May 14, 2021

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - INTEGRATED INSPECTION REPORT 05000346/2021001

Dear Mr. Brown:

On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station. On April 30, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects

Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2021001

Enterprise Identifier: I-2021-001-0028

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

January 01, 2021 to March 31, 2021

Inspectors:

J. Cassidy, Senior Health Physicist

D. Mills, Senior Resident Inspector

J. Park, Reactor Inspector

Approved By:

Billy C. Dickson, Jr., Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000346/2020-001-00 LER 2020-001-00 for Davis-Besse Nuclear Power Station, Unit 1, Three Main Steam Safety Valves Failed Inservice Test Program As-Found Lift Acceptance Criteria.

71153 Closed LER 05000346/2020-001-01 LER 2020-001-01 for Davis-Besse Nuclear Power Station, Unit 1, Three Main Steam Safety Valves Failed Inservice Test Program As-Found Lift Acceptance Criteria 71153 Closed

PLANT STATUS

The unit operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19),resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Core spray train 1 during the week ending March 31, 2021
(2) Motor driven feedwater pump during the week ending March 31, 2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Electrical penetration room 2 (room 427), fire area DF, during the week ending February 27, 2021
(2) Component cooling water pump and heat exchanger room (room 328), fire area T, during the week ending March 13, 2021
(3) High voltage switchgear room BD (room 323), fire area Q, during the week ending March 13, 2021
(4) Emergency core cooling system pump room 1 (room 105), fire area AB, during the week ending March 27, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) Shift turnovers and various control manipulations during the inspection period

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operator performance during integrated drills on February 23, 2021, and March 30, 2021.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Emergency feedwater pump unavailable due to bad battery during the week ending February 13, 2021
(2) Frazil ice formation at intake crib during the week ending February 13, 2021
(3) Startup transformer 01 scheduled outage for preventive maintenance during the week ending March 6, 2021
(4) At power containment entry for instrument calibration during the week ending March 6, 2021
(5) Borated water storage tank scheduled maintenance during the week ending March 27, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR 2021-00610, SW382 service water supply to auxiliary feedwater pump 1 stroke time outside of expected range during the week ending March 6, 2021
(2) CR 2021-00236, Emergency feedwater pump diesel engine start battery did not meet acceptance criteria on specific gravity during the week ending January 16, 2021
(3) CR 2020-09724, Component cooling water pump 1 bearing oil leakage during the week ending January 9, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Component cooling water pump 1 following scheduled maintenance during the week ending January 9, 2021
(2) Safety features actuation system channel 4 functional following power supply and bi-stable replacement during the week ending February 20, 2021
(3) Auxiliary feedwater pump 1 following planned maintenance during the week ending February 27, 2021
(4) Containment spray train 1 following planned maintenance during the week ending March 27, 2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Electrohydraulic power unit test during the week ending January 30, 2021
(2) Anticipatory reactor trip system channel 2 interchannel logic during the week ending February 13, 2021
(3) Containment spray train 2 quarterly test during the week ending February 13, 2021
(4) Safety features actuation channel 1 output logic during the week ending February 27, 2021

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Containment hatch seal following containment entry during the week ending March 6, 2021

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)

The inspectors evaluated:

(1) Integrated drill on February 23, 2021
(2) Integrated drill on March 30,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazards Control and Work Coverage (IP Section 03.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) Shepherd Model 89 calibrator repair under RWP 121-1048. This work involved high activity sources and significant dose gradients.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to external dosimetry that is used to assign occupational dose.

Internal Dosimetry (IP Section 03.03) (2 Samples)

The inspectors evaluated the internal dosimetry program implementation.

(1) Investigational Bioassay Data Sheet; Plant ID 19981; March 12, 2020 at 1345
(2) Investigational Bioassay Data Sheet; Plant ID 33012; March 18, 2020 at 1445

Special Dosimetric Situations (IP Section 03.04) (2 Samples)

The inspectors evaluated the following special dosimetric situation:

(1) Dose assessment for a declared pregnant worker in 2020
(2) Skin Dose Assessment; Plant ID 19981; March 12, 2020 at

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01)===

(1) January 1, 2020 through December 31, 2020

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02) (1 Sample)

(1) January 1, 2020 through December 31, 2020

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (1 Sample)

(1) January 1, 2020 through December 31, 2020

===71153 - Follow-up of Events and Notices of Enforcement Discretion

Event Report (IP Section 03.02)===

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 2020-001-00 and LER 2020-001-01, Three Main Steam Safety Valves Failed Inservice Test Program As-Found Lift Acceptance Criteria, ADAMS Accession No.

ML20171A496. The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensee's ability to foresee and correct and therefore no performance deficiency was identified. The inspectors did not identify a violation of NRC requirements. LER 2020-001-00 and LER 2020-001-01 are closed.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 30, 2021, the inspectors presented the integrated inspection results to Mr. T. Brown, Site Vice President, and other members of the licensee staff.
  • On February 24, 2021, the inspectors presented the radiation protection inspection results to Mr. G. Nordlund, Radiation Protection Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Procedures

DB-OP-06013

Containment Spray System

DB-SS-03090

Motor Driven Feed Pump Monthly Valve Verification

Work Orders

200846444

PMT for Repairs Made to LTRC 14-1

03/03/2021

71111.05

Fire Plans

PFP-AB-105

Protected Area Pre-Fire Plan, ECCS Pump Room 1-1

PFP-AB-323

High Voltage Switchgear Room B

PFP-AB-328

Component Cooling Water Heat Exchanger and Pump Room

PFP-AB-427

Protected Area Pre-Fire Plan, No. 2 Electrical Penetration

71111.13

Corrective Action

Documents

21-00764

Current Plant Parameters Indicate Frazil Ice Conditions Exist

03/08/2021

21-01313

WW20210215 - Generation Risk Work not Properly Managed

IAW NOP-OP-1007, Risk Management

2/26/2021

Procedures

DBBP-OPS-003

Online Risk Management Process

NOP-OP-1007

Risk Management Plan

71111.15

Corrective Action

Documents

20-06101

CCW HX 1 Leakage

08/01/2020

20-09625

Revision to POD 2018-7014, CCW Oil Leakage

2/21/2020

20-09653

CCW Pump 1 Pump Inboard Bearing Oil Addition Trend,

Brass Dust

2/23/2020

20-09724

CCW Pump 1 I/B Bearing Leakage

2/28/2020

21-00124

CCW Pump 1 As-Found Oil Leakage Description

01/07/2021

21-00236

EFWP Diesel Engine Start Battery did not Meet Acceptance

Criteria on Specific Gravity

01/13/2021

21-00510

P43-1 CCW Pump 1 Pump Outboard Small Water Droplets

Flinging from Shaft

01/27/2021

21-00713

T097, CC Pump O/B BRG OT in Alarm with a Quality Code

of OTC (Open Thermocouple)

