& tober 28, 1998 Mr. John K. Wood i
Vice President - Nuclear, Davis-Besse Centerior Service Company c/o Toledo Edison Company L
Davis-Besse Nuclear Power Station i
5501 North State Route 2 Oak Harbor, OH 43449-9760 i
SUBJECT:
REQUEST FOR REDUCTION IN COMMITMENT CHANGES IN THE QUALITY ASSURANCE PROGRAM MATERIAL RECEIPT INSPECTION PROCESS - RESULTS OF STAFF REVIEW, DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1
.(TAC N0. MA3468)
Dear Mr. Wood:
i By letter dated August 24 1998, you proposed changes to the Davis-Besse Nuclear Power Station, Unit No.1, Updated Safety Analysis Report, Chapter 17.2, " Quality Assurance During the Operations Phase." The proposed j
changes transfer most material receipt inspection functions from the Nuclear Assurance Department's Nuclear Safety and Inspection Section to the Engineering and Services Department's Design Basis Engineering Section.
The staff has determined that the reductions in commitment are acceptable.
The enclosed Safety Evaluation provides the assessment of the requested changes.
Sincerely, Original signed by:
Allen G. Hansen, Project Manager Project Directorate III-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc:
See next page DISTRIBUTION:
Docket File PUBLIC PD32 r/f EGAl SRichards Stampbell, Region 3
/
HQMB OGC
/
ACRS GGrant, Region 3 DOCUMENT NAME:
G:\\DAVISBES\\DBA3468.LTR O(
OFFICE LA:PD32 Gl PM:PD32 k-y
/
NAME EBarr ' 11 QW AHansen #/
st DATE
{o/$
5
/ohv[v/
OFFICIAL RECORD COPY h"- g} h' h 9010300227 98102s g,7p[h
$DR ADOCK 0500 6
s
&tober 28,19%
h Mr. John K. Wood 4
Vice President - Nuclear, Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
REQUEST FOR REDUCTION IN COMMITMENT CHANGES IN THE QUALITY ASSURANCE PROGRAM MATERIAL RECEIPT INSPECTION PROCESS - RESULTS OF STAFF REVIEW, DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 (TAC NO. MA3468)
Dear Mr. Wood:
By letter dated August 24 1998, you proposed changes to the Davis-Besse Nuclear Power Station, Unit No. 1 Updated Safety Analysis Report, Chapter 17.2, " Quality Assurance During the Operations Phase." The proposed changes transfer most material receipt inspection functions from the Nuclear Assurance Department's Nuclear Safety and Inspection Section to the Engineering and Services Department's Design Basis Engineering Section.
The staff has determined that the reductions in commitment are acceptable. The enclosed Safety Evaluation provides the assessment of the requested changes.
Sincerely, origimi signed by:
Allen G. Hansen, Project Manager Project Directorate III-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc:
See next page DISTRIBUTION:
Docket File PUBLIC PD31 r/f EGAl SRichards SCampbell, Region 3 HQMB OGC ACRS GGrant, Region 3 DOCUMENT NAME:
G:\\DAVISBESiDBA3468.LTR OFFICE LA:PD32 f4 PM:PD32 r
NAME EBarnhillQPf AHansen M st DATE lo/;d/Q%
/chvfi/
OFFICIAL RECORD COPY i
~
p erev g
UNITED STATES j
NUCLEAR REGULATORY COMMISSION
,,%'...../g WASHINGTON, D.C. 2tM*WM)01 (htober 28,1998 Mr. John K. Wood Vice President - Nuclear, Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
REQUEST FOR REDUCTION IN COMMITHENT CHANGES IN THE QUALITY ASSURANCE PROGRAM MATERIAL RECEIPT INSPECTION PROCESS - RESULTS OF STAFF REVIEW, DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 (TAC NO. MA3468)
Dear Mr. Wood:
By letter dated August 24 1998, you proposed changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Updated Safety Analysis Report, Chapter 17.2, " Quality Assurance During the Operations Phase." The proposed changes transfer most material receipt inspection functions from the Nuclear Assurance Department's Nuclear Safety and Inspection Section to the Engineering and Services Department's Design Basis Engineering Section. The staff has determined that the reductions in commitment are acceptable. The enclosed Safety Evaluation provides the assessment of the requested changes.
Sincerely, Allen G. Hansen, Project Manager Project Directorate III-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc:
See next page l
I l
j
T John K. Wood Davis Besse Nuclear Power Station, Unit 1 Toledo Edison Company cc:
Mary E. O'Reilly Robert E. Owen, Chief FirstEnergy Bureau of Radiological Health Davis-Besse Nuclear Power Station Service 5501 North State - Route 2 Ohio Department of Health Oak Harbor, OH 43449-9760 P.O. Box 118 Columbus, OH 43266-0118 James L. Freels Manager-Regulatory Affairs Toledo Edison Company James R. Williams, Chief of Staff Davis-Besse Nuclear Power Station Ohio Emergency Management Agency 5501 North State - Route 2 2855 West Dublin Granville Road Oak Harbor, OH 43449-9760 Columbus, OH 43235-2?N Jay E. Silberg, Esq.
Donna Owens, Directc Shaw, Pittman, Potts Ohio Department of Ccmmerce and Trowbridge Division of Industrial Compliance 2300 N Street, NW.
Bureau of Operations & Maintenance Washington, DC 20037 6606 Tussing Road P.O. Box 4009 Regional Administrator Reynoldsburg, OH 43068-9009 U.S. Nuclear Regulatory Commission 801 Warrenville Road Ohio Environmental Protection Agency Lisle, IL 60523-4351 DERR-Compliance Unit ATTN: Zack A. Clayton Robert B. Borsum P.O. Box 1049 Babcock & Wilcox Columbus, OH 43266-0149 Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 State of Ohio Rockville, MD 20852 Public Utilities Commission 180 East Broad Street Resident inspector Columbus, OH 43266-0573 U.S. Nuclear Regulatory Commission 5503 North State Route 2 Attorney General Oak Harbor, OH 43449 Department of Attorney 30 East Broad Street James H. Lash, Plant Manager Columbus, OH 43216 Toledo Edison Company Davis-Besse Nuclear Power Station President, Board of County 5501 North State Route 2 Commissioners of Ottawa County Oak Harbor, OH 43449-9760 Port Clinton, OH 43252