Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
, _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _
. Stephen E. :aco 3-31-87 ,
87-12 Fora Approved by Statiun Suporintendant Effectivo Daco 50RC Mtg. No.
STATION PROCEDURE COVER SHEET
( A. IDENTIFICATION Number: E0P 35 ECA-0.2 Rev. 2
Title:
LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED
, Prepared By: H. K. COVIN ;
B. REVIEW
! have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE 4 -
DEPARTMENT HEAD #7 m L, L 46 3'
'g I C. SPECIFIC UNREVIEWED SAFETY QUESTION tVALUATION REQUIRED: ,
Modifies intent of procedure and changes operation of systems as described ir design documents. YES [ ] NO (v]
(If yes, perform written USQ determination and Safety Evaluation, and contact Manager, Safety Analysis Branch to i determine need for Integrated Safety Evaluation.)
ENVIRONMENTAL REVIEW REQUIRED {
(Adverse environmental impact) YES ( ) NO[U[ i D. SPECIFIC SAFETY EVALUATION REQUIRED Affects response of safety systems, performance of systems which may have bee' credited in the safety analysis or non-credited systems whir.h may indirectly affect safety system response. YES ( ) NO ( b],
(If yes, perform written Safety Evaluation and contact Manager, Safety Analysis Branch to determine :
need for Integrated Safety Evaluation.)
E. INTEGRATED SAFETY EVALUATION REQUIRED YES ( ) NO ((
F. PROCEDURE REQUIRES dC/SORC REVIEW (In addition to review, items,with a YES response must be documented in the ROEC'/SORC meeting minutes.) YES [ 4 NO ( )
G. m')SORC APPROVAL SORC Meeting Number f/ (/I/IT y - j 7 .' '.'8 J-88-/C7 i H. APPROVAL AND IMPLEMENTATION The attached ^ ^ ye i s b by approved, