9 4

ER f

Q" Davis-Besse Nudeer Power Station 5501 North State Route 2 m

Oak Harbor, Ohio 43449-9760 Quy C. Campbell 41 % 21-8588 Vice President Nuclear Fax:41 M 214337 Docket Number 50-346 License Number NPF-3 SerialNumber 2616 August 25, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Semiannual Fitness-For-Duty Report, January - June,1999 Ladies and Gentlemen:

Pursuant to 10 CFR 26.71(d),"Recordkeeping Requirements," Toledo Edison submits its semiannual Fitness-For-Duty (FFD) report for the period of January through June 1999, for the Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.

l Should you have any questions or require additional information, please contact Mr. James L.

i Freels, Manager - Regulatory Affairs, at (419) 321-8466.

Sincerely, i

3 Guy G. Campbell Vice President - Nuclear SAN /s Attachments cc:

S. N. Bailey, NRC Project Manager O

J. E. Dyer, Regional Administrator, NRC Region III

/

K. S. Zellers, DB-1 Senior Resident Inspector Utility Radiological Safety Board R

I

~

D6cket Number 50-346 License Number NPF-3 Seiial Number 2616

, Attachment 1 Toledo Edison Fitness-For-Duty Report January-June 1999

i

.Dockrt Number 50-346 Lic:ns3 Numb:r NPF - 3 Serial Number 2616 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 i

l Toledo Edison June 30.1999 Company 6 Months Ending Davis-Besse (419) 321-8466 Location Phone J. L. Freels. Manaaer - Reaulatorv Affairs i

Contact Name Cutoffs: Screen / Confirmation (na/ml)

Accendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 782 0

131 Categories Tested Positive Tested Positive Tested Positive Pre-Access 41 0

150 2

Post Accident 0

0 0

0 Observed Behavior 4

0 0

0 Random 201 0

23 0

Follow-up 3

0 11 0

Other 12 0

0 0

Total 261 0

184 1/2*

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines clidine to test Licensee Employees 0

0 0

0 0

0 0

Long-Term Contractors 0

0 0

0 0

0 0

Short-Term Contractors 2

0 0

0 0

0 0

Total 2

0 0

0 0

0 0

2

  • Indicates results according to NRC policy for cutoff levels on the left side and Company policy on the right.

l

' Docket Nu' ber 50-346 m

Lic:nse Number NPF-3 SerialNumber 2616 TOLEDO EDISON MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY j

Toledo Edison Contractor Personnel Personnel Referred to EAP 0

0 Management Sanctions 0

2 Toledo Edison does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.

TOLEDO EDISON FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (January - June 1999).

Docket Number 50-346 License Number NPF-3 Serial Number 2616 Attachment COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs (419-321-8466) at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A l

(