ML20137R304

From kanterella
Revision as of 14:37, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-277/85-38 & 50-278/85-37 on 851001,08 & 21-25.No Violations Noted
ML20137R304
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/21/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20137R311 List:
References
NUDOCS 8512050471
Download: ML20137R304 (2)


See also: IR 05000277/1985038

Text

. - _ _ _ _ .

.

o

.

.

-6-

NOV 211985

Docket Nos. 50-277 License Nos. DPR-44

50-278 DPR-56

Philadelphia Electric Company

ATTN: Mr..S. L. Daltroff

Vice President

Electric Production-

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/85-38 and 50-278/85-37

This refers to the routine inspection conducted by Messrs. S. D. Reynolds, Jr.

-and E. H. Gray of this office on October 8 and 21-25, 1985, at the Peach

-Bottom Atomic Power Station, Delta, Pennsylvania, of activities authorized by

NRC License Nos. OPR-44 and DPR-56 and to the discussions of our findings held

by Mr. Gray and Mr. Reynolds with Mr. R. S. Fleischmann of your staff at the

conclusion of their inspections on October 8 and 25, 1985 respectively. This

inspection also relates to the meeting with the licensee conducted by the Office

of Nuclear Reactor Regulation on October 1, 1985.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspect'an, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is-appreciated.

Sincerely,

Original Sirned Pr'

g. AM

Stewart D. Ebne ter, Director

Division of Reactor Safety  ;

Enclosure: Combined NRC Region I Inspection Report Nos. 50-277/85-38 and

50-278/85-37

i- I

h 0.$

OFFICIAL RECORD COPY CIR PB 85-38/37 - 0001.0.0

851205o471 e51121

PDR ADOCK 05000277

G PEWt ,

J

O

- -

Philadelphia Electric Company 2

cc w/ enc 1:

-R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without-Report)

Public Document Room (PDR)

local Public Document. Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

W. Hazelton, MTEB, NRR

R. Gallo, PB 2A, DRP -

G. Gears, LPM, NRR

,

KM

&&Mae {flA *

RI:DRS RI:DRS RI:DRS RI:DRS

Reynolds/ms Gray Wiggins Durr

11///785 11////85 11//'//85 11h o/85

0FFICIAL RECORD COPY CIR PB 85-38/37 - 0002.0.0

11/13/85