hydrostatic Test:"

[

i 08-PF-10050, Revision 00, "Motor Driven Feed Pump System Flush i

j and Acceptance Test"

!

!

08-PF-10058, Revision 00, "Auxiliary Feedwater Level Control i

System Response Test" l

l OB-SP-04153, Revision 00, M FPT 2 HSS, LSS, and Overspeed Trip Test"

[

DB-PF-10031, Revision 00, "AFW System Main Steam Tests" l

\\

l

'

j DB-PF-10020, Revision 00, "Remote Multiplexer - C4601 - Acceptance i

Test" l

0B-5C-10073, Revision 00, "SFAS Block Switch Verification Test" DB-PF-10061, Revision 00, "SFRCS Acceptance Test"

[

i

i The following are coments, observations, or problems identified while I

j witnessing test performance.

[

L

'

,i

,

. _ _ _ _ - _ _ _ _ _ -

_ ___ ___ __________ _ _ _ _ _ _ _ ___

_ _ - _ _ _ _

- _ _ _ _

__-

\\

.

I

,

-

a.

On August 9, 1988, the inspector witnessed portions of the Auxiliary i

Feedwater Pump lurbine (AFPT) 2 overspeed trip test, DB-SP-04153.

i Prior to the start of the test, the inspector asked the licensee if the valve lineup had been completed for the test.

The inspector jl was shown the completed and signed off checklist required by

Section 5.1 of the procedure.

The inspector visually verified, with i

the help of an operator, the position of the valves as delineated in l

Procedure DB-SP 04153, Attachment 1:

AFPT Valve Lineup.

During the walkdown, the inspector identified to the operator that the a

l AFPT 1-2 casing drain throttle Valve MS744A appeared to be closed,

-

but that the valve lineup sheet required the valve to be open.

The operator subsequently turned the hand wheel of the valve

l toward the open position and stated to the inspector that the valve had been cracked open.

The inspector mentioned to the

.

operator that the lineup sheet required the valve to be fully open and not cracked open.

The inspector subsequently observed the AFPT 1-2 casing drain throttle Valve MS747A to be in the proper closed position when the openator believing that the valve was i

improperly positioned fully, opened the valve.

The inspector J

notified the operator that he had incorrectly placed the valve in I

the wrong position.

This valve is not required to be opened until

]

Step 5.16.3 of Procedure DB-SP-04153.

This failure by the licensee to follow procedures is a violation of 10 CFR 50, Appendix B, i

j Criterion V (50-346/88024-1A).

i b.

Prior to the start of the Steam Feedwater Rupture Control System

(SFRCS) Test No. DB-PF-10061, the licensee found that they were unable to energize the the SCFRCS cabinet Channels 1 and 2.

The i

licensee found that the 15 ampere fuses used in the power supplies i

of the SFRCS Channels 1 and 2 circuits could not sustain the initial j

inrush current.

The licensee concluded that the fuses were undersized

for the required application.

The licensee issued Field Problem

Resolution No. 87-1107-181 which initiated Calculation No. C-EE-017-01-001 to determine the proper fuse size.

The licensee l

determined that the maximum peak inrush current of 76 amperes was

sustained for a period of about one cycle.

The licensee coordinated i

the size of the fuse with the protected device upstream and concluded that a 30 amp fuse would safely sustain the peak inrush current.

The

'

fuses were installed and the licensee perforud an adequate test of j

the Channel 2 SFRCS cabinet.

l c.

On March 30, 1988, during the performance of the local leak rate test (LLRT), Surveillance Procedure No. ST 5061.02, the licensee j

was unable to pressurize between containment isolation Valves CV 5085

and CV 5075.

These valves are part of the containment vessel vacuum breaker system, Penetration No. 8F.

Additionally, on April 7, 1988, the licensee failed to pressurize between containment isolation Valves CC 1407A and CC 1407B which are part of the component cooling water line from containment, penetration No. 4.

Furthermore, the inspector was informed that the licensee was unable to pressurize or quantify the leakage rates of Penetrations 12, 42A, 73B, and 82.

Failure to pressurize and consequently to quantify the leak between

.

l

!

i

ths valves caused the licensee to apparently exceed the limit of tecnnical specification Section 3.6.1.2.b.

This section of the

Technical Specifications required that containment integrity be I

maintained a7d that the containment leakage rate shall be less than

!

0.60 La for all penetrations and valves subject to Type B and C tests.

j The licensee performed the surveillances on the containment isolation valves approximately three weeks after shutdown for refueling.

On May 6, 1988, the licensee issued a Potential Condition adverse to Quality Report (PCAQ) No.88-343.

The PCAQ identified several valves which failed to meet the acceptance criteria during surveillance testing.

The inspector discussed failure of the above valves and penetrations with the licensee.

The inspector informed the licensee that whenever technical specifications are exceeded, 10 CFR 50.73 requires that a Licensee Event Report (LER) shall be issued within 30 days after the discovery of the event.

In addition, 10 CFR 50.7)

states that the licensee shall report an event regardless of the plant mode and ragardless of the significance of the structure or component.

The inspector informed the licensee that the issue was not containment integrity, but the reportability of the event since it was reasonable to assume the valve in question had degraded somewhere in the operating cycle and not during the three weeks the unit was shutdown.

It was the inspector's concern that degradation of the valves was a progressive proc. ass and did not occur instantaneous as with switches or relays.

It was the licensee's position that they had not violated Section 3.6.1.2.b of their Technical Specifications since this section applies in Modes 1 through 4 and was not applicable at the time the containment isolation valves were tested.

In particular, the licensee referenced NUREG-1022, Supplement 1 which provides guidance on the reportability rule of 10 CFR 50.73.

The licensee cited Question and Answer 2.3 on Page 4 of the supplement, which states as follows:

Question: We believe that surveillance testing and redundancy together promise assurance of operability.

Further, we often have 7-day LCOs and n perform surveillance tests on 30-day intervals.

Is an LER required every time we find a problem during surveillance testing?

Answer:

No, In general, for the purpose of evaluating the reportability of situations found during surveillance tes+s, it should be assumed that the situation occurred at the time of discovery, unless there is firm eddence to believe otherwise.

For example, if a standby component wtth a 7-day LCO is found to be inoperable because it was assembled improperly durir.g the maintenance conducted 30 days previously, then there is firm evidence that it had been inoperable for the entire 30 days, and an LER is required.

._

_ _.

_ _ _ _ _ _ _ _

_

_ _ _ _ -

'

.

ll

.

In summary, the licensee's position was that since they had no j

knowledge of the degradation of the valves while the plant was j

operating, they did not have to report the event.

The licensee

!

stated that an LER was not required since they had no renon to suspect improper maintenance during the previous outage.

Furthermore, the licensee stated that the containment boundary had not been degraded since at least one of the two valves in each peretration boundary passed the local leak rate test.

The licensee took

corrective action to repair the valves. With respect te Penetration 8F the licensee cleaned and replaced worn parts on Valve CV 5085, but performed maintenance on Valve CV5075, (See paragraph 3.d).

A local leak rate test was performed with satisfactory results.

The valves on Penetration No. 4 required no

actual repairs.

The limit switch settings on the motor operator

for Valve CC1407A were reset and no work was performed on CC14078.

