Forwards Insp Rept 50-346/99-02 on 990202-05.No Violations Noted.Examples of Deficiencies with Station Procedures, Similar to Those Identified Through Staff self-assessments & in Previous NRC Insps,Were Noted
ML20207D435
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/25/1999
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Campbell G
CENTERIOR ENERGY
Shared Package
ML20207D439 List:
References
50-346-99-02, 50-346-99-2, NUDOCS 9903090353
Download: ML20207D435 (3)


See also: IR 05000346/1999002

Text

.-

(

i

  • ;

.

February 25, 1999 '

.  :

Mr. Guy G. Campbell

-

' Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Jervice Company .

5501 North State Route 2  !

Oak Harbor, OH 43449 <

,

f .

SUBJECT: NRC RADIATION PROTECTION INSPECTION REPORT 50-346/99002(DRS)

Dear Mr. Campbell:

l

'

,

On February 5,1999, the NRC completed a routine inspection at your Davis-Besse Nuclear

Power Station.' The enclosed report summarizes the results of this inspection.

I

The inspection was an examination of activities conducted under your license as they relate to

radiation safety and to compliance with the Commission's rules and regulations and with tne

conditions of your hense. The inspection consisted of a selective examination of procedures 1

and representative records, observations, and interviews with personnel. Specifically, this i

' inspection focused on aspects of your operational chemistry program inciuding maintenance of I

primary and secondary water cherr'istry, chemistry instrument quality control, laboratory

. l

sam"ang and analysis, and programs for controlling extemal and internal exposure. An "at- l

po sar" containment entry by your staff to clean the containment air cooler fans was also )

re/iewed.

No violations of NRC requirements were identified during this inspection. Overall, programs )

reviewed were well implemented, in particular, wo observed excellent maintenanca and storage

of respiratory protection equipment and that consetvative, well thought out actions were taken to

address steam generator conosion concems resulting from the June 1998 resin intrusion ,

incident. However, we noted some examples of deficiencies with station procedures, similar to l

those identified through your_ staffs'self-assessments and in previous NRC inspections. Our

review concluded that your staff was taking appropriate action to correct these deficiencies.

In accordance with .10 CFR 2.7b0 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

.

\

l

9903090353 990225  !

PDR ADOCK 05000346  !

'

O PDR a

_

_ . _ . . . _ . _ - _ . _ _ __. ._ . . . _

.

4

J. Wood -2- I

We will gladly discuss any questions you have conceming this inspection.

Sincerely,

!

Gary L. Shear, Chief ' 1

Plant Support Branch 2

)

Docket No.: 50-346

License No.: NPF-3 1

1

Enclosure: inspection Report 50-346/99002(DRS)

l

cc w/ encl: J. Stetz, Senior Vice President - Nuclear  !

J. Lash, Plant Manager ,

J. Freels, Manager, Regulatory Affairs i

M. O'Reilly, First Energy i

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health j

i

. C. Glazer, State of Ohio Public '

Utilities Commission

Distr [g m

RPC (tMmb

Prow 4/g NRR w/enci

J. Caldwi Alli w/enci

B. Clayton, Rlli w/enci i

SRI Davis-Besse w/enci

DRP w/ encl

TSS w/enci  ;

'

, DRS (2) w/ enc'

l R1il PRR w/enci i

! ' PUGLIC IE-01 w/enci

Docket File w/enct

GREENS

  • -

i LEO (E-Mail)

DOCDESK.'?-Mali)

DOCUMENT NAME: G:DRS\DAV99002.WPD

v. w.. w.. ,* . e.co .n -o r.c - . - e.-wo v.we.  ;

OFFICE Rlll AQ l f. Rlli 16 Rlli ltd l' j

NAME Slawins'ki/ Shah jp Shear SL6 KozakA-tL  !

DATE 02/#/99 02/2)/99 02/2/$99' ' ,_

OFFICIAL RECORD COPY

i

L l

. . ~ - . . . . - . . -.- - ~.-.. .. .. -.-..-. .-.. . . . . - - . - - . - - . _ -

<

.

>

'

L

'

p

I:

1

G. Campbell -2- ,

!

,

.

' We will gladly discuss any questions you have conceming this inspection. i

Sincerely,  ;

..

'

' original /s/ Gary L. Shear 7

' Gary L. Shear, Chief (

Plant Support Branch 2

!

Docket No.: 50-346 -

. License No.: NPF-3

L

Enclosure: Inspection Report 50-346/99002(DRS): -

cc w/ encl: J. Stetz, Senior Vice President - Nuclear  :

- J. Lash, Plant Manager >

J. Freels, Manager, Regulatory Affairs .

'

! M.- O'Reilly, First Energy

' State Liaison Officer, State of Ohio  ;

'

,. R. Owen, Ohio Department of Health

l C. Glazer, State of Ohio Public ,

! Utilities Commission >

l

l

Distribution:

l RPC (E-Mail)'

Project Mgr., NRR w/enci-

[ 'J. Caldwell, Rlli w/enci -

! B. Clayton, Rlll w/ encl

f' SRI Davis-Besse w/ encl

DRP w/enci .

TSS w/enci-

l- DRS (2) w/enci

p

.

'

~ Rlli PRR w/e el

g",PUBLIC M,-

Docket Fi

GREENS

nci

/

'

IEO TE-Mail) . .

0000*9e*

DOCDESK (E-Mail) _.

i- DOCUMENT NAME: . G:DRS\DAV99002.WPD *SEE PREVIOUS CONCURRENCE

t- r. . ,., wi = = c.c - u 2 . r.co . - y - . <. em ,

OFFICE Rlli y- l Rlli .p Rlli w- l l

NAME Slawinski/ Shah:Jp/sd Shear- Kozak

qDATE 02/-/99 02/ /99 02/ /99

i OFFICIAL RECORD COPY.

,

p 3

. .

a

n - ,wJ. + 4 e. .( --a-4, a

t