MAY 181989
.
Docket No. 50-346
'
Toledo Edison Company.
ATTN:
Mr. Donald Shelton
Vice President
Nuclear
Edison P1aza
300 Madison Avenue
i
'
Toledo, OH .43652-
~Gentiemen:
This refers to the routine safaguards inspection conducted by..
Ms. G. M. Christoffer of this office'on February 21 through April .17,
1989, of activities at' Davis-Besse Nuclear Power Station authorized by
NRC Operating License No. NPF-3 and to the discussion of our findings
with Mr. B. Beyer and other members of your staff on February 24, 1989.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During-this inspection, we requested that you provide us with information
on an allegation regarding background screening (RIII-88-A-0170).
We have
concluded that the allegation is not r.ubstant.iated and consider it. closed.
We found your investigation to be adequate and have no additional questions
regarding this matter.
We request that you retain the supporting documentation
for your investigation of this allegation for'a minimum of one year from the
date of this letter.
No violations of NRC requirements were identilied during the course of this
inspection.
Areas examined during this inspection concern a subject matter which
is exempt from disclosure according to Part 73, Title 10, Code of Federal
Regulations, Section 73.21(c)(2).
This information must be handled and
protected in accordance with the provisions uf 10 CFR 73.21.
Consequently,
8905300394 890518
-
ADOCK 05000346
Q
Enclosure ContaIO$
jV
e nFEGU ARDS lNFORMAT
O n
r ru i n % .,
voi tuunnvu h ,, J" M T/ A M
4.n seperation Th.
, . ~ _ .
is
g
w is Decontrolled [8
" " '
,
,
iw
,I
- _ = _ _ _ _
_ _
-
b
.
_ _ _ _ _ - _ _ _ _ _ _ _ _ _
'
>
,
.
,
i m-^
'
vla
U S
--
pg-
piinnnn
ilif V TI
L .
_u uru s VQ
,
y,,
>
.
.
6
-M
Toledo Edison Company
2 g y i g jggg
.
~
-
.
our report of this inspection will.not be placed in the NRC Public Document
'.
Room.
The Non-Safeguards Information attachment to the report (Allegation
.
Review) will be placed in the Public Document Room.
Sincerely,
'
"Orictnal otr;ned Tr,r c. Enc 11n
'
L. Robert.Greger, Chief
.
Reactor Programs Branch
4
Enclosure:
Inspection Report
'
No. 50-346/89007(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
-cc w/ enclosure:
L. Sturz, Plant Manager
'NRR/DRIS/SGB
NRR/DRIS/S1B
NRR/DLPQ/PEB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCP/JCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
James W. Harris, State of Ohio
+-'
Roger Suppes, Ohio
Department of Health
State of Ohio, Public
Utilities Commission
i
j
Enclosure Conta' s
RIII
RI
RII
RIII
c, pgg
Christoffer/ims
Cree
De
te
ger
- * ,Sereration This
~'
n&
fat
5/d8/
V4 I5 Decontrolled
onerm remn
-
uni LUUnitvo 1: 11 viittu h a a v 8 '
I