Category:INSPECTION REPORT
MONTHYEARIR 05000346/19990171999-10-26026 October 1999 Insp Rept 50-346/99-17 on 990928-1001.No Violations Noted. Major Areas Inspected:Implementation of Licensee Protected Area Ingress Search Program,Maint Support for Security Sys, Alarms Stations & Communications & QA IR 05000346/19990101999-10-0808 October 1999 Insp Rept 50-346/99-10 on 990802-0913.One NCV Occurred. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19990091999-08-20020 August 1999 Insp Rept 50-346/99-09 on 990623-0802.Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000346/19990151999-08-0909 August 1999 Insp Rept 50-346/99-15 on 990712-16.No Violations Noted. Major Areas Inspected:Effectiveness of Licensee Program for Mgt of Solid Waste,Transportation of Radioactive Matl & Radwaste & Radiological Environ Monitoring IR 05000346/19990081999-07-20020 July 1999 Insp Rept 50-346/99-08 on 990513-0628.Three Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19990041999-06-0707 June 1999 Insp Rept 50-346/99-04 on 990323-0513.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207G0691999-06-0404 June 1999 Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513. Violations Identified with Pending Licensee Response.Major Areas Inspected:Review of Licensee Maint Activities Associated with Pressurizer Spray Valve RC-2 IR 05000346/19990051999-04-27027 April 1999 Insp Rept 50-346/99-05 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee on-line Maint Risk Assessment Program IR 05000346/19990011999-03-0505 March 1999 Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19990021999-02-25025 February 1999 Insp Rept 50-346/99-02 on 990202-05.No Violations Noted. Major Areas Inspected:Aspects of Licensee Program for Controlling Operational Chemistry & External & Internal Exposures IR 05000346/19980181999-01-22022 January 1999 Insp Rept 50-346/98-18 on 981110-990102.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000346/19980201998-12-17017 December 1998 Insp Rept 50-346/98-20 on 981116-20.No Violations Noted. Major Areas Inspected:Review of Licensee Licensed Operator Requalification Training Program IR 05000346/19980171998-12-0909 December 1998 Insp Rept 50-346/98-17 on 980918-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980191998-11-20020 November 1998 Insp Rept 50-346/98-19 on 981014-23.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980151998-10-16016 October 1998 Insp Rept 50-346/98-15 on 980914-18.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program IR 05000346/19980141998-10-14014 October 1998 Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980161998-09-30030 September 1998 Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted. Major Areas Inspected:Plant Support IR 05000346/19980111998-09-0909 September 1998 Revised Pages 15 & 18 to Insp Rept 50-346/98-11,correcting Number Given for Unresolved Item 50-346/95009-02.Number Should Read 50-346/96002-09 ML20151T0071998-09-0303 September 1998 Insp Rept 50-346/98-11 on 980803-14.No Violations Noted. Major Areas Inspected:Effectiveness of Corrective Action Program IR 05000346/19980131998-08-25025 August 1998 Insp Rept 50-346/98-13 on 980623-0807.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980121998-08-14014 August 1998 Insp Rept 50-346/98-12 on 980624-29.No Violations Noted. Major Areas Inspected:Review of Licensee Response & Recovery from Damage Caused by 980624 Tornado,Operations & Plant Support IR 05000346/19980091998-07-28028 July 1998 Insp Rept 50-346/98-09 on 980512-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236G9431998-06-30030 June 1998 Insp Rept 50-346/98-08 on 980526-0617.Violations Noted.Major Areas Inspected:Licensee Performance Re Physical Security ML20236F2201998-06-27027 June 1998 Insp Rept 50-346/98-10 on 980608-11.Violation Noted. Major Areas Inspected:Solid Radwaste Mgt & Transportation Program,Radiological Effluent Monitoring & Control Program & Maint Program for Station Emergency IR 05000346/19980051998-06-11011 June 1998 Insp Rept 50-346/98-05 on 980401-0512.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980061998-06-0909 June 1998 Insp Rept 50-346/98-06 on 980422-0507.Violations Noted. Major Areas Inspected:Aspects of Licensee Code Repairs of MSIV & Nondestructive Exam of Control Rod Drive Housing & Main Steam Nozzle & Decay Heat Sys Welds IR 05000346/19980071998-05-26026 May 1998 Insp Rept 50-346/98-07 on 980427-30.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Eleventh Refueling Outage & Review of Radiation Worker Practices & Recent Events Including Resin Breakthrough IR 05000346/19980041998-04-10010 April 1998 Insp Rept 50-346/98-04 on 980218-0331.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216D8861998-03-10010 March 1998 Insp Rept 50-346/98-02 on 980108-0218.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980031998-03-10010 March 1998 Insp Rept 50-346/98-03 on 980223-26.No Violations Noted. Major Areas Inspected:Engineering IR 05000346/19970151998-01-28028 January 1998 Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970131997-11-21021 November 1997 Insp Rept 50-346/97-13 on 970929-1110.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970141997-11-10010 November 1997 Insp Rept 50-346/97-14 on 971021-23.No Violations Noted. Major Areas Inspected:Maint IR 05000346/19970121997-11-0404 November 1997 Insp Rept 50-346/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Review of Radiation Protection & Chemistry Programs IR 05000346/19970111997-10-31031 October 1997 Insp Rept 50-346/97-11 on 970818-0929.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970101997-10-11011 October 1997 Insp Rept 50-346/97-10 on 970806-07 & 0903-04.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier Sys IR 05000346/19970091997-10-0101 October 1997 Insp Rept 50-346/97-09 on 970707-0818.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970081997-09-23023 September 1997 Insp Rept 50-346/97-08 on 970527-0707.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19972011997-09-0404 September 1997 Insp Rept 50-346/97-201 on 970505-09,19-23 & 0609-20.No Violations Noted.Major Areas Inspected:Hpi Sys & LPI Functions of Dhrs IR 05000346/19970071997-08-0404 August 1997 Insp Rept 50-346/97-07 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Re Emergency Plan Exercise IR 05000346/19970061997-06-26026 June 1997 Insp Rept 50-346/97-06 on 970414-0527.No Violations Noted. Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000346/19970041997-05-0909 May 1997 Insp Rept 50-346/97-04 on 970303-0414.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970051997-05-0808 May 1997 Insp Rept 50-346/97-05 on 970324-28 & 0416-21.No Violations Noted.Major Areas Inspected:Inspector Reviewed Security Force Contingency Training,Equipment & Facilities & Held Interviews W/Security Supervisor Responsible for Training ML20140C5381997-04-0707 April 1997 Insp Rept 50-346/97-03 on 970118-0307.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20135F1061997-03-0606 March 1997 Insp Rept 50-346/97-02 on 970113-17.Violations Noted.Major Areas Inspected:Operations,Maint,Qa & Engineering ML20135D3641997-02-25025 February 1997 Insp Rept 50-346/96-14 on 961126-970124 & 970213.Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000346/19960131997-02-0606 February 1997 Insp Rept 50-346/96-13 on 961202-970117.Violation Noted. Major Areas Inspected:Numerous Effluent & Area Radiation Monitors & Insp of Radiation Monitor Panel in Control Room IR 05000346/19960101997-01-31031 January 1997 Insp Rept 50-346/96-10 on 961009-1127.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering,Plant Support ML20133E6511997-01-0606 January 1997 Insp Rept 50-346/96-11 on 961104-08 & 1218.Deviations Noted. Major Areas Inspected:Review of EP Program & Plant Support ML20133C9591996-12-27027 December 1996 Insp Rept 50-346/96-06 on 960815-1009.