A local leakage rate test for information only was performed with satisfactory results.

Corrective action on Penetrations 13, 42A, 73B and 82 will be reviewed in a subsequent inspection.

On September 9, 1988, the inspector held an exit interview with the licensee.

During the exit, the inspec, r stated that although the reporting requirements of 10 CFR 50.73 and NUREG-1022 were not always clear, exceeding 0.6 La for Type B and C tests should not mean that the limit was exceeded during operation, but that as a minimum exceeding the limit of 0.6 La required reporting the event through an LER.

The inspector's concern was that the licensee was interpreting Section 3.6.1.2.b of their Technical Specifications such that the licensee would not report exceading the 0.6 La limit under most circumstances.

For example, the applicable modes for Section 3.6.1.2.b of the Technical Specifications are 1, 2, 3, and 4.

In general, the licensee cannot test and is not required to test in the above modes.

Once the licensee shuts down for refueling, the applicable modes no longer apply and, conser,uently, the licensee would not be required to report excessive leaking valves which exceed the 0.60 La limit.

In addition to the above cencern, reporting of the 0.60 La limit is indicative of how well licensee's uaintain their containments boundaries and containment isolation valves.

On September 13, 1988, the licensee called the Region to discuss further the reporting requirement.

The Region agreed with the licensee that the Davis-Besse Technical Specification and NUREG-1022 leave room for interpretation for reporting events.

This issue is unresolved pending further resolution and will be forwarded to NRR (50-346/88024-02),

d.

On March 30, 1988, the licensee performed a local leak rate test (LLRT) on penetration 8F by pressurizing between motor operator valve (MOV) CV5075 and check valve CV5085.

The testing personnel were unable to quantify the leakage between the valves but determined that the check valve was leaking excessively.

No work on CV5075 was to be performed until CV5095 was repaired.

Valve

_ _ _ _ - _ _ _ _ _ - _

,

.

-

CV5085, was disassembled, maintenance performed, cleaned, inspected l

'

and reassembled.

During this time, the licensee issued Maintenance Work Order (MWO) 3-88-783-01 to initiate action to remove the limit

,

'

'

i switch and perform maintenance on valve CV5075.

The MWO required

a verification that the pre-maintenance LLRT had been performed, i

j however, the Hd0 was incorrectly signed off.

Consequently, i

maintenance was performed on valve CV5075 without determining a

!

j leakage value in the as found condition, j

l The "as found" condition is required by 10 CFR 50, Appendix J and

,

is the condition of the containment at the beginning of the outage i

l prior to any repairs or adjustments (ras) to the containment i

boundary.

10 CFR 50, Appendix J, paragraph III.A.1 requires that l

a j

"During the period between the initiation of the containment'

i

{

inspection and the perforrr.ance of the Type A test, no repairs or

?

i adjustments shall be made so that the containment can be tested in l

as close to the "as is" condition as practical." ANSI N45.4-1972,

.

'l paragraph 4.2 requires that; "For retesting, an initial record

!

proof test shall be conducted at time periods and pressures l

established by the responsible organization, before any preparatory l

i repairs are made.

This will disclosed the normal state of repair of the containment structure and a record of the results shall be f

'

J retained."

.Ne NRC's position on the "initial record proof test" j

requirement, is that is may be waived, provided the Type A test results are back corrected for all ras to tne containment boundary

!

made prior to the performance of the Type A test.

If ras are made to the containment boundary prior to the Type.A I

test, local leak rate tests must be perfo'med to determine the

,

leakage rates before and after the RAS.

The "as found" Tvpe A test

'

I results can then be obtained by adding the difference between the affected path leakages before and after ras to the overall Type A test results.

These "as found" leakage rate results are required

and carry the same reporting requirements as the other Type ti,

[

j B and C test results.

An acceptable methodology to back correct I

the Type A test results is the minimum pathway leakage as described j

j in paragraph 4.b.(2) of this report.

t

'

)

On October 20, 1988, the licensee and the inspe; tor further discussed l

l the above issue.

The licensee stated that alth3 ugh maintenance had i

been performed on valve CV5075, and the limit switch was removed i

<

I from the MOV, no repairs or adjustments were "made to the valve.

In I

)

addition, the licensee had previously issued Potential Condition Adverse to Quality (PCAQ) Report No. 88-0343 which addressed excessive

s i

leaking penetrations and evaluated removal of the limit switch.

The

)

PCAQ stated that removal of the limit switch was performed ir.

j

accordance with procedure MP 1411.06, which dis-engaged the limit i

j switch at a known point in travel and reinstalled it at the same l

point, and according to the licensee, this precluded changes in the

!

seating characteristics of the valve.

The licensee also compared l

,

stroke times of the valve both before and after maintenance and found j

]

that the differences were within three to four hu.1dredths of a second, j

j In addition, the licensee performed an as left LLRT on penetration 8F i

with good results.

'

>

l t

-

.

-

.

. -

___

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

!

!

.

!

i l

.

.

,

,

i The inspector agreed with the licensee's evaluation which indicated

,

that containment integrity probably had not been compromised,

,

j although the licensee originally failed to pressurize between the i

i two valves.

However, it was tue inspector's concern that the l

i licensed lost control of valve CV5075 when an improper sign off of

,

the MWO resulted in maintenance being performed, on the valve,

!

,!

before the leakage rate between the valves was quantified.

(

-

The failure to perforte, an as-found local leak rate test on L

-

l penetration 8F is considered a violation of 10CFR 50, Appendix J

(346/68024-03).

I Due to the licensee's technical evaluation of valve CV5075 this

!

item does not require a response.

!

e.

On August 11, 1988, the inspector observed that the sensing line i

connections from the flow element of the auxiliary feedwater system f

I to flow Transmitter FT-6424, appeared not to be connected properly.

!

j Ths. high pressure and low pressure sensing lines were not connected l

correctly to their respective high and low sides of the flow l

transmitter.

Flow Transinitter FT-6426 is a new Class 1E differential f

pressure based instrument which taps off the existing orifice plate

{

in the AFW flow line and provides flow indication in the control

!

room.

The inspector notified the systems engineer of the discrepant

!

condition and discussed installation of the transmitter witn the modifications department.

The inspector asked the licensee if the

J installation had been QC inspected.

The inspector was informed that

!

the installation of the transmitter had not been final QC inspected

'

<

due to a code change on the root valve welds.

The licensee indicated

!

{

that as soon as the required non-destructive test was performed, the l

i installation would be final QC 1r"pect2d.

The inspector reviewed

J installation documents in the held Change Request (FCR) No. 87-0069 l

]

package and noted that the licensee had not identified the incorrect i

l connections to the transmitter.

On August 12, 1988, after the

{

J inspector had identified the problem, the licensee field i

i inspected the transmitter and found the instrument sensing lines

{

reversed.

The licensee issued Field Change Notice 9116.

On a i

subsequent field inspection during the CILRT, the inspector noted that the connections to flow Transmitter FT-6426 had been corrected.

'

I f.

With respect to DB PF-10050, the inspector had the following comments:

)

!

(1) On August 10,.'988, the licensee tested the motor driven feed j

pump (MDFP) and performed Section 6.2 of Procedure DB-PF-10050.

j This section tests the MDFP dir' arge lines to the test line i

return of the condensate storage tank.

During performance of l

Steps 6.2.1 through 6.2.6, the inspector noted that a six inch globe Valve FW174 was being throttled.

The initial valve J

lineup for this valve is that the valve be open.

Valve FW174 is not required to be throttled closed until Step 6.2.38.

l Additionally, the inspector noted that the test leader skipped I

-

Steps 6.2.25 and 6.2.27 and continued with Steps 6.2.28 through

6.2.35.

Step 6.2.25 requires that the vibration on the motor J

l

!

l

!

f

_ _. ___ ___

_ _ - - _ _

-

i

.

!

driven feedpump be within prescribed limits and Step 6.2.27 I

.

requires that instrument tubing to Valve FW 5884 be reconnected.

!

At about Step 6.2.35, the inspector spoke with the tJst personnel j

who were performing the vibration checks and asked if they had (

conveyed any information tu the test leader on the accaptat.ility

of the vibration on tha PDFP.

The test personnel stated that i

they had not conveyed the information, but indicated that the i

vibration appearid to be acceptable.

The test leader continued

,

with the test until Step 6.2.38, at this time the inspector asked i

why Step 6.2.25 and 6.2.27 had not been signed off.

The test

leader stated he had not received any information on the uriacceptability of the vibration and signed Steps 6.2.25 and

6.2.27.

The licensee's Procedure AD 1801.00, Acceptance Test

!

i Program, under Test Conduct, Section 6.4.1.d. required that t

!

"Procedure steps and sections shall be perfctmed in numerical I

sequence unless otherwise noted in the test procedure." The

,

'

failure by the licensee to assure that steps in a test procedure were performed in numerical sequence and that procedures were i

,

'

adequately followed is considered another example of a violation

.

10 CFR Part 50, Appentiix B, Criterion V (336/88024-01B).

l

-

(2) The licensee continued with the test and attempted to throttle l

close Valve FW174.

The further Valve FW174 w3s throttled r

closed, the more the piping to the condensate storage tank

'

(CST) vibrated.

Vibration of the line continued until another

!

valve FW127 rattled open causing the water from the CST to i

j spill on the floor.

The test was stopped, j

On August 11, 1988, the licensee resuraed the test and again l

attempted to throttle close Valve FW174.

Excessive vibration r'

on the piping was experienced again and the packing on Valve FW 174 started to come apart with water spilling out

j through the sides and packing of the valve.

The test was stopped

'

once again.

The licensee subsequently informed the inspe; tor l

j that the valve may not be suitable for its present application.

l The li:ensee indicated that the six inch globe valve was actually a steam valve and was not suitable for feedwater, However,

,

l valve FW174 is installed in a test line which discharges into the l

CST and is not used during normal operation.

The licenseas is

,

,

in the process of determining an alternate method to create the

'

.!

required pressure drop across the test line.

The licensee plans

!

to cut the valve out and place three orifices in series to obtain i

'

j the required pressure drop.

,

(3) On September 7, 1988, the inspector witnessed portions of

i Section 6.4 in Procedure DB-PF-100$0.

In this part of the

procedure, the MDFP discharges into the steam generators, j

The test leader was reperforming Section 6.4 for the third i

'

i time, since an acceptable inspection on the water quality j

l through the AFW strainer had not been attained.

While the

,

I test leader was performing Step 6.4.9 of the procedure, he l

l noticed that Valve AF3872 was in the open position.

The test

!

leader called a reactor operator who placed the valve in the l

,

l closed position.

The inspector subsequently rsviewed

[

'

i

!

,

t

'

_ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

o t

.

'

Note 6.4 of Procedure 08-PF-10050.

The note ruerences Attachment 9 of the procedure for the initial valve lineup.

Attachment 9 of Procedure DB-PF-10050 requires the

'

Valve AF3872 be in the closed position prior to the start of

the test.

The test leader indicated that Valve AF 3872 may

,

have been opened during performance of Test OB-PF-10058 on

,

the evening of the previous day (September 6, 1988).

The i

j failure to properly check prerequisites prior to entering

a test and failure to assure that procedures are adequately

followed is considered a violation of 10 CFR Part 50,

1 Appendix B, Criterion V (346/88024-01C).

,

(4) On September 7 and 8, 1988, the inspector witnessed reperformance i

of the motor driven feed pump flush test (DB-PF-10050) Section 6.4.

!

In this section, the test leader has the option of repeating the i

steps if during flJshing of the motor driven feed pump the water

[

quality is not acceptable.

The inspector noted during test

[

witnessing that the test leader was not resigning the steps in

!

Section 6.4.

Steps 6.4.1 through 6.4.17 had been reperformed

!

)

on September 6, 7 and 8, 1988 in order to obtain an acceptable L

i waterqualitydurIngflushingoftheline. Davis-Besse procedure f

!

Acceptance Test Program, AD 1801.00, Section 6.4.6 allows steps L

to be repeated as long as the required conditions are present, The procedure further states, "Repeated step's shall be documented t

by resigning the individual affected steps.

10 CFR 50, j

Appendix B, Criterion XI, Test Control, required that test

results shall be documented and evaluated to assure that test

!

requirements have been satisfied.

The inspector noted that v

during reperformance of Section 6.4, the test leader was visually i

following the steps, but did not document the test results of the

three reperformances of Section 6.4.1.

The failure to follow procedures is another example of a violation of 10 CFR Part 50, Criterion V (50-346/88024-010).

4.

Containment Integrated Leak Rate Test Procedure Review a.

Procedure Review

i T % Inspector reviewed Procedure No. DB-PF-03009, dated Septsimber 7, 1988, "Containment Integrated Lo k Rate Test," relative to the requirements of 10 CFR 50, Appendix J. ANSI N45.4-1972 and the

,

Technical Specifications,

'

b.

Summary of Appendix J Requirements To eheure the licensee's understanding of Appendix J requirements,

',

the inspector conducted discussions with licensee personnel during the cou*se of tae inspection.

The following is a summary of the clarifications tot discussed with the licensee during the previous CILRT as documen'.ed in Inspection Report No. 346/84029.

(1) The only method of data reduction acceptable ta the NRC are toi.al time o a point-to point as described in ANSI N45.4-1972, including a statistically calculated instrument error analysis,

_ - _ _ - _ _ _ _ _

__

l

.

,

.

.

T h follcwing optie'-

ce available to the licensee and are suggested in the f,,llowing order:

t (a) Tetal tin (< 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration test), in accordance with Bechtel Corp. Topical Report BN-TOP-1, !, vision '..

Whenever this method is used BN-TOP-1 must be followed in

.

its entirety except for any section which conflicts with

!

Appendix J requirements, i

I (b) Total time (> 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration test) using single sided l

95% UCL.

(

(c) Proposed Regulatory Guide t15 021 5 Regulatory Position 13.

IfthismethodisutIlized,the i

licensee must submit an exemption request to NRC l

and receive approval for its use prior to the t

expiration of the Type A test frequency requirements l

stated in Technical Specificationt..

l

!

(2) Periodic Type A, B, and C tests must include as-found results

as well as as-left.

If Type B and C tests are conducted prior j

to a Type A, the as found conditions of the containment must be

calculated by adding any improvements in leakage rates, which

!

are the results of repairs and adjustments (RA), to the Type A l

test results using the "minimum pathway leakage" methodology.

l This method requires that:

(a)

In the case where individual leak rates are assigned to l

two valves in series (both before and after the RA), the j

penetration through leakage would simply be the smaller of l

the valves' leak rates, j

[

(b)

In the case where a leak rate is obtained by pressurizing between two isolation valves and the individual valve's f

leak rate is not quantified, the as found and as-left

!

penetration through-leakage for each valve would be 50%

l of the measured leak rate if both valves are repaired.

(

(c)

In the case where a leak rate is obtained by pressurizing

!

between two isolation valves and only one valve is

!

repaired, the as-found penetration leak rate would i

conservatively be the final measured leak rate, and

!

the as-left penetration through leik rate would be l

2ero (this assumes the repaired valve leaks zero).

[

l (3) Penetrations which are required to b. Type C tested, as i

described in the FSAR and SER, must by vented inside and

!

outside the containment during the CILRT.

All vented

'

penetrations must be crained of water inside the containment

[

between the penetration valves to assure exposure of the containment isolation valves to containment air test pressure.

The degree of draining of vented penetrations ortside of containment is controlled by the requirement that i

-

. - -,

.

- - - -

. _ _. -.

-J

_ _ _ _ _ _ _ _ _ _

.

'

o

.

e

,

the valves he subjected to the post-accident differential pressure. or oroof that the the system was built to stringent quality s m rance standards comparable to those required for a soi'

'*m.

(4) lhe : <

CILRT must be noted in the test log at the time the

.

'termines that the containment stabilization has bee, s

arily completed.

Reinitializing a test in pro'

. be "forward looking" that is, the new start

,

~

.

time e se the time at which the decision to restart is made.

This also implies that the licensee has determined that the test has failed, and has enough data to quantify the leakage rate.

Any deviation from these positions should be discussed, and documented, with the NRC inspector as they occur to avoid later invalidations of the test results.

Examples of acceptable deviations of reinitializing the start time of the test in the past are:

time at which a leaking penetration which has an obvious effect on the test. data was sscure' accidentel opening and later closing of a valve which has a'. obvious effect on the test data, and the time at which an airlock outer door was closed and the inner door was open.

(5) The supplemental or verification test should start within one hour after the completion of the CILRT.

If problems are encountered in the start of the supplemental test, data recording must continue and be considered part of the CILRT until the proble:ns are corrected and the supplemental test can begin.

(6) During a CILRT, it may become necessary to reject or delete specific sensors or data points due to drifting or erroneous sensors, or data ou+11ers.

Data rejection criteria should be

'

developed and used so that there is a consistent, technical basis for data rejection.

One example of an acceptable method for data outliers is considered in an Appendix to ANSI /ANS 56.8-1981.

Sensor data rejection criteria should be l

plant specific and based upon a sensor s trend relative to the average scatter, slope, and/or absolute output of the sensor.

(7) The water level in the steam generators during the CILRT must be low enough to ensure it does not enter the main steam lines unless flooding of the main steam lines is called for in the loss of coolant emergency proceduie.

(8) Test connections must be administrdively controlled to ensure their leak tightness or otherwise be subject to Type C testing.

One way to ensure their leak tightness is to cap, with a good seal, the test connection after its use.

Proper administrative controls shculd ensure valve closure and cap reinsta11ation within the local leak rate testing procedure, and with a checklist prior to unit restart.

<

,

..

s:

(9) Whenever a valve is rep 1_ aced, repaired, or repacked during an outage for which Type'A, B, and/or C surveillance testing was scheduled, local leak rate testing for the as-found as well as the as-left condition must be performed on that penetration.

In the case of a replaced valve, the as-found test can be waived if no other containment isolation valve of similar design exists at the site.

(10) The periodic retest schedule for each penetration subject to

. Type B or Type C testing, except for airlocks and penetration employing a continuous leakage monitoring system, shall be every refueling outage, but in no case shall the interval be greater than two years.

5.

Containment Integrated leak' Rate Test Witnessing a.

Instrumentation l

The inspector resnewed calibration data and determined that the instruments used in the CILRT had been properly calibrated and that the correct weight factors had been placed in the computer program as required.

The following instrumentation was used.

Typ_e Quanti _ty RTD's

Humidity

Pressure Gauges

,

Flowmeter

,itness of Test W

b.

The inspector witnessed portions of the CILRT on September 25-30, 1988, and noted that test prerequisites were met (except where

noted below) and that the appropriate revision to the surveillance procedure was followed by test personnel.

Valve lineups for the

l following systems were verified to ensure that adequate venting and

'

draining was ~ovided:

system Penetration Pres,surizer Quench Tank Circulating Inlet

9ervice Air 42A Ccati vent Air Supply 43A Containment Vessel Air Sample Return 43B Core Flooding Tank Fill and Nitrogen Supply 44A I

Containment N2 Supply Header 448 l

Core Flooding Tank Sample 47A l

Core Flooding Tank Vent 47B Pressurizer Quench Tank Circulating Outlet

'

Hydrogen Purge System Exhaust

Hydrogen Dilution System Supply

14 o

._

-

.

Pressurizer Quench Tank Sample 68A Containment Air Sample 68B

,

hydrogen Dilution System Supply

I Containment Air Sample 718 Core Flooding Tank Fill and N2 Supply 71C

Containment Pressure Sensor 73A l

(1) On the evening of September 25, 1988, the licensee had almost completed the valve lineups and indicated that they were ready l

to close containment and start pressurization.

At about 9:00 p.m., with assistance from an operator, the inspector entered containment to observe valve lineups and verify the valve positions against the CILRT procedure.

While observing the valve lineups, the inspector noted that Red Danger Tag No. 639 on Valve 55165 (Quench Tank to Sample Leak Valve)

required the valve to be open, but the valve was in the closed position.

The CILRT procedure also required the valve to be in the open position.

The operator notified the control room and asked for permission to change Valve 55165 to its proper open position.

Permission was granted, but the control room notified the operator a short time later that Valve 55165 had not been double verified.

Davis-Besse's Safety Tagging Procedure AD 1803.00 requires a verification and an independent verification when equipment is taken out of service and Red Danger Tags are installed on out of service components or equipment.

At about midnight, the inspector completed verification of the selected valves and discussed the apparent mispositioning of Valve SS165 with the Shift Technical Engineer who was in the control room.

The inspector reviewed the tagging log and noted that the entries for Valve SS165 showed that the valve had been previously positioned for the CILRT, but the verification and independent verification initials had been lined out.

The inspector observed what appeared to be an additional entry in the previously lined out verification block for Valve 55165 indicated that the valve may have been verified, but not double verified.

The inspector reviewed the tagging log further and noted numerous entries which had been lined out and some which appeared to be incorrect or ambiguous.

The inspector noted that the verification block for Red Danger Tag No. 67, Valve CF104 had not been initialed indicating that the valve had not been positioned for the CILRT.

When the inspector entered containment a second time and found Tag No. 67 was found hanging from the valve.

Additionally, the verification and independent verification blocks were lined out for Tag No. 310, Vrive NN72 indicating that the valve was not positioned for the CILRT; however, the Assistant Shift Supervisor stated that the valve had been repositioned for the CILRT the day before, but the verification and independent verification bl u ks had not been initialed.

The inspector also noted that as a practice when repositioning valves, the licensee does not cross out the verification blocks, but issues temporary lifts.

The practice of crossing out initials; however is not disallowed by the licensee's procedure.

Although the licensee had not

__

_

_ _, _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ - _ _ _.

_

.

_

_ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ -

s

.

o

.s

.

completed the positioning of all the valves for the CILRT, they appeared to have poorly maintained an accurate up to date tagging log.in the control room.

On September 26, 1988, the licensee initiated a triple verification of the valve lineup due to concerns expressed by the NRC inspector.

The licensee found that Valves SA508 and MS883 were not in the position' required by Section 3.1, Attachment 2 of tne CILRT Procedure DB-PF-03009.

Although Valves SA508 and MS883 had already been verified and independently verified, they were both in the open position, but required to be closed for the CILRT.

The failure to adequately lineup valves and follow procedures is a violation of 10 CFR 50, Appendix B, Criterion V (50-346/88024-1E).

(2) On September 27, 1988, at about 5:45 a.m., the licensee started to pressurize containment.

During pressurization, the licensee started to notice an increase in pressurizer level from about 180 inches to 220 inches.

The overflow level for the pressurizer is 320 inches.

At about 9:00 a.m., the Shift Supervisor suspended pressurization when the level reached 300 inches and the containment pre.,sure was 8.5 psig.

The licensee theorized that a loop seal had formed in the pressurizer vent line which caused the pressurizer to be at a lower pressure tnan the rest of containment.

The lower pressurizer pressure caused water to flow from the steam generators into the pressurizer.

The licensee made plans to create an additional pressurizer vent path and send a team into containment without having to depressurize the containment.

The licensee entered containment at 8:19 p.m. on September 27, 1988, and found that motor operated Valve RC 239A whi:h should have been opened to establish the vent path, was in the closed position.

The licensee manually opened Valve RC 239A and the pressurizer level dropped to approximately 100 inches.

The licensee stated that Valve RC239A had been verified as being open, but that the valve had malfunctioned thus giving an erroneous indication.

The inspector determined that it was licensee's practice to position motor operator valves, verify the position and remove the power source to the valve prior to i

the start of CILRTs.

Removal of power source also removed the valve position indication in the control room.

Potential Condition adverse to Quality Report No. 88-0778 was issued to i

j investigate the apparent malfunctioning of the valve.

The

licensee continued with pressurization and reached accident pressure with no further complications.

However, the

'

mispositioning of Valve RC239A is another example of the

licensee's inattention to detail to assure that valves are l

properly positioned prior to the start of testing.

In l

addition, on September 28, 1988, after the licensee restored electrical power to the valve, the inspector verified control i

l room indication and observed that Valve RC239A was in the

,

16

r-O

.

proper open position.

Further discussions with the compliance supervisor (on October 7, 1988) indicated that the mispositioning of Valve RC239A was due to personnel error.

The licensee has cycled Valve RC239A since the CILRT and determined that there were no problems with the operability of the valve or with control room indication.

The failure to take proper corrective action is a violation of 10 CFR 50, Appendix B, Criterion XVI (50-346/88024-04).

6.

CILRT Test Results Evaluation a.

CILRT Data Evaluation An 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> short duration, CILRT was performed on September 29, 1988, at approximately 52.7 psia following satisfactory completion of the required temperature stabilization period.

Data was collected every 15 minutes.

The inspector independently monitored and evaluated leak rate data using total time (Bechtel Topical Report BN-TOP-1, Revision 1), formulas to verify the licensee's calculations of the leak rate and instrument performance.

There was excellent agreement between the inspector's results as indicated by the following summary (units are in weight percent per day):

Measurement Licensee Mspector Leak rate measured during CILRT (Lam)

-0.008-0.008

~

Lam at upper 95%

confidence level 0.051 0.051 Appendix J acceptance criteria at 95% UCL:

<0.75 La = <0.375 weight percent per day.

b.

Supplemental Test Data Evaluation After the satisfactory completion of the CILRT, a known leakage rate (based on the inspector's independent readings and calculations) of 35 50FM, equivalent to 0.493 weight percent per day at accident pressure was induced.

Data was collected and analyzed by the licensee every 15 minutes.

The inspector independently monitored and evaluated leak rate data to verify the licensee's results.

After 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the supplemental test was terminated with excellent results as indicated by the following summary (unit are in weight percent per day):

Measurement Licensee Inspector Measured leak rate Lc during supplement test 0.457 0.457 Induced leak rate, Lo 0.495 0.493 Lc - (Lo = Lam)

-0.030-0.028

<

s e

.

Appendix J acceptance criteria:

-0.125 < [Lc - (Lot Lam)] < + 0.125, as indicated above, the licensee's test results were satisfactory.

c.

CILRT Valve Lineup Penalties Due to penetration configuration which deviate from the penetration lineup requirement for the CILRT, the results of local leak rate tests for each penetration must be added to Lam at the 95% UCL.

The following penalties must be added using the minimum pathway leakage

)or the following penetrations or possible sources of inleakage.

Leak Rate

Penetration / Equipment iunitsareinSSCM)

CCW Outlet Line from Containment 525 CCW Supply to Containment

CCW Supply to CRDMs

Containment Spray Line 145 Decay Heat Pump Suction Line 350 Containment Vessel Purge Outlet Line

Reactor Coolant Pump Seal Water Return

Electrical Penetrations (P-102)

832 Total = 1,903 SCCM = 0.002 wt. %/ day No violations or deviations were identified.

d.

As-Found Condition of CILRT Results The as-found condition is the condition of the containment at the beginning of the outage prior to any repairs or adjustments (RA's)

to the containment boundary.

If RA's are made to the containment boundary prior to the Type A test, local leak rate tests must be performed to determine the leakage rates before and after the RA's.

The as-found Type A test result can then be obtained by adding the i

difference between the affected leak path leakage before and after RA's to the overall Type A test results.

The inspector reviewed as-found and as-left local leak rate test results to determine an as-found Type A test result.

The licensee is limited to the Appendix J limit of <0.75 La or <0.375 wt %/ day leakage.

The following is a summary of the as-found containment leak rate (units are in wt. %/ day).

Measurement Leak Rate Penalties incurred due to RA's adjustments priar to the CILRT 0.028 Valve lineup penalti9s 0.002 As-left Type A test results 0.051 Total as-found 0.081 The licensee passed the CILRT in the as-found condition.

.

.

7.

Unresolved Items An unresolved item is a matter about which more information is required in order to ascertain whether it is an acceptable item, an open item, a deviation, or a violation.

An unresolved item identified during the inspection is discussed in Section 3.c.

8.

Exit Interview The inspector met with licensee representatives denoted in Paragraph I during the inspection on September 9 and 30, 1988, and at the conclusion of the inspection on October 20, 1988.

The inspectors summarized the scope and findings of the inspection.

The licensee acknowledged the information and did not indicate that any of the information disclosed during the inspection could be considered proprietary in nature.

19

.

.

ATTACHMENT A

.

.

RIII REPORT / LETTER TRAVELLER Total days to issue:

Licensee:

Draft Cocpletion Dates Report No(s):

,

TOLEDO EDISON COMPANY Initial Typing:

Inspection End Date:

Facility (s):

UNIT 1 Received Start End,,,_

DAVIS-BESSE

-

  • Inspector Review:

Inspector (s):

Start End License No(s):

Date Mailed:

NPF-3 Date Receivedt Review Process **

Data Insp/PM S C.

B.C.

D.'D.

Mget. Unit

Doc.

Ferra t In Out in out In Out In Out In ' Out In Out In Out l O 7h)

G

'

sVO

\\\\'

--

!

Issue Date:

s NOTES **

ll/alW HOUP

.

oe, L'icf asee HQ(Df3)

.to.

Commen t

&

h sptdu ftthor ee b feh'N'< In np estlt, 4ff Q

aty Reviev Notii.

,

iss rte stl o< r <N!' l lf I* rfed.e., ces,elefel f J bef,-s Due ceived Written

/

Due Received Wrlb <r t e,-/ tf' d.

Licensee Response:

Due Issued Received Thank You Letter:

~

Due I: sued Torn 591 Applicable?

Yes No Issued From:

Field Office

  • Resident Inspectors Only Al N o Add Addit'ional Reviewers or Notis

{,, j.. '

,

..

-

v.u.weuumumr commai t-.

' g...

-

MSPECTOR,S REPORY n e, ion Aff.4./0f.2

/2

,

,

Omco of inapection and Enforcement pgjg m

.

.

,

'

          • ' ***)7

/JMJM2

4

.

,

'a^g'*a

.o.u n.

.

.,,.ve,u

=a0u

=n =ent t

uCmuw o.

.

wC,, i -

,,,

,,,

,,,

,,

TdbkA f YO~>f f'l '5 G 0 0 3 W &

$ [,2 4f A

'

~

^

w

=. oo.n

,

~

D - DCLtty (

. 04PLAct e

l.} N.I*'.[*D/Al V d ' d ifI s. _. -1.'.s'..J' S d W 9..

Pt100 08 paviltG41C% 'alPICf one pelPICTC4 Plasoawg p 3, Opuweg ATOh (OC4 (8 atGaohi>C COhDUC

_ s-m u,See EW psJe Adew Asgue M ACtlVITY hs0 DAT YA 48Q DAY YR I. Bil'O(41 mal #(CTO4

_] Oteet A Paoes

% I - 8(GC4 AL OFFIC( $1 Af f w m a e.a >

n

RE Xs.

Deviosi D.A W 8-"*'0'"'*8""''*"

O

/

/)l6 d 4 91E /I,O 'dd RIP

.g,,

,c

y 7.,--

-

- - - -

,)

-,,

-,,

,

,

,

,

,

et GCe At Actos, tvrt os Attivit t C0%DvC140 iC%sca ere toe were ICaett ero bos ervyt d 32. $ Apriv 08. WGWT VISIT 10 - PL. ANT SIC 14. la*CM.i'8 7 3 - EIGCaiat 08 8CI LtTige es. g %s oa Clut %t es. vth004

~

it. svVINT.vta

~

it. subtl14ATC%

1-haCFOaw wi 83. hC@thi et. $ttCtat

~

12 - swieuthfiutoat

~

~

-

is. wpoet m. wGut AuDr1 es. wat ACC1 g.g

,

.

--'

.w eg c -

.,r,,.--


.

_ - -

p

.-

,

,

p 5 r( G T sg**.%. L 5 T.s aT C%, f e% >% G b tct A, si. wet a (%s oacgwg%t CO%fla g%CE plPC81 C0%f A'% 2 N ttttle oa agpoet ta A%$w it&L D Af t

*6"W osgojioggAge e.g g e p.r ca w at oei A

e C

D Diw# C95 haC po,nw us a,teo,st st %t g gg g c,o, 1-CWh LtT1ga 15 &VID Attc%

h 3. viouton.

3. OtVLATC%

A

$

C Q

&

S C

D A

B C

D w$

DAT TB WO DA, vs A vostc sDtw o~

gg i. vts 1. vis

)l/.2 l/ pig l

l l

,

,

,

.m

. -

mi.

.. a..

a'.......

L..

.. A.

...

a A,

,

,e

.A

..

.

.

~

wo0vtt miscawatc%

w00sts n.soewatc%

WCDutt at0 80tLCPA V8 M WODVLi ksutt a pige gg wegstg ang settow

"

h,C h600VLi tuult a isil8 Og g S

+8 5= lE s

lI i

lI il' id hm !![,

i l i l[a il

! d mn r li m= i a il u.,n is

"

2'

"

-

u is il

=

.

.,

,

n'f 1:0biddi a

Qa6 i i iIiilm f 5 7,217:oi Il

/ i%g'

i i i liil e

iliil iiil

i ii i i

,

ii i,

iliil ii i i i Iiil (

'

ii i,

iliil ii i i i Ii,!

o

=

i, i i f ( 7:01 ? ion 'A a

Mif i i iliiln f 53i 17v2Ol

i lii Ci,2 a i i i

/

e i,

iliil

-

'

ii i n i

..

,,

li, ili.I c

c i,

i i, i

ii i,

?

i.,

.l..I o

a i

i.

.

ii

,,

'

I,,

? 1,,el u d

-

nw i,

,1,,1, I,,\\~

,,

,,

,

,

,

.

iliiI ii i i i l1 i

'

'

ii i i

,

iliil

>i i i i i

<

'

i i

..

. i li

!iiI

'

a i i i i i

ii i i i

i i

i i i i l !ii iIii!u Iii!"

Ol)i)

'I 7sd i

"

i i i i i n i lii liil

=

.i i,

i li.

iliil

'

i i i.

i i.

,,

___matesq 08_ Div'nAS@h_

g

. 1 1. ld

. i 1 l l 1 0 0

1 lii O teCL8 Ge0Ve**ct 8 l

l

'

    • a RP 05168

-

,.

SALP FUNCTIONAL AREA ASSESSMENT AND PRELIMIRARY INSPECT 0a EVALUATION FORM

,'

.Factitty: Oswis A/m Inspection Report No.:

50-3vC/fsTv.2 V

.

l-FUNCTIONAL AREA 5 l/l1 Il Ill l IV l V Nv l' nit lRati&l l PLANT OPERATIONS l

l l

l L

l l

l~

.

l l

l l

l l

l l

'

'

'

l RADIOLOGICAL CONlROL5 l

l l

l l

l l

l

~

l

l l

l l

l 0l l MINTENANCE l

l l

l l

l l

Pl l-I i

El

-

'

'

'

l 5URVEILLANCE l

M ll Rl I/1 I

n i

ll 11 / l

,

l_

'

Al l FIRE PROTEC110N l

l l

l l

l l

l l

l Tl I-

I I

I l

l l

l l

l Il l EMERGENCY PREPAREDNESS l

l l

l l

l l

l l

l 0l l

1 I

l I

I I

I Nl

'

l 5ECURITY l

l l

l l

l l

l 5l l

l l

l

!I I

I I

I I

l l

l OU1 AGES l

l l

l l

l l

l l

l_l l

I I

I I

i l

l I

l lDUAll1Y PROGRAMS & ADMIN.