2/04/2021

21-00832

EFWP Battery Low Specific Gravity

2/09/2021

21-00868

EFW Diesel Battery Charger DBCK310 Output Fuse Blown

2/10/2021

21-00931

CCW Pump 1 Pump Outboard Oil Low

2/12/2021

21-00986

Minor Flange Leak on CCW Heat Exchanger 1

2/15/2021

21-01725

Trending: CCW Pump P43-1 Oil Analysis Outboard

03/11/2021

71111.19

Corrective Action

Documents

21-01214

AFW Train 1 Vibration Panel in Alarm

2/23/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Work Orders

200781328

SFAS Channel 4 Functional Test

2/18/2021

200781776

AFP 1 Quarterly Test

2/23/2021

200783850

FWD Flow Train 1 Quarterly Pump and Valve Test

03/22/2021

71111.22

Procedures

DB-PF-03291

Containment Personnel and Emergency Airlocks Seal

Leakage Test

DB-SP-03338

Containment Spray Train 2 Quarterly Pump and Valve Test

Work Orders

200777413

EHC Hydraulic Power Test

01/29/2021

200781358

ARTS Channel 2 Interchannel Logic

2/12/2021

2007869

SFAS Output Logic Test for Actuation Channel 1

2/22/2021

71114.06

Corrective Action

Documents

21-00084

Telecommunication T1 Lines not Functioning for Lindsey

Emergency Response Facility

01/06/2021

21-01242

EP Drill: E-Plan Drill Objective C.7 not Met due to Failing to

Communicate Entire Protection Action Recommendation

2/24/2021

21-01253

EP Drill: EOF Controller Interject for State and County

Communicator

2/24/2021

21-01255

EP Drill: Simulator Data was not being Received by the Joint

Information Center

2/24/2021

21-01261

EP Drill: Controller Interject for Emergency Diesel Generator

Automatic Start

2/24/2021

21-01263

EP Drill: Controller Interject for Radiation Monitoring Team

Data

2/24/2021

21-01266

EP Drill: Plant Status Board in Operations Support Center did

not Update with Drill Data During 02/23/21 Integrated Drill

2/24/2021

21-01292

EP Drill: One of the Dose Assessors' Computers was Unable

to Print

2/25/2021

21-01297

EP Drill: Failed Drill Objective F.6 due to Challenges in Dose

Assessment

2/25/2021

21-01335

Improper Categorization of E Drill Condition Reports

2/26/2021

21-01649

Performance Assessment Elevation: Emergency Response

Organization (ERO) Call-In Test/Drill Performance

03/09/2021

21-02422

EP Drill: Correct Release Path not Identified During ERO Drill 03/31/2021

21-02423

EP Drill: Safety Concern RMT Vehicle 6933

03/31/2021

21-02427

EP Drill: Initial Notification EAL Numbering Inaccuracy

03/31/2021

21-02444

EP Drill: Plant Status Display Board Radial Button Issue

04/01/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

21-02446

EP Drill: Core Thermo-Hydraulic Engineer EP Workstation

Issues

04/01/2021

21-02451

EP Drill: Failed Drill Objective F.8 Communications

Regarding Core Damage

04/01/2021

21-02489

EP Drill: Station Vent Radiation Monitor Simulator Data did

not Function on E-Data for State

04/02/2021

71124.01

ALARA Plans

21-1048

Repair of the Gamma Irradiator Shepherd Model 89

71124.04

Calculations

Order 200686403

DB-HP-04344, Source Term Determination

08/07/2019

Radiation

Protection 2020-

Basis for Electronic Alarming Dosimeters (DMC 300) in

Relation to Genesis Ultra Type 36 Thermoluminescent

Dosimeters

Corrective Action

Documents

CR-2019-10187

Vendor Supplied Thermoluminescent Dosimetry Results

2/06/2019

CR-2020-07101

Alpha Level 3 Contamination Found Inside RCS Piping

09/10/2020

CR-2020-08564

Failure to Log-On RWP and Obtain Dosimetry

11/04/2020

Miscellaneous

Intra-Company

Memorandum

Prospective Determination of the Need for Internal Dose

Monitoring - 2021

2/31/2020

Intra-Company

Memorandum

  1. 21-009

Prospective Determination of the Need for External Dose

Monitoring - 2021

2/22/2021

NOP-OP-4205-01

Plant ID 14293 /

25579 11/4/2020

Dosimetry Investigation/Dose Assessment

11/04/2020

NVLAP Lab

Code: 100555-0

Certificate of Accreditation to ISO/IEC 17025:2017; Mirion

Technologies (GDS), Inc.

07/01/2020

Procedures

NOP-OP-4202

Declared Pregnant Workers

NOP-OP-4205

Dose Assessment

NOP-OP-4206

Bioassay Program

08/28/2018

Radiation

Surveys

DB-M-20200312-

Rx Head Stand Pre-O-Ring Install

03/12/2020

71152

Corrective Action

Documents

2019-03951

System Monitoring of Main Transformer Serveron Trends

Identified Unexpected Oxygen Level Increase

04/29/2019

20-09423

Main Transformer Serveron Indicated Increased Fault

Gassing

2/14/2020

20-09461

Boric Acid Addition Tank Iron Membrane Filter has Metal

2/15/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Shavings on it

20-09473

Oil Leak from Startup 02 Transformer

2/15/2020

20-09507

Main Transformer: NEIL Adverse Condition Limit for

Acetylene Exceeded

2/16/2020

20-09549

Cannot Perform DB-OP-03011 as Written

2/17/2020

20-09609

Annunciator 1-2-I, Transformer DF1-2 Fault Came into Alarm

and Cleared. No Computer Point was Received

2/20/2020

20-09687

LPFW Heater 1-1 Trip

2/26/2020

20-09702

SI10925, Diesel Fire Pump Speed Indicator, Failed PMT

2/27/2020

20-09703

Clerical Error Found in Db-SS-04201 EFWP Quarterly Test

Procedure

2/27/2020

20-09704

EF7 Valve Operator Bolts are Loose

2/27/2020

20-09705

EF16 Valve Operator Bolts are Loose

2/27/2020

20-09714

Local Green Open Indicating Light on ABDC1 is Out

2/28/2020

20-09746

16-4-C MN Transformer 1 Trouble Multiple Times with no

Local Alarms

2/29/2020

20-09746

16-4-C MN XFMR 1 Trouble Multiple Times with no Local

Alarms

2/29/2020

20-09755

Maintenance Rule Program Missed Condition Monitoring

Failure CR in Periodic Assessment Cycle 21

2/30/2020

20-09762

DAAS Computer Continuously Rebooting

2/31/2020

21-00044

Numerous Phone Lines for Control Room and Security Out

of Service

01/04/2021

21-00049

Unexpected 16-4-C, MN Transformer 1 Trouble, Annunciator

Received in the Control Room

01/05/2021

21-00347

Service Water Piping not Insulated and not Coated

01/20/2021

21-00553

ECCS Sump 1A is not Starting

01/28/2021

21-00624

Service Water Valve Room Pump B not Pumping

2/01/2021

21-00916

X02 Transformer Liquid Level Almost as Low Mark

2/12/2021

21-00952

HIS RC7 Reactor Coolant Tave Unable to Select 'Y'

Instrument

2/14/2021

21-01290

Blockwall 5337 Crack Growth

2/25/2021

21-01334

Degraded Cabinet Ground Strap Lug

2/26/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

21-01486

Davis-Besse Outgoing Phone Issues

03/04/2021

21-01502

EDG 1 High Jacket Water Level While Running

03/04/2021

21-01627

Increase in Differential Pressure Across Main Condenser

Waterboxes

03/08/2021

21-01683

SBP DG Battery Charger Volts DC Reading High

03/10/2021

21-02208

Continued Low Margin on SW Flow to Train 2 CREVS

03/25/2021

21-02350

Sink Hole in Owner Controlled Area

03/29/2021

Miscellaneous

ODMI 20-13

Monitoring the Main Transformer

Serveron 1 4

Gas in Oil for Main Transformer

Serveron 12 21 A

& 12 21 B

Gas in Oil for Main Transformer

TM8001041

Gas in Oil for Main Transformer

71153

Corrective Action

Documents

CR-2020-01532

Main Steam Safety Valves Failed ASME Code As-Found Lift

Acceptance Criteria - DB-PF-03001 Step 5.1.3

2/26/2020

Procedures

DB-PF-03001

Main Steam Safety Valve Setpoint Test

Work Orders

200766405

Main Steam Line 2 Code Safety

2/24/2020

200768408

PM 5554 SP17A1 Test MSSV's

05/09/2020