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000346/19990171999-10-26026 October 1999 Insp Rept 50-346/99-17 on 990928-1001.No Violations Noted. Major Areas Inspected:Implementation of Licensee Protected Area Ingress Search Program,Maint Support for Security Sys, Alarms Stations & Communications & QA IR 05000346/19990101999-10-0808 October 1999 Insp Rept 50-346/99-10 on 990802-0913.One NCV Occurred. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19990091999-08-20020 August 1999 Insp Rept 50-346/99-09 on 990623-0802.Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000346/19990151999-08-0909 August 1999 Insp Rept 50-346/99-15 on 990712-16.No Violations Noted. Major Areas Inspected:Effectiveness of Licensee Program for Mgt of Solid Waste,Transportation of Radioactive Matl & Radwaste & Radiological Environ Monitoring IR 05000346/19990081999-07-20020 July 1999 Insp Rept 50-346/99-08 on 990513-0628.Three Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19990041999-06-0707 June 1999 Insp Rept 50-346/99-04 on 990323-0513.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207G0691999-06-0404 June 1999 Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513. Violations Identified with Pending Licensee Response.Major Areas Inspected:Review of Licensee Maint Activities Associated with Pressurizer Spray Valve RC-2 IR 05000346/19990051999-04-27027 April 1999 Insp Rept 50-346/99-05 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee on-line Maint Risk Assessment Program IR 05000346/19990011999-03-0505 March 1999 Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19990021999-02-25025 February 1999 Insp Rept 50-346/99-02 on 990202-05.No Violations Noted. Major Areas Inspected:Aspects of Licensee Program for Controlling Operational Chemistry & External & Internal Exposures IR 05000346/19980181999-01-22022 January 1999 Insp Rept 50-346/98-18 on 981110-990102.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000346/19980201998-12-17017 December 1998 Insp Rept 50-346/98-20 on 981116-20.No Violations Noted. Major Areas Inspected:Review of Licensee Licensed Operator Requalification Training Program IR 05000346/19980171998-12-0909 December 1998 Insp Rept 50-346/98-17 on 980918-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980191998-11-20020 November 1998 Insp Rept 50-346/98-19 on 981014-23.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980151998-10-16016 October 1998 Insp Rept 50-346/98-15 on 980914-18.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program IR 05000346/19980141998-10-14014 October 1998 Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980161998-09-30030 September 1998 Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted. Major Areas Inspected:Plant Support IR 05000346/19980111998-09-0909 September 1998 Revised Pages 15 & 18 to Insp Rept 50-346/98-11,correcting Number Given for Unresolved Item 50-346/95009-02.Number Should Read 50-346/96002-09 ML20151T0071998-09-0303 September 1998 Insp Rept 50-346/98-11 on 980803-14.No Violations Noted. Major Areas Inspected:Effectiveness of Corrective Action Program IR 05000346/19980131998-08-25025 August 1998 Insp Rept 50-346/98-13 on 980623-0807.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980121998-08-14014 August 1998 Insp Rept 50-346/98-12 on 980624-29.No Violations Noted. Major Areas Inspected:Review of Licensee Response & Recovery from Damage Caused by 980624 Tornado,Operations & Plant Support IR 05000346/19980091998-07-28028 July 1998 Insp Rept 50-346/98-09 on 980512-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236G9431998-06-30030 June 1998 Insp Rept 50-346/98-08 on 980526-0617.Violations Noted.Major Areas Inspected:Licensee Performance Re Physical Security ML20236F2201998-06-27027 June 1998 Insp Rept 50-346/98-10 on 980608-11.Violation Noted. Major Areas Inspected:Solid Radwaste Mgt & Transportation Program,Radiological Effluent Monitoring & Control Program & Maint Program for Station Emergency IR 05000346/19980051998-06-11011 June 1998 Insp Rept 50-346/98-05 on 980401-0512.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980061998-06-0909 June 1998 Insp Rept 50-346/98-06 on 980422-0507.Violations Noted. Major Areas Inspected:Aspects of Licensee Code Repairs of MSIV & Nondestructive Exam of Control Rod Drive Housing & Main Steam Nozzle & Decay Heat Sys Welds IR 05000346/19980071998-05-26026 May 1998 Insp Rept 50-346/98-07 on 980427-30.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Eleventh Refueling Outage & Review of Radiation Worker Practices & Recent Events Including Resin Breakthrough IR 05000346/19980041998-04-10010 April 1998 Insp Rept 50-346/98-04 on 980218-0331.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216D8861998-03-10010 March 1998 Insp Rept 50-346/98-02 on 980108-0218.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980031998-03-10010 March 1998 Insp Rept 50-346/98-03 on 980223-26.No Violations Noted. Major Areas Inspected:Engineering IR 05000346/19970151998-01-28028 January 1998 Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970131997-11-21021 November 1997 Insp Rept 50-346/97-13 on 970929-1110.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970141997-11-10010 November 1997 Insp Rept 50-346/97-14 on 971021-23.No Violations Noted. Major Areas Inspected:Maint IR 05000346/19970121997-11-0404 November 1997 Insp Rept 50-346/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Review of Radiation Protection & Chemistry Programs IR 05000346/19970111997-10-31031 October 1997 Insp Rept 50-346/97-11 on 970818-0929.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970101997-10-11011 October 1997 Insp Rept 50-346/97-10 on 970806-07 & 0903-04.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier Sys IR 05000346/19970091997-10-0101 October 1997 Insp Rept 50-346/97-09 on 970707-0818.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970081997-09-23023 September 1997 Insp Rept 50-346/97-08 on 970527-0707.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19972011997-09-0404 September 1997 Insp Rept 50-346/97-201 on 970505-09,19-23 & 0609-20.No Violations Noted.Major Areas Inspected:Hpi Sys & LPI Functions of Dhrs IR 05000346/19970071997-08-0404 August 1997 Insp Rept 50-346/97-07 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Re Emergency Plan Exercise IR 05000346/19970061997-06-26026 June 1997 Insp Rept 50-346/97-06 on 970414-0527.No Violations Noted. Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000346/19970041997-05-0909 May 1997 Insp Rept 50-346/97-04 on 970303-0414.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970051997-05-0808 May 1997 Insp Rept 50-346/97-05 on 970324-28 & 0416-21.No Violations Noted.Major Areas Inspected:Inspector Reviewed Security Force Contingency Training,Equipment & Facilities & Held Interviews W/Security Supervisor Responsible for Training ML20140C5381997-04-0707 April 1997 Insp Rept 50-346/97-03 on 970118-0307.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20135F1061997-03-0606 March 1997 Insp Rept 50-346/97-02 on 970113-17.Violations Noted.Major Areas Inspected:Operations,Maint,Qa & Engineering ML20135D3641997-02-25025 February 1997 Insp Rept 50-346/96-14 on 961126-970124 & 970213.Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000346/19960131997-02-0606 February 1997 Insp Rept 50-346/96-13 on 961202-970117.Violation Noted. Major Areas Inspected:Numerous Effluent & Area Radiation Monitors & Insp of Radiation Monitor Panel in Control Room IR 05000346/19960101997-01-31031 January 1997 Insp Rept 50-346/96-10 on 961009-1127.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering,Plant Support ML20133E6511997-01-0606 January 1997 Insp Rept 50-346/96-11 on 961104-08 & 1218.Deviations Noted. Major Areas Inspected:Review of EP Program & Plant Support ML20133C9591996-12-27027 December 1996 Insp Rept 50-346/96-06 on 960815-1009.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000346/19990171999-10-26026 October 1999 Insp Rept 50-346/99-17 on 990928-1001.No Violations Noted. Major Areas Inspected:Implementation of Licensee Protected Area Ingress Search Program,Maint Support for Security Sys, Alarms Stations & Communications & QA IR 05000346/19990101999-10-0808 October 1999 Insp Rept 50-346/99-10 on 990802-0913.One NCV Occurred. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19990091999-08-20020 August 1999 Insp Rept 50-346/99-09 on 990623-0802.Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000346/19990151999-08-0909 August 1999 Insp Rept 50-346/99-15 on 990712-16.No Violations Noted. Major Areas Inspected:Effectiveness of Licensee Program for Mgt of Solid Waste,Transportation of Radioactive Matl & Radwaste & Radiological Environ Monitoring IR 05000346/19990081999-07-20020 July 1999 Insp Rept 50-346/99-08 on 990513-0628.Three Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19990041999-06-0707 June 1999 Insp Rept 50-346/99-04 on 990323-0513.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207G0691999-06-0404 June 1999 Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513. Violations Identified with Pending Licensee Response.Major Areas Inspected:Review of Licensee Maint Activities Associated with Pressurizer Spray Valve RC-2 IR 05000346/19990051999-04-27027 April 1999 Insp Rept 50-346/99-05 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee on-line Maint Risk Assessment Program IR 05000346/19990011999-03-0505 March 1999 Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19990021999-02-25025 February 1999 Insp Rept 50-346/99-02 on 990202-05.No Violations Noted. Major Areas Inspected:Aspects of Licensee Program for Controlling Operational Chemistry & External & Internal Exposures IR 05000346/19980181999-01-22022 January 1999 Insp Rept 50-346/98-18 on 981110-990102.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000346/19980201998-12-17017 December 1998 Insp Rept 50-346/98-20 on 981116-20.No Violations Noted. Major Areas Inspected:Review of Licensee Licensed Operator Requalification Training Program IR 05000346/19980171998-12-0909 December 1998 Insp Rept 50-346/98-17 on 980918-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980191998-11-20020 November 1998 Insp Rept 50-346/98-19 on 981014-23.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980151998-10-16016 October 1998 Insp Rept 50-346/98-15 on 980914-18.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program IR 05000346/19980141998-10-14014 October 1998 Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980161998-09-30030 September 1998 Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted. Major Areas Inspected:Plant Support IR 05000346/19980111998-09-0909 September 1998 Revised Pages 15 & 18 to Insp Rept 50-346/98-11,correcting Number Given for Unresolved Item 50-346/95009-02.Number Should Read 50-346/96002-09 ML20151T0071998-09-0303 September 1998 Insp Rept 50-346/98-11 on 980803-14.No Violations Noted. Major Areas Inspected:Effectiveness of Corrective Action Program IR 05000346/19980131998-08-25025 August 1998 Insp Rept 50-346/98-13 on 980623-0807.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980121998-08-14014 August 1998 Insp Rept 50-346/98-12 on 980624-29.No Violations Noted. Major Areas Inspected:Review of Licensee Response & Recovery from Damage Caused by 980624 Tornado,Operations & Plant Support IR 05000346/19980091998-07-28028 July 1998 Insp Rept 50-346/98-09 on 980512-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236G9431998-06-30030 June 1998 Insp Rept 50-346/98-08 on 980526-0617.Violations Noted.Major Areas Inspected:Licensee Performance Re Physical Security ML20236F2201998-06-27027 June 1998 Insp Rept 50-346/98-10 on 980608-11.Violation Noted. Major Areas Inspected:Solid Radwaste Mgt & Transportation Program,Radiological Effluent Monitoring & Control Program & Maint Program for Station Emergency IR 05000346/19980051998-06-11011 June 1998 Insp Rept 50-346/98-05 on 980401-0512.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980061998-06-0909 June 1998 Insp Rept 50-346/98-06 on 980422-0507.Violations Noted. Major Areas Inspected:Aspects of Licensee Code Repairs of MSIV & Nondestructive Exam of Control Rod Drive Housing & Main Steam Nozzle & Decay Heat Sys Welds IR 05000346/19980071998-05-26026 May 1998 Insp Rept 50-346/98-07 on 980427-30.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Eleventh Refueling Outage & Review of Radiation Worker Practices & Recent Events Including Resin Breakthrough IR 05000346/19980041998-04-10010 April 1998 Insp Rept 50-346/98-04 on 980218-0331.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216D8861998-03-10010 March 1998 Insp Rept 50-346/98-02 on 980108-0218.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980031998-03-10010 March 1998 Insp Rept 50-346/98-03 on 980223-26.No Violations Noted. Major Areas Inspected:Engineering IR 05000346/19970151998-01-28028 January 1998 Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970131997-11-21021 November 1997 Insp Rept 50-346/97-13 on 970929-1110.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970141997-11-10010 November 1997 Insp Rept 50-346/97-14 on 971021-23.No Violations Noted. Major Areas Inspected:Maint IR 05000346/19970121997-11-0404 November 1997 Insp Rept 50-346/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Review of Radiation Protection & Chemistry Programs IR 05000346/19970111997-10-31031 October 1997 Insp Rept 50-346/97-11 on 970818-0929.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970101997-10-11011 October 1997 Insp Rept 50-346/97-10 on 970806-07 & 0903-04.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier Sys IR 05000346/19970091997-10-0101 October 1997 Insp Rept 50-346/97-09 on 970707-0818.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970081997-09-23023 September 1997 Insp Rept 50-346/97-08 on 970527-0707.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19972011997-09-0404 September 1997 Insp Rept 50-346/97-201 on 970505-09,19-23 & 0609-20.No Violations Noted.Major Areas Inspected:Hpi Sys & LPI Functions of Dhrs IR 05000346/19970071997-08-0404 August 1997 Insp Rept 50-346/97-07 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Re Emergency Plan Exercise IR 05000346/19970061997-06-26026 June 1997 Insp Rept 50-346/97-06 on 970414-0527.No Violations Noted. Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000346/19970041997-05-0909 May 1997 Insp Rept 50-346/97-04 on 970303-0414.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970051997-05-0808 May 1997 Insp Rept 50-346/97-05 on 970324-28 & 0416-21.No Violations Noted.Major Areas Inspected:Inspector Reviewed Security Force Contingency Training,Equipment & Facilities & Held Interviews W/Security Supervisor Responsible for Training ML20140C5381997-04-0707 April 1997 Insp Rept 50-346/97-03 on 970118-0307.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20135F1061997-03-0606 March 1997 Insp Rept 50-346/97-02 on 970113-17.Violations Noted.Major Areas Inspected:Operations,Maint,Qa & Engineering ML20135D3641997-02-25025 February 1997 Insp Rept 50-346/96-14 on 961126-970124 & 970213.Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000346/19960131997-02-0606 February 1997 Insp Rept 50-346/96-13 on 961202-970117.Violation Noted. Major Areas Inspected:Numerous Effluent & Area Radiation Monitors & Insp of Radiation Monitor Panel in Control Room IR 05000346/19960101997-01-31031 January 1997 Insp Rept 50-346/96-10 on 961009-1127.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering,Plant Support ML20133E6511997-01-0606 January 1997 Insp Rept 50-346/96-11 on 961104-08 & 1218.Deviations Noted. Major Areas Inspected:Review of EP Program & Plant Support ML20133C9591996-12-27027 December 1996 Insp Rept 50-346/96-06 on 960815-1009.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-09
[Table view] Category:UTILITY
