Forwards Insp Rept 50-346/98-18 on 981110-990102.No Violations Identified.Conduct of Activities at Davis-Besse Generally Characterized by Conservative Plant Operations, & Effective Engineering Involvement in Plant Issues
ML20206S081
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1999
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20206S083 List:
References
50-346-98-18, NUDOCS 9901280106
Download: ML20206S081 (2)


See also: IR 05000346/1998018

Text

. _ _

.w

-e

January 22, 1999

,

.

- Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SUBJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/98018(DRP)

Dear Mr. Wood:

On January 2,1999, the NRC completed an inspection at the Davis-Besse reactor facility. The

enclosed report presents the results of that inspection.

During the 7-weeks covered by this inspection period, the conduct of activities at Davis-Besse

was generally characterized by conservative plant operations, effective engineering involvement

in emerging plant issues, and by ensuring worker dose was maintained as-low-as-reasonably-

achievable. Of particular note was the conservative actions taken in response to the severe

weather effects on the level of Lake Erie. However, the inspectors noted that a plan had not

been developed the ensure silt level in the intake canal was monitored at a frequency sufficient

to ensure it remained low enough to maintain connectivity to the lake when the lake level was

low.

In accordance with 10CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Thomas J Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-346

License No.: NPF-3

f

Enclosure:

Inspection Report 50-346/98018(DRP)

See Attached Distribution

28000d

DOCUMENT NAME: G:\\DAVi\\DAV98018.DRP

>

!~

To receive a copy of this document, andcate in the box "C" = Copy without attach /enci"E" = Copy with attach /encI "N" s No copy

OFFICE

Rlli

Al

Rill

[

Rill

DuPont/ con' Kozak N

4

NAME

DATE

//W91

/ F4U

//

//

!

OFFICIAL RECORD COPY

.1,@ O l

9901280106 990122

r

PDR

ADOCK 05000346

G

PDR

A

.

.

. . .

.

.

. -

. - .-

.

. . . .

.

.

.

o

l

J. Wood

-2-

!

I

cc w/ encl:

J. Stetz, Senior Vice President - Nuclear

l

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, First Energy

.

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

Distribution:

l

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Dyer, Rlli w/ encl

J. Caldwell, Rlli w/enci

l

B. Clayton, Rill w/enci

l

SRI Davis-Besse w/ encl

DRP w/ encl

TSS w/ encl

DRS (2) w/enci

Rlli PRR w/enci

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

l

l

.