l j

l l

l l

l l

l l

l CONTROLS AFFECTING QUALITY l

l I

I l

l l

~l

'

o l LICEN$1NG AC11YlilES l

l l

l l

l i

l

.l

l-

I I

I I

I I

I l

'

l 1RA]NING & QUALIFICA110N l

l l

l l

l l

l l

l_ EFFECTIVENESS I

l l

l l

l l

l l

l SOILS AND F0JNDA110NS l

l l

l l

l l

l l

l

,

l l

l l

l l

l l

l l

Cl l CONTAINMENT, $AFETY-RELATED l

l l

l l

l l

l l

0l l7f>TEG SYSTEMS & SUPPOR15 STRUCTURES & KAJOR STEEL SUPP l

I I

l l

l l

l Nl l

l l

l l

l l

l l

l l

Si i

l i

I I

I I

I I

l Tl

'

l SAFETY-RELATED COMPONENTS l

l l

l l

l l

l l

Rl

,

l_ MECHANICAL

_

l l

l l

l

1 I

I Ul

'

l AUXILIARY SYSTEMS l

l l

l l

l l

.

l Cl l

l l

l l

u l

i Tl l ELECTRICAL EQUIPMENT AND CABLES l

l l

l

I l

l l

Il l

I l

l

!'

l l

l l

Cl llNSTRUMENTA110N l

l l

l l

l l

l NI l

l l

l l

l l

l l

l

  • Functional areas for Construction and Operations CR]TER]A FOR DETERMINING CATEGORY RATING 1.

Management Involvement in Assuring Quality.

2.

Approach to Resolution of Technical Issues from a safety Standpoint.

3.

Responsiveness to NRC Initiatives.

4.

Enforcement History.

5.

Operational and Construction Ever.ts.

6.

Staffing (including management).

RATING KEY:

(For Categories 2 - Declining and 3, provide narrative basis for conclusion)

Category 1 Category 2 - Declining Category 2 Category 3 l3l Inspector (s) concerns adequately addressed or l[l Inspection Evaluation Form being processed.

Lead Inspector [ h k

/O dU/ @ 5ection Chief (Signature)v (Date)

(Signature)

(Date)

Korch 3,_1986

~

UtIIMAMING IILM t.tSr'(UILJ txacKins tuxn

-

'

Enkeltted by:

[ OEG M v Sec. Chkf Approval

-

Item No.

Type Code Func. Area Da*e Entered

~Cj Q$

U

'~pl~~~~~8 2 0 ] y O } (Unit 1)

3f

/Q/ /_2/ ff

~

___/__-__

__ (Unit 2)

Original Inspector Resp. Sec.

Note BE !!DfD- - - - _ - _ - _ - - - -


--

__-

Responsible Inspector C10 sed Final Report I

/

EfdM Z- - - - - - _ - - - - - -


.

.

Interim [Insp. Reports

_____

.

_____

_____

_____

_____

F011owup Date

.

Remarks:

EdLudz Z?_ dffwdInEy EifEd8^' Z?.S1%g.G ^'" EMidij'

t -

1-

-

--

--

2222 E n y. A.t Mc/f V.s 4Ff.r- - - - - - - - - - - - - - - - - _ - - - - - - - - - -

stat s Code

- - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - -.. - - - - - - - - _ -

-

- -

_

____-___________________________--__-----_-__-----

FV8tCT f 0 MAL AREA BEEftem TYPE CODE

-

.

.

M

""

ORDERS TO LICENSEE lAD

AmmOnes. ENVIR. OCC.

Oro AE3

-

-

,FAP

,P,B

'

OTHER

'3 * MAtmTEmamCE ALLEGATIOps OfN ALQ

-

-

,L,

,

10 CFR PART 20 90tLEftN P20

-

$

8

SUL l* EM

-

t0 CFR PART 21 C0eIFIR. ACTISel LTR.

P28 EP CAL

-

-

see P3 6.

SEC/SAF"CWARDS g,,s, p3,a

RECION Ill REQUESTS CenCULAR R3R CIO

-

-

RECOMMENDAftoMS I*

"IAGE8 IIsEF PS3 OEVI Af t0EI R[C SEV

-

=

RECULA10RY IMPROVEMENT PROCRAM CimERIC LETTER RIP CLQ

=

^

-

OL3 REC SAFETY [ VAL. PROGRAM gg IfeetDIATE ACT8088 LETTER SEP 8AL

-

-

SAFETY EVAL REPORT M.

WALITY MN

,e,LF, 3C3

8NFOeWe4YIOde Iso ACE SER 8NF

-

-

9,g 73.71 SArtcuApos REPORTS LectustC EVEast REPORT SCR Lt3

OTHER

-

-

38CastF8 CANT SAFETY FINOffsC seoss-Copert e AseCE ( 1-2-3-4.g 55F 12.

FIRE N /M-R asC

-

-

  • HREC-MILE ISLAND ACTIOct ITEMS 8tWE sIO V80LAT80sf IO CFR 2, TMI

-

verMORAwED ITEMS Attachment I to RP 1201 UesRESOLV APP. C SEC. V.A Uwet

-

eets : ten we

.

e ic.4 ninsin7 e

er.

-

.-........ - -

---

- _ _

___

_ _ _ _

_ __

_

.

m a

'

Sashmitted by: [ MA-Sec. Cht;f Approval

.

y

.

batt Item 380.

Type Code Func. Area Ditered

_3 _#_4 _M_ O_ _2 y

_0_2 (Unit 1)

tj_e/4 0_ g g

_

___/_____

__ (Unitz)

Original Inspector Resp. Sec.

Note 8f_def1_____________

________

___

'

Responsible Inspector Closed Final Report

/_7[ _d )[}_

l

/

f

,

.____

_ _

Icteria[Insp. Reports

_ _ ___

_____

_____

_____

_____

.

Fc11ouwp Date

.

Remarks:

__t

/.

Cenuastyr_ is_oz erie _a_ ys_teg ft_P.otz2 e'6_ f_tgugtece.nr

. v.t z f _ i o _c E _x s 2 _.7.5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -

Status code

__________________________________________________

__________________________________________________

_

,

'

FUsICT f ORAL AREA TYPE CODE

.

EEETI I*

0"""I ' "8 Pip E,PS ORDERS TO LICENSEC 2.

RA0 - CM M Aam0est. ENVIR. OCC.

ORO

.

AEO

-

-

y p p,,

OTHER AtttCATIOle 0T13 3.

MAINTENANCE l

ALO

-

-

,,g g pp,.

10 CFR PART 20

'

SUL SULLETsu P20

S M ILLANCE

-

-

,,,

,,,

to CFR PART 21 CD88F IR. ACTIDII LTR*

P28 i

CAL 5*

N N "C# #"E"

-

-

P3A 6.

SCC /5AFECWAftOS sees, RECION til REQUESIS CanCULAR R3R Cea

-

-

i

,,,

p3, R[CommtNDATIONS OCve Af f 0ss Rtc OEV

-

[**

k

>

-

ISEF PS3 REGULATORY IMPROVEMENT PROGRAM CtaCRIC LETT[R RIP l

GLO

-

-

OLI REC SAFETY EVAL. PROGRAM IpatotATE ACT8088 LETTER SEP

IAL

ICEIOSING

-

-

M SCS SAFETY EVAL. REPORT 10*

QUALITY 'meemanaamrar taropMATIOst 880TICE SER

!

88f

-

-

OPS TSS 73.T1 SAFECUAROS REPORTS II*

UN LectestE EVEasi REPORT SC8t

'

(t2

-

-

f 5 CsestlCANT SAFETY F8100lIIC seose-Cosert AssCE (1-2-3-4-5)

55r sec 12.

FIRE NM

-

-

THREE-MILE 15LAes0 ACTIcet ITEMS eswE a0 vs0LATIOut IS CFR 2, TMt

-

-

Welf1E50LVED ITEMS Attachment I to RP 1201 l

APP. C SEC. V.A Useft

-

---

wl i.n.0.Rmas....

.,e smi,.A gappngpay

,

oeEn ten won eP=

-

-

.

.-

-

,

- _ _ _ _ _ _ _ _ _ _ _ _ _.__

. _ _ _

_ _ _ _ _ _ _ _

____ _ ___ _______

_

__

Se4mitted by: [-@^dy Sec. Cht:f Approval

u

.

IteRi No.

Type Code Func. Area Date Entered

.! SW,/ U dl Y- 0) (Unit 1)

/Jcf O cf

,

---

--

-

,--

~~

--


-

___/_____

__ (Unit 2)

Original Inspector Resp. Sec.

Note AfMO/?

---

w-------------


---

Responsible Inspector Closed Final Report

/lf/l0 6 Z

/

/

-


--

--

--


I terim llesp. Reports

.

_____

_____

_____

_,,, _ _ _

_____

Fc11ouwp Date

.

Remarks:

- - - -

g - - )-

gg y- - - - f /. g9ff - - -

To * lf Afd an A RS f

a s)

L LK4

- - - - - - - - - - - - - - - - - - -

ff f n i 4 ufL

/

/.

--

--

--

. rr _s _Y_ o_ A_l A- -

Ce A/ffL yxu1'- i s o a 7 ' ou ow L t/E


--

-

---

s t.s c 4c

__________________________________________________

-


.--------------.

TYPE CODE

.

FU8ECT10NAL AREA j' """Th*y EPs Pu oRoEas To LICENSEE a===se. Ewv R. occ.

oRo Ata

-

-

FRP Ptf

OTHER ALLEGATIgg OTN ALO

-

3.

me nTEmaseCE ggg pp,

-

10 CFR PART 20 SULLEfte P20 SUL

-

-

"*

    1. '

to CFR PART 21 ComFIR. ACTIORI LTR.

P28 CAL

-

S*

E EP

-

6.

SEC/ SAFE M MPS, P3A RECT 0M 888 REQUESTS CIRCULAR R3R C83

-

-

,,,

p3, RECOMMEmOATIONS DEvf Af f 0st REC DEV

-

-

[**

k 85W PSS REGULATORY IMPROVEMENT PROGRAM CtaERIC LETTER RIP CLQ

-

~

OLT REC SAFETV EVAL. PROGRAM IseetDiATE ACT8038 LETTER SEP IAL

-

9'

ICENSINC

-

M SCS SAFETY EVAL. REPORT suroeMarsons Is0TICE SER ter 10*

OUALITV ASessmasert

-

-

73.71 SAFECUARDS REPORTS LEQ LeCEastE EVENT REPORT SCR

-

yy'

OTHER

-

SIGNIEICANT SAFETY FI8eOtIIC seose-Copert# AasCC ( 1-2-3-4-5 )

SSF sec

-

12*

F8AE pilot /le-R

-

THREE-MILE ISLAseO ACT1088 8TEMS Is0 VIOLATION 10 CFR 2, IMI

-

U80 RESOLVED ITEMS APP. C SEC. Y.A WeNt Attachment I to RP 1201

-

w T.uoRawn.. -..ve e.,te.,g ty/ng/g7

,

oeCuTEm won eee

-

-

... - -..

,

---

__

_ _ _

_ __ ___ _ _ ________

_____

..

_

._

.

.

Sabeltted by: [ bMv-Sec. Chtf Approval

.

()

.

.

Item No.

Type Code Func. Area Date Entered 2_Yf/ _8f0_3f-Qf (Unit 1)

QCf ()f I ~~

/ - '~

--

___/_____

__ (Unit 2)

Original Inspector Resp. Sec.

Note old_of?_____________

____

___

___

'

  • esponsible Inspector Closed Final Report

/_//f _m_) f _2 _ _ _ _ _ _ _ _ _ _ _ _ _

__/__/__

.

-

____

_

Icteria:Insp. Reports

_____

___

_

_____

_____

_____

.

~

rc110=vp Date

.

Remarks:

,

d

[A_.f L _v_f_L_ ff _ _h_7 _L_ lif.gf_ff_ Cuf_4_E_C.7.'t _u_'E_ #_C.7_?d

.

__I I-

_

_. -

_

_

- _ _. - _ _

- - -

- -

- _ _ _ _ _ _

- _ _

_ _

_

_. -

_ -.

Status Code

-

__

_____

_______________

___

________

__

_ _ _

_

-.

_

- - _ _ _ _ _ _ _

_

_ _

_

-. _

-.

FUNCTIONAL AREA TYPE C0of

.

ggggg s

.

8AI EPS Pf7

[**

ORDERS TO LICENSEE Asse0eM. ElfWIR. OCC.

ORO ACO

-

-

FRP Pft OTHER 3.

MAINTtmANCC ALLEGATI0es OTH ALO

-

-

ggg py, 10 CFR PART 20 DutLEftm P2O

SW m LL E C SUL

-

-

,,,

,,,

to CFR PART 21 C0serIR. ACTICII LTR*

P28 S*

E"C"G N #"EP CAL

-

-

6.

SEC/SAFEGGAftOS MPs, P3,A REC 80M III REQUESTS CsRCULAR R3R Ce2

-

-

,,,

p3 R ECo** stas 0AT IONS T.

W tacts seer Pss OtVS Af tost REC DCV

-

-

RECULATORY IMPROVEMENT PROGRAM CINERIC LETTER RIP CLQ

=

8*

OLI RfC

-

,

SAFETY EVAL. PROGRAM spoetDIATE ACTIOes LETTER 5[F IAL

-

C

"

8E8

-

SAFETY EVAL. REPORT 3efom4AT80s IIOTICE SER OU4LBTV AS9ustANCE sur

-

10, '

-

TM 73.71 SAFECUARDS REPOftTS LectmSEC EVENT REPORT SCR LEO saCasIFICAssT SAFETV F leo 8NG q '*

Of,,tetR

-

y

-

seces-CosePL AasCE (1-2-3-4-5)

s5r mc 7 g gy

,

-

-

THetCC-MILE SSLAseO ACTeoss ITEtes ad se0 V80LAT80e8 10 CTR 2, TMS

-

-

wein0 raw O ITEMS Attachment I to RP 1201 UseRESOLVE APP. C SEC. V.A Weset

-

oets : ten woes era

-

,4. a urnasm7

-

.

-

- - ---.-...... -

_

_

-

.

- -

--

.

.-

__