MONTHYEARIR 05000346/19900211990-11-19019 November 1990 Safety Insp Rept 50-346/90-21 on 901015-1105.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualifications & Instrumentation Sys for Assessing Plant Conditions Per Reg Guide 1.97 IR 05000346/19900161990-10-24024 October 1990 Insp Rept 50-346/90-16 on 900814-1009.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Plant Operations,Refueling,Radiological Controls,Maint/Surveillance & Emergency Preparedness IR 05000346/19900171990-09-13013 September 1990 Insp Rept 50-346/90-17 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Implementation of 10CFR50.62 & ATWS Rule,Per Temporary Instruction 2500/20 ML20059A6891990-08-10010 August 1990 Safety Insp Rept 50-346/90-09 on 900417-0717.Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Lers,Plant Operations,Refueling,Radiological Controls,Security,Emergency Preparedness & Maint IR 05000346/19900131990-08-10010 August 1990 Insp Rept 50-346/90-13 on 900605-0709.Noncited Violation Noted.Major Areas Inspected:Lers,Plant Operations,Refueling, Radiological Controls,Maint/Surveillance,Emergency Preparedness,Security,Engineering & Technical Support IR 05000346/19900141990-08-0909 August 1990 Enforcement Conference Rept 50-346/90-14 on 900601 & 900717 Telcon.Major Areas Discussed:Violations of Tech Specs & 10CFR50,App B Requirements Re Potential for Overexposure During Core Support Assembly Lift Activities IR 05000346/19900101990-07-19019 July 1990 Safety Insp Rept 50-346/90-10 on 900430-0518.No Violations or Deviations Noted.Major Areas Inspected:Engineering & Technical Support Function,Including Design,Installation & Testing of Mods & Commercial Grade Procurement IR 05000346/19890181989-09-0101 September 1989 Insp Rept 50-346/89-18 on 890707-11.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Observations by Six NRC Representatives of Key Functions & Locations During Exercise IR 05000346/19890161989-08-17017 August 1989 Safety Insp Rept 50-346/89-16 on 890605-0716 & 24.Violations Noted.Major Areas Inspected:Lers,Allegations,Plant Operations,Radiological Controls,Maint/Surveillance, Emergency Preparedness & Security IR 05000346/19890201989-08-0909 August 1989 Insp Rept 50-346/89-20 on 890724-28.No Violations Noted. Major Areas Inspected:Radiation Protection Program During Routine Operations,Organization Changes,Mgt Controls,Control of Radioactive Matls & Contamination & Audits IR 05000346/19890081989-07-19019 July 1989 Addendum to Insp Rept 50-346/89-08,consisting of Comparisons of Results of Liquid Sample Collected During Insp & Criteria for Comparing Analytical Measurements IR 05000346/19890171989-07-0505 July 1989 Insp Rept 50-346/89-17 on 890614-16.No Violations Noted. Major Areas Inspected:Licensee self-initiated Engineering Evaluation Efforts,Including SSFIs for Auxiliary Feedwater Sys & Station & Instrument Air Sys IR 05000346/19890151989-06-23023 June 1989 Safety Insp Rept 50-346/89-15 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected:Review of Allegation Re Operation of Facility IR 05000346/19890141989-06-22022 June 1989 Insp Rept 50-346/89-14 on 890424-0604.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint/Surveillance,Emergency Preparedness,Security, Engineering & Technical Support & Safety Assessment IR 05000346/19890131989-06-0606 June 1989 Insp Rept 50-346/89-13 on 890515-19.No Violations Noted. Major Areas Inspected:Followup on Actual Emergency Plan Activations,Licensee Action on Previously Identified Items & Operational Status of Emergency Preparedness Program IR 05000346/19890071989-05-18018 May 1989 Partially Withheld Physical Security Insp Rept 50-346/89-07 on 890221-0417 (Ref 10CFR73.21(c)(2)).No Violations Noted. Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers,Access Control - Personnel & Alarm Stations IR 05000346/19890111989-05-11011 May 1989 Safety Insp Rept 50-346/89-11 on 890301-0423.Licensee Identified Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operations,Radiological Controls, Maint/Surveillance,Emergency Preparedness & Security ML20246K7641989-05-0505 May 1989 Insp Rept 50-346/89-12 on 890313-17 & 0418.Violations Noted. Major Areas Inspected:Implementation of Licensee Fire Protection Program Through Followup of Licensee Action on Previous Insp Findings IR 05000346/19890061989-05-0101 May 1989 Insp Rept 50-346/89-06 on 890131-0209.No Violations or Deviations Noted.Major Area Inspected:Adequacy of Emergency Operation Procedures.Numerous Technical & Human Factor Deficiencies Identified IR 05000346/19890051989-03-22022 March 1989 Insp Rept 50-346/89-05 on 890116-0228.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Lers,Licensee Events & Fire Protection ML20246L8991989-03-15015 March 1989 Insp Rept 50-346/89-08 on 890213-17.No Violations Noted. Major Areas Inspected:Confirmatory Measurements & Environ Monitoring programs,including,audits,QA,in-plant Radiochemical Analyses & post-accident Sampling IR 05000346/19890041989-02-24024 February 1989 Insp Rept 50-346/89-04 on 890123-0206.Violation Noted.Major Areas Inspected:Radwaste/Transportation Program,Including Organization & Mgt Controls,Training & Qualifications, Gaseous Radwaste,Liquid Radwaste & Solid Radwaste IR 05000346/19890021989-02-24024 February 1989 Insp Rept 50-346/89-02 on 890109-0209.No Violations Noted. Major Areas Inspected:Design Changes & Mods & Assurances of Engineered Quality IR 05000346/19880341988-11-18018 November 1988 Insp Rept 50-346/88-34 on 881101-03.No Violations Noted. Major Areas inspected:1988 Emergency Preparedness Exercise (IP 82301),involving Observations of Four NRC Insps on Most of Facilities,Equipment & Personnel Involved in Exercise IR 05000346/19880241988-11-18018 November 1988 Insp Rept 50-346/88-24 on 880804-1020.Violations Noted. Major Areas inspected:post-mod Procedure Review & Tests Witnessing,Containment Integrated Leak Rate Test (Cilrt), Cilrt Procedure Review,Test Witnessing & Evaluation IR 05000346/19880401988-11-18018 November 1988 Corrected Insp Rept 50-346/88-40 on 881101-03.No Violations, Deviations or Deficiencies Identified.Major Areas Inspected: 1988 Emergency Preparedness Exercise IR 05000346/19880351988-11-15015 November 1988 Insp Rept 50-346/88-35 on 881003-28.No Violations Noted. Major Areas Inspected:Allegation Re Operation of Facility IR 05000346/19880261988-11-10010 November 1988 Insp Rept 50-346/88-26 on 880816-0930.No Violations or Deviations Noted.Unresolved Items & Weakness Noted.Major Areas Inspected:Operational Safety Verifications,Maint, Surveillance,Lers,Licensee Events & Quality Verification IR 05000346/19880171988-10-27027 October 1988 Insp Rept 50-346/88-17 on 880412-0916.No Violations Noted. Allegation Inspected:Individuals Inappropriately Placed in Util Employee Assistance Program &/Or Placed on Plant Denied Access List for Criticizing Mgt Policies ML20205J7001988-10-24024 October 1988 Insp Rept 50-346/88-34 on 880912-16 & 1003-05.No Violations or Deviations Noted.Major Areas Inspected:Allegations Made by Former Employee Re Certain Quality & Safeguards Requirements Violated During Installation of Fire Dampers IR 05000346/19880281988-10-19019 October 1988 Insp Rept 50-346/88-28 on 880912-16 & 1011.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings & Limited Scope Fire Protection Program Review, Including Field Exam of Plant Administrative Controls IR 05000346/19880311988-10-0404 October 1988 Insp Rept 50-346/88-31 on 880829-0902 & 0912-16.No Violations or Deviations Noted.Major Areas Inspected: Testing of Steam & Feedwater Rupture Control Sys,Review of Potential Conditions Adverse to Quality & Training IR 05000346/19880331988-09-29029 September 1988 Enforcement Conference Rept 50-346/88-33 on 880926-28. Potential Violation Noted Re Apparent Employment Discrimination Noted in Insp Rept 50-346/88-27.Agenda & Viewgraphs Encl IR 05000346/19880121988-09-21021 September 1988 Insp Rept 50-346/88-12 on 880504-0802.Violations Noted.Major Areas Inspected:Series of Allegations Re Plant Operation, Including QC Manager Pressuring QC Inspector to Sign Maint Work Order to Accept Radiographs Not Meeting ASME Code IR 05000346/19880091988-09-15015 September 1988 Safety Insp Rept 50-346/88-09 on 880321-0908.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities Including Review of Program (73051),procedures (73052) & Observation of Work Activities (73753) ML20154K9751988-09-12012 September 1988 Insp Rept 50-346/88-27 on 880504-0902.One Violation Noted. Major Areas Inspected:Allegation Re Operation of Plant IR 05000346/19880211988-09-0808 September 1988 Insp Rept 50-346/88-21 on 880701-0815.No Violations Noted. Major Areas Inspected:Routine,Unannounced Insp by Resident Inspectors of Licensee Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Licensee Events & QA IR 05000346/19880231988-08-16016 August 1988 Insp Rept 50-346/88-23 on 880801-05.No Violations or Deviations Noted.Major Areas Inspected:Util Action on Previously Identified Insp Items & Compliance W/Atws Rule, 10CFR50.62 Per Temporary Instruction 2500/20 (25020) IR 05000346/19880221988-08-10010 August 1988 Partially Withheld Insp Rept 50-346/88-22 on 880111-15 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Assessment Aids,Audits,Detection Aids - Vital Areas, Communications,Records & Repts IR 05000346/19880251988-08-0404 August 1988 Insp Rept 50-346/88-25 on 880412-15.No Violations Noted. Major Areas Inspected:Allegations That Security Guards Not Alert Due to Excessive Overtime,Vehicles Not Properly Searched Due to Exhaustion & Security Mgt Unconcerned IR 05000346/19880201988-08-0101 August 1988 Insp Rept 50-346/88-20 on 880711-15 & 18.No Violations, Deviations or Deficiencies Noted.Major Areas Inspected: Emergency Preparedness Program,Including Followup on Actual Emergency Plan Activations IR 05000346/19880161988-07-0808 July 1988 Insp Rept 50-346/88-16 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Outage Radiation Protection & Operational Radwaste Mgt Program,Including Organizational Changes & Mgt Controls IR 05000346/19880101988-06-0909 June 1988 Insp Rept 50-346/88-10 on 880401-0515.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Maint, Surveillance,Lers,Bulletins & Fire Protection IR 05000346/19880141988-06-0707 June 1988 Insp Rept 50-346/88-14 on 880519-13.Violation Noted.Major Areas Inspected:Defueling Activities.Unresolved Item Identified Involving Mod of Fuel Grapple on Three Fuel Handling Bridges IR 05000346/19880111988-05-0909 May 1988 Insp Rept 50-346/88-11 on 880411-29.No Violations or Deviations Noted.Major Areas Inspected:Implementation of Generic Ltr 83-28 in Areas of Equipment Classification, Vendor interface,post-maint Testing & Reactor Trip Sys IR 05000346/19880131988-04-27027 April 1988 Insp Rept 50-346/88-13 on 880412-14.No Violations or Deviations Noted.Major Areas Inspected:Allegations Re Operation of Facility IR 05000346/19880071988-04-27027 April 1988 Insp Rept 50-346/88-07 on 880216-0331.Violations Noted.Major Areas Inspected:Operational Safety,Maint,Surveillance,Ler Followup.Onsite Followup of Events,Independent Safety Engineering,Team Insps & Public Meetings IR 05000346/19880061988-04-12012 April 1988 Safety Insp Rept 50-346/88-06 on 880222-26 & 0307-11. Violations Noted.Major Areas Inspected:Review of Allegations & Resultant Review of QA Implementing Procedures & Quality Records,Design Changes & Mods IR 05000346/19880081988-04-0505 April 1988 Insp Rept 50-346/88-08 on 880223-26 & 0307-11.No Violations or Deviations Noted.Major Areas Inspected:Operational Radiation Protection,Solid Radwaste Mgt & Nonradiological Chemistry Programs,Including Mgt Controls & Training IR 05000346/19880021988-04-0505 April 1988 Insp Rept 50-346/88-02 on 880101-0215.Violations Noted.Major Areas Inspected:Action on Previouly Insp Findings,Maint, Operational Safety,Surveillance,Performance Enhancement Program,Ler Followup,Security & Onsite Followup of Events 1990-09-13
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000346/19990171999-10-26026 October 1999 Insp Rept 50-346/99-17 on 990928-1001.No Violations Noted. Major Areas Inspected:Implementation of Licensee Protected Area Ingress Search Program,Maint Support for Security Sys, Alarms Stations & Communications & QA IR 05000346/19990101999-10-0808 October 1999 Insp Rept 50-346/99-10 on 990802-0913.One NCV Occurred. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19990091999-08-20020 August 1999 Insp Rept 50-346/99-09 on 990623-0802.Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000346/19990151999-08-0909 August 1999 Insp Rept 50-346/99-15 on 990712-16.No Violations Noted. Major Areas Inspected:Effectiveness of Licensee Program for Mgt of Solid Waste,Transportation of Radioactive Matl & Radwaste & Radiological Environ Monitoring ML20210P7981999-08-0606 August 1999 Notice of Violation from Insp on 980901-990513.Violations Noted:Prior to 980901,licensee Inadvertently Performed Field Change to Pressurizer Spray Valve RC-2,not Approved by Organization That Performed Original Design IR 05000346/19990081999-07-20020 July 1999 Insp Rept 50-346/99-08 on 990513-0628.Three Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19990041999-06-0707 June 1999 Insp Rept 50-346/99-04 on 990323-0513.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207G0691999-06-0404 June 1999 Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513. Violations Identified with Pending Licensee Response.Major Areas Inspected:Review of Licensee Maint Activities Associated with Pressurizer Spray Valve RC-2 IR 05000346/19990051999-04-27027 April 1999 Insp Rept 50-346/99-05 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee on-line Maint Risk Assessment Program IR 05000346/19990011999-03-0505 March 1999 Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19990021999-02-25025 February 1999 Insp Rept 50-346/99-02 on 990202-05.No Violations Noted. Major Areas Inspected:Aspects of Licensee Program for Controlling Operational Chemistry & External & Internal Exposures IR 05000346/19980181999-01-22022 January 1999 Insp Rept 50-346/98-18 on 981110-990102.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000346/19980201998-12-17017 December 1998 Insp Rept 50-346/98-20 on 981116-20.No Violations Noted. Major Areas Inspected:Review of Licensee Licensed Operator Requalification Training Program IR 05000346/19980171998-12-0909 December 1998 Insp Rept 50-346/98-17 on 980918-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20198B5431998-12-0909 December 1998 Notice of Violation from Insp on 980918-1109.Violation Noted:Maint Work Order Which Contained Instructions to Abandon Primary Water Storage Tank Was Not Appropriate to Circumstance IR 05000346/19980191998-11-20020 November 1998 Insp Rept 50-346/98-19 on 981014-23.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980151998-10-16016 October 1998 Insp Rept 50-346/98-15 on 980914-18.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program IR 05000346/19980141998-10-14014 October 1998 Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980161998-09-30030 September 1998 Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted. Major Areas Inspected:Plant Support ML20153F8201998-09-23023 September 1998 NRC Operator Licensing Exam Rept 50-346/98-301OL (Including Completed & Graded Tests) for Tests Administered on 980803-07 IR 05000346/19980111998-09-0909 September 1998 Revised Pages 15 & 18 to Insp Rept 50-346/98-11,correcting Number Given for Unresolved Item 50-346/95009-02.Number Should Read 50-346/96002-09 ML20151T0071998-09-0303 September 1998 Insp Rept 50-346/98-11 on 980803-14.No Violations Noted. Major Areas Inspected:Effectiveness of Corrective Action Program IR 05000346/19980131998-08-25025 August 1998 Insp Rept 50-346/98-13 on 980623-0807.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19980121998-08-14014 August 1998 Insp Rept 50-346/98-12 on 980624-29.No Violations Noted. Major Areas Inspected:Review of Licensee Response & Recovery from Damage Caused by 980624 Tornado,Operations & Plant Support IR 05000346/19980091998-07-28028 July 1998 Insp Rept 50-346/98-09 on 980512-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236W2311998-07-28028 July 1998 Notice of Violation from Insp on 980512-0623.Violation Noted:As of 980522,established Measures Inadequate to Ensure That Design Basis of Containment Bldg Emergency Sump Correctly Translated Into Specifications ML20236G9361998-06-30030 June 1998 Notice of Violation from Insp on 980526-0617.Violation Noted:Record Reviews & Interviews Showed That Unescorted Access to Protected Area Granted to Two Security Officers W/O All Required Elements of Employment History ML20236G9431998-06-30030 June 1998 Insp Rept 50-346/98-08 on 980526-0617.Violations Noted.Major Areas Inspected:Licensee Performance Re Physical Security ML20236F2201998-06-27027 June 1998 Insp Rept 50-346/98-10 on 980608-11.Violation Noted. Major Areas Inspected:Solid Radwaste Mgt & Transportation Program,Radiological Effluent Monitoring & Control Program & Maint Program for Station Emergency ML20236F2001998-06-27027 June 1998 Notice of Violation from Insp on 980608-11.Violations Noted: Licensee Failed to Conduct Audits of Process Control Program & Implementation Procedures for Processing & Packaging Radwaste at Least Once Per 24 Months PNO-III-98-035A, on 980624,reactor Tripped Automatically During Recovery Activities from Tornado Which Damaged Electrical Switchyard & Cut Off Offsite Power Supply1998-06-26026 June 1998 PNO-III-98-035A:on 980624,reactor Tripped Automatically During Recovery Activities from Tornado Which Damaged Electrical Switchyard & Cut Off Offsite Power Supply PNO-III-98-035, on 980624,plant Automatically Shut Down After Tornado Damaged Electrical Switchyard & Cut Off Offsite Power Supply.Licensee Declared Alert Under Emergency Plan. Licensee Assessing Extent of Damage1998-06-25025 June 1998 PNO-III-98-035:on 980624,plant Automatically Shut Down After Tornado Damaged Electrical Switchyard & Cut Off Offsite Power Supply.Licensee Declared Alert Under Emergency Plan. Licensee Assessing Extent of Damage ML20249A6061998-06-11011 June 1998 Notice of Violation from Insp on 980401-0512.Violation Noted:Before 980415,Procedures DB-OP-06230 & DB-OP-03011 Were Not Appropriate to Circumstances Due to Not Providing Instructions for Manipulting Valves as Listed IR 05000346/19980051998-06-11011 June 1998 Insp Rept 50-346/98-05 on 980401-0512.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19980061998-06-0909 June 1998 Insp Rept 50-346/98-06 on 980422-0507.Violations Noted. Major Areas Inspected:Aspects of Licensee Code Repairs of MSIV & Nondestructive Exam of Control Rod Drive Housing & Main Steam Nozzle & Decay Heat Sys Welds ML20248M3111998-06-0909 June 1998 Notice of Violation from Insp on 980422-0507.Violation Noted:Condition Adverse to Quality Not Promptly Identified & Corrected,In That on 980515,potential Condition Adverse to Quality Rept Not Initiated After Unauthorized Wire Brush IR 05000346/19980071998-05-26026 May 1998 Insp Rept 50-346/98-07 on 980427-30.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Eleventh Refueling Outage & Review of Radiation Worker Practices & Recent Events Including Resin Breakthrough ML20248B1621998-05-26026 May 1998 Notice of Violation from Insp on 980427-30.Violation Noted: No Surveys Performed by Licensee on 980421 to Identify Potential for High Dose Rates in Anulus Area During Incore Detector Movement,Prior to Allowing Workers to Enter Area IR 05000346/19980041998-04-10010 April 1998 Insp Rept 50-346/98-04 on 980218-0331.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216D8811998-03-10010 March 1998 Notice of Violation from Insp on 980107-0218.Violation Noted:On 980106,during Performance of Procedure DB-SP-03357, Rev 01, RCS Water Inventory Balance, Step 4.1.10,RO Erroneously Closed RCP Seal Return Valve MU-38 IR 05000346/19980031998-03-10010 March 1998 Insp Rept 50-346/98-03 on 980223-26.No Violations Noted. Major Areas Inspected:Engineering ML20216D8861998-03-10010 March 1998 Insp Rept 50-346/98-02 on 980108-0218.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970151998-01-28028 January 1998 Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000346/19970131997-11-21021 November 1997 Insp Rept 50-346/97-13 on 970929-1110.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000346/19970141997-11-10010 November 1997 Insp Rept 50-346/97-14 on 971021-23.No Violations Noted. Major Areas Inspected:Maint IR 05000346/19970121997-11-0404 November 1997 Insp Rept 50-346/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Review of Radiation Protection & Chemistry Programs ML20198Q0791997-11-0404 November 1997 Notice of Violation from Insp on 971006-10.Violation Noted:Class 7 Radioactive Matl Package Excepted from Specification Packaging,Marking & Labeling Requirements & Shipping Paper & Certification Were Improperly Transported IR 05000346/19970111997-10-31031 October 1997 Insp Rept 50-346/97-11 on 970818-0929.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198P0981997-10-31031 October 1997 Notice of Violation from Insp on 970818-0929.Violation Noted:On 970826,NRC Identified That Maint Personnel Did Not Use Four 0-72 Psi Test Gauges w/0.05% Accuracy or Equivalent While Performing DB-MI-03906 IR 05000346/19970101997-10-11011 October 1997 Insp Rept 50-346/97-10 on 970806-07 & 0903-04.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier Sys 1999-08-09
[Table view] |
Text
.
.
-
.
..
,
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-346/88016(DRSS) ,
Ducket No. 50-346 License No. NPF-3 Licensee: Toledo Edisor, Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station Inspection At: Davis-Besse Site, Oak Harbor, Ohio Inspection Conducted: June 13-17, 1988 h.h?btt[bv I Inspectors: D. E. Miller 7 Date M. unows i kW88 *
Date Approved By: R. G eger, Cnief 9 [88 Facilities Radiation Date Protection Section Inspection Summary:
Inspection on June 13-17, 1988 (Report No. 50-346/88016(DRSS))
Areas Inspected: Routine unannounced inspection of the outage radiation protection and operational radwaste management programs, including; organizational changes, management controls, training and qualifications (IP 83729); external and internal exposure controls (IP 837?9); control of radioactive materials and contamination (IP 83729); ALARA (IP 83729); gaseous radwaste (IP 84724); liquid radwaste (IP 84723); transportation (IP 86721);
and audits (IP 83729). Also reviewed were past inspection items and selected NRC Information Notice Results: The licensee's radiation protection and radwaste management programs appear well managed and implemented and include good methods of self-identification and coirection of programmatic weaknesses. Additional
'
,
station attention appears needed to ensure adequate pre-outage job planning and coordination. No violations or deviations were identifie s PDR ADOCK 05000346 G PNU
, . -
-- , - . . __ . - - _ _ , _- _ _ - _ _ _ _ _ _
, _ ..
'
.
.
,
.g-
.
-
DETAILS Persons Contacted L. Bonker, Radiological Health Supervisor N. Bonner, Assistant Plant Manager, Maintenance
.
R. Coad, Radiological Protection Supervisor-D. Erickson, Radiological Control Superintendent L. Harder, Radiological Control Supervisor G. Honma, Compliance Supervisor, Nuclear Licensing S. Jain, Director, Independent Safety Engineering (ISE)
'
J. Polyak, Radiological Assessment Manager, ISE L. Ramsett, Quality Assurance Director E. Salowitz, General Superintendent, Outage and. Program Management R. Schrauder, Nuclear Licensing Manager L. Storz, Plant Manager J. Sturdavant, Licensing Principal P. Byron, NRC Senior Resident Inspector The above individuals attended the exit meeting on June 17, 1988.
In addition to the above individuals, the inspectors contacted other licensee and contractor personne . General This insp9ction, which began on June 13, 1988, was conducted to review portions of the licensee's outage radiation protection, and operational radwaste and transportation programs. Also reviewed were past open and unresolved items, selected Licensee Event Reports, and a selected NRC Information Notice. Several tours of licensee facilities were made to observa posting, labeling, and access and contamination controls; no significant problems were note . Licensee Action on Previous Open Items and a Selected NRC Information Notice (Closed) Open Item (346/87021-01): Liquid radwaste release forms are not always complete. The licensee assigned review resporsibility to an individual who assures that forms are completed. No further problems were note (Closed) Open Item (346/87021-02): Need more accurate quantifications of containment pressure relief releases. The procedure change which includes an improved quantification method is in the final review proces Also, the license is considering installation of a flow measuring' device in the release pathwa (Closed) Open Item (346/88008-05): The Radiological Assessment Manager (RAM) is housed adjacent to the RC superintendent; this could affect employee interactions with the RAM. The RAM it. being relocated to an office not in close proximity to the RC depi.rtmen _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ ._. . _ _ _ _ _ _ _ .
.
.
.
- (0 pen) Unresolved Item (346/88008-01): Evaluate dose assignment methodology to show compliance with Form NRC-5. The licensee has completed their evaluation and has forwarded it to the NRC for revie As described below, the licensee made an adequate review of a Jelected NRC Information Notic Notice No. 87-32: Deficiencies in the Testing of Nuclear - Grade Activated Charcoal. The licensee uses one of the two vendors who satisfied the requirements of the interlaboratory comparison conducted for the NRC by the Idaho National Engineering Laborator . Radiological Control Organization, Changes, Management Controls, Training,
, and Qualifications (IP 83729)
'There have been no significant changes in these subject areas since the team inspection conducted during February and March 1988 (see Inspection Report No. 50-346/88008(DRSS)).
During this inspection, the inspectors reviewed the licensee's compliance with Generic Letter No. 82-12, Nuclear Power Plant Staff Working Hours; specifically reviewed was hours being worked by health physics testers (technicians). The licensee routinely limits hours worked by testers to sixty hours per week. Any work in excess of sixty hours must be authorized by the Plant Manager; this authorization is seldom used/
necessa ry. The licensee is in compliance with the generic letter regarding hours worked by health physics tester No violations or deviations were identifie . External Exposure Control (IP 83729)
The inspectors reviewed the licensee's external exposure control and personal dosimetry programs, including: changes in program to meet outage needs; use of dosimetry to determine whether requirements are met;.
planning and preparation for maintenance and refueling tasks including ALARA considerations; and required records, reports., and notification *
The licensee's external exposure controls program was extensively reviewed during the team inspection conducted during February and 3 March 1988 and described in Inspection Report No. 50-346/88008(DRSS).
No significant programmatic changes have since been made.
.
Noted in reactor operator examirers' Report No. 346/0L-88-01 was an observation that plant personnel fail to follow Procedure No. HP 1601.03.11, Radiation Work Permits (RWPs), which requires each worker exiting the radiologically controlled area (RCA) to read his/her Self-Reading Dosimeter (SRD) and to track his/her exposure on r pocket card; instead, persons were reported to be depositing their SRD in a box (frequently without reading the SRD) and not recording the SRD reading on their pocket car This matter was reviewed during this inspection. The inspectors noted that Procedure No. HP 1601.03.11 was in the final stages
,
of revision, and that a temporary change to the procedure was
. _ - . - , - - . - . - - _-. - - - - - - ,- - -
-
.
-
.
- accomplished by informational postings in.the access control area. Under the revised procedure, dosimetry clerks read the SRD and enter the reading- "
in a computer record. It-is intended that the-person' exiting the RCA read his/her-SRD before: depositing the SRD at the dosimetry clerk's counter only for their own information. The licensee plans to make available separate pocket cards for exiting persons who wish to maintain a personal record; however, such records would be optional. line computer record -is called up on the computer each time an individual obtains an SRD before entering the RCA and the record is updated upon the individual's exit. Include ~in the computer record is the RWP number under which the entry is made.
,
The inspectors consider the new system to be an improvement because the variability experienced when persons read their own SRD is reduced, and there is better assurance that all SRD readings are entered into dose records. The final' procedure will reflect the present field implementation chang No problems were note Personnel doses for the outage months of March and April totaled 6 person-rem, which is abovethe licensee's projection. According to the licensee, pre-outage dose estimates for planned major work items have been fairly accurate; the unaaticipated dose results from extensive support activities in low dose rate areas that were underestimated when projecting outage dose. The doses do not appear inordinately high for the extent of work being performed in the RC No violations or deviations were identifie . Internal fyposure Control (IP 83729)
The irspectors reviewed the licensee's internal exposure control '
and .asessment programs, including: changes to procedures affecting internal exposure control and personal assessment; determination whether engineering controls, respiratory equipment, and assessment of individual intues meet regulatory requirements; planning and preparation for maintenance and refueling tasks including ALARA considerations; and required records, reports, and notification The licensee's internal exposure controls program was extensively reviewed during the team inspection conducted during February and March 1988 and described in Inspection Report No. 50-340/88008(PRSS).
,
No significant programmatic changes have since been mad The inspectors selectively reviewed whole body counting results for the period March through May 1988. No intakes in excess of the 40 MPC-hour control measure were noted. Based on whole body counting and tritium urinalysis results, there is no indication of weaknesses it the licensee's I,
internal exposure control and assessment program.
,
No violations or deviations were identifie . Control of Radioactive Materials and Contamination (IP 83729)
The inspectors reviewed the licensee's program for control of radioactive materials and contamination, including: adequacy of supply, maintenance, '
and calibration of contamination survey and monitoring equipment;
,
!
I a . - - w--;.,. ,.--...n. .n-.,,,,--,,,..,-.-_,,,, , _ , _ , _ - - , . , - - , _ . , . , . , , , , , . _ - , , , , . _ . . , - . . . , , , .- - ,-
. . _ _ . _ . _ _
-
.
. ,
'
-
effectiveness of survey methods, practices, equipment and procedures; adequacy of review and dissemination of survey data; and effectiveness of methods of control of radioactive and contaminated material The licensee's program for control of radioactive materials and contamination is discussed in Inspection Report No. 50-346/88008(DRSS).
The new automated _ laundry monitor discussed in the report was being calibrated during this inspectio '
Ouring RCA tours, the inspectors observcd: work performed under radiation work permits; protective clothing use, handling, and cleaning; !
+
frisking; hot particle detection methods; and tool decontamination, handling, and storag No significant problems were note !
Ninety-seven personal contamination events have been recorded during 1988 through May; 52 of these events were recorded during May with 27 being clothing and 25 being skin contaminations. The licensee attributes half of_the large increase in the number of events to poor work practices during reactor _ head work and during valve work on ECCS 1-2 and the Decay Heat Removal System, and to the large number of personnel onsite who have little or no previous nuclear work experience. The inspectors discussed with the licensee during the inspection and at the exit meeting the desirability of providing practical radiation protection training to incoming radiation workers with little or no previous. nuclear work experienc '
During the licensee's followup and review of the personal contamination incidents that occurred in May, the licensee noted that half of the
' incidents occurred during the period midnight to 6:00 a.m.; no firm conclusion was drawn from this informatio No violations or deviations were identifie . ALARA (IP 83729)
The licensee's ALARA program was reviewed during a special NRC health physics team inspection just prior to the start of the current refueling /
maintenance outage (see Inspection Report No. 50-346/88008(ORSS)). During this inspection the inspectors noted that the licensee has made significant progress in strengthening and formalizing the ALARA program. The three contractors working in the ALARA group have developed extensive job history files which include photographs, videos, and records of pre-job briefings and post-job critique They have also compiled vendor / equipment catalogues and formulated recommendations for improvements in the quality of job packages presented for ALARA review, time allowed for ALARA reviews, scheduling of outage work, and ALARA techniques such as use of remote operators and strippable paint. The recommendations, a planned ALARA outage report, and the job history files, if properly used, should ensure a strong ALARA progra There were also indications that although most of the pre-job briefings and post-job critiques had been performed by the contractors, there has been some participation by the licensee's permanent radiation protection staff, especially at the technician and foreman leve *
. e
-
.
,
The inspectors reviewed aspects of several outage jobs. The licensee replaced several incore detectors and a pressurizer heater; licensee representatives and the job history files indicated that both jobs went smoothly and resulted in lower total dose than anticipated. Because of the success of the incore job, the licensee printed a photograph and article in the station newslette to highlight the accomplishments of the craft workers involved in the job and to give some positive publicity to the station's ALARA efforts. The inspectors also reviewed an outage job that apparently did not go smoothly, although the resultant dose total was close to the original estimat The licensee replaced four control valves, two on each loop, on the Decay Heat Removal System because the existing valves and operators required frequent maintenance and repai Previous maintenance and repairs apparently had been difficult and time-consuming because of the crcimped working area ano the valves were weld-end valves not flanged. Problems were encountered during the initial work on one of the loops, including missing or inaccurate reports and drawings, inadequate system isolation, faulty relays, and poor logistics for installation of scaffolding, tents and lead shieldin Most of the problems encoLntered o;. the first loop were addressed at a post-job critique and were not encountered during work on the second loop. Licensee reprcsentatives stated, however, that two of the new valves, one on each loop, were inappropriate for the system and were replaced with different valves. The inspectors also noted other instances where systems had not been isolated before work was started on associated valves. Fortunately, these instances did not result in any personal contaminations. However, they indicate the need for the station to review its system isolation / tagging out procedure and procedure implementation. Noted pre-outage and pre-job problems were discussed at the exit meetin As of mid-June 1988, the licensee had accumulated approximately 190 person-rem for the outage, compared to a goal for the entire outage of 160 person-rem. Licensee representatives attributed the higher than anticipated dose totals to accumulating more dose than planned on routine, low-dose jobs (those not subject to an ALARA review) and having to expand the scope of certain higher dose jobs after the start of the originally planned work; for example, initially, repairs were slated for
,
eight control rod drive mechanisms (CRDMs), but after work had begun on
' the reactor head at start of the outage, the licensee determined that 24 other CRDMs had to be removed, repaired, and reinstalle No violations or deviations were identifie . Liquid Radioactive Wastes (IP 84723)
The inspectors reviewed the licensee's liquid radwaste management
,
programs, including: determination whether changes to equipment and i procedures were in accordance with 10 CFR 50.59; determinau on whether I liquid radioactive waste effluents were in accordance with regulatory requirements; adequacy of required records, reports, and notifications; and experience concerning identification and correction of programmatic weaknesse __ . ._ -
- '
. y
-
.
n
-
The inspectors selcctively reviewed records of planned liquid release sampling, analysie ; quantification,'and release control for 1988 to date. No deviat.ons f?om 10 CFR 20, technical specification, or 00CM requirements were noted. Corrective actions for a previously identified problem concerning incomplete release documentation are discussed in Section 3. Effluent monitor maintenance and secondary calibrations were reviewed; no problems were noted. Primary calibration and secondary /;
primary interface will be reviewed during a future inspectio No violations or deviations were identifie . Gaseous Radioactive Waste (IP 84724)
The inspectors reviewed the licensee's gaseous radwaste management'
program, including: determination whether changes to equipment and procedures were in accordance with 10 CFR 50.59; determination whether gaseous radioactive waste effluents were in accordance with regulatory ;
requirements; adequacy of required records, reports, and notifications; and experience concerning identification and correction of programmatic
,
weaknesse The inspectors cursorily reviewed radioisotopic quantification records ,
for containment vessel purges and pressure reliefs, gas decay tank releases, and continuous releases via the reactor building ven A previously identified problem concerning containment pressure relief release quantifications is discussed in Section 3. Previously' identified problems concerning energy response of the PASS noble gas high range detector, and the stack sample return line, are discussed in Section 3 of Inspection Report No. 50-346/88008(DRSS); a facility change is scheduled for implementation during July 1988 to correct the problems. No additional problems were identified during this inspectio Sampling and analysis meets ttchnical specification requirements and quantification methods appear appropriat No violations or deviations were identified.
'
11. Transportation of Radioactive Materials (IP 86721)
The inspectors reviewed the licensee's transportation of radioactive materials program, including: determination whether written implementing procedures are adequate, maintained current, properly approved, and acceptably implemented; determination whether shipments are in coinpliance with NRC and DOT regulations and the licensee's quality assurance program; adequacy of required records, reports, shipernt documentation, and notifications; and experience concerning i antification and correction of pror,rammatic weaknesse The inspectors selectively reviewed records of radioactive material
'
shipments including radwaste, laboratory samples, and irradiated /
contaminated hardware. The shipments appear to have been made in accordance with NRC and licensee procedural requirements. A review i
of the licensae's main implementing procedure for shipping radioactive
!
4
. ~, - . . . - .- . -
'
.
. . .-
'
hiaterial, Procedure No. RW-4600.00 (DB-HP-01500), indicated several discrepancies betweer the procedure and 49 CFR 172.403 and 173.403(bb)
for dose rate limits at the surface of a package and at 1 meter from the package surface. The licensee was made aware of the discrepancies and agreed to correct the procedure. No violations of DOT requirements resulted from the procedural discrepancie The inspectors also reviewed the licensee's evaluation and documentation of tests made to satisfy 49 CFR 173.415(a). This regulation requires each shipper of a Specification 7A package to maintain on file.a complete
,
documentation of tests and an engineering evaluation or comparative data showing that the construction methods, packaging design, and materials of construction comply with the specification. The licensee, through a consultant, determined that MLM-3245, 00E Evaluation Document for 00T 7A Type A Packaging, March 1987, provides the required test documentation :
for the four packagings frequently used at Davis-Besse. In addition, the licensee is using the consultant's report and shipment-specific documentation to satisfy the engineering evaluation requirement of -F Section 173.415(a) and other requirements in Sections 172-173. The inspectors noted that the consultant suggested that the licensee modify its procedures to incorporate tables and checklists to ensure that use of the packagings continues to be made in accordance with the packaging evaluations. To date in 1988, the licensee has shipped one package of l a Type A quantity of radioactive material; as with other stations, most shipments involve LSA or limited quantit ,
No violations or deviations were identifie . Audit (IP 83729)
The inspectors reviewed the results of a station Quality Assurance Audit
of the radiation control program conducted during May 1988. The Audit was performed by station QA Auditors and contracted specialists; four findings resulted from the Audit. The findings concerned:
- Incomplete postings, mainly on access doors to the new radwaste .
'
- storage facilit * Contamination survey sample counting discrepancie * Use of improper respiratory protection regulator fitting * RadioacMve materials identification discrepancie The findings mainly resulted from failure to fully comply with written
, health physics procedures. Internal responses to the findings were not completed, and thus were not available for review during this inspectio Corrective actions will be reviewed during a future inspection. (0 pen Item 346/08016-01)
No violations or d2viations were identified.
I
I m
. - _ _ _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ - _ _ _ _ ___ , . - s
...
~
.
, ,
,
1 Exit Meeting The inspectors met with licensee representatives (denoted in Section 1)
at the conclusion of the inspection on_ June 17, 1988, to discuss the-scope of the inspection and the findings. The inspectors also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors during the inspectio The license did not identify any such documents / processes as proprietar In response to-certain matters discussed by the inspectors, the licensee: Acknowledgeo i.i.c inspectors' comment about the desirability of providing practic.a1 radiation protection training to new radiation worker (Section 7) Acknowledged the inspectors' comment concerning the apparent need to assure adequate pre-job planning and coordination for all significant radiological wor (Section 8) ;