ML20154Q589
| ML20154Q589 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/14/1998 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20154Q591 | List: |
| References | |
| 50-346-98-14, NUDOCS 9810260017 | |
| Download: ML20154Q589 (2) | |
See also: IR 05000346/1998014
Text
4
&
a
"
4
l
^ <
t
t
l
Octooer 14, 1998
o
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
Centerior Service Company
5501 North State Route 2
Oak Harbor, OH 43449
SU,BJECT:
DAVIS-BESSE INSPECTION REPORT 50-346/98014(DRP)
Dear Mr. Wood:
On September.18,1998, the NRC completed an inspection at your Davis-Besse site. The
enclosed report presents the results of that inspection.
Conscientious and safe operation of the facility was observed during the inspection period.
Plant equipment operated as designed and operators were not presented with any abnormal
operating conditions. Online safety equipment outages were performed well and in accordance
with established procedures. Challenges during the outages were efficiently handled and
safety equipment was restored to service within the allotted outage times.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
original signea by
Thomas J. Kozak, Chief
Reactor Projects Branch 4-
Docket No.: 50-346
License No.: NPF-3
Enclosure:
Inspection Report
.
. 50-346/98014(DRP)
See Attached Distributh.n;
DOCUMENT NAME: G:\\DAVl\\DAV98014.DRP
vo me.iv. . . w w. ooc- unac.i. in m. im c cmumow.n.cw.nci e cm .im n.cw.aci u wo em
OFFICE
Rlli
[
NAME
Kozak/ml
DATE
10// /98
OFFICIAL RECORD COPY
"
9810260017 981014
ADOCK 05000346
G
,
.
'
'J. Wood
-2-
cc w/ encl:
J. Stetz, Senior Vice .
President - Nuclear
J. Lash, Plant Manager
.
J. Freels, Manager .
Regulatory Affairs
M. O'Reilly, FirstEnergy. .
State Liaison Officer, State
of Ohio
R. Owen, Ohio Department
' of Health -
.
' C. Glazer, State of Ohio
Public Utilities Commission
Distribution:
. Project Mgr., NRR w/enct
J. Caldwell, Rlli w/enct
C. Peterson, Rlli w/ encl
B. Clayton, Rlll w/enct
'
SRI Davis-Besse w/enci
DRP w/ encl
TSS w/enci-
'
DRS (2) w/enci
Rlli PRR w/enci
' PUBLIC IE-01 w/enci
i
Docket File w/enci
'
- GREENS
IEO (E-Mail)
-
,
. DOCDESK (E-Mail).
j
'/,
1
.
2500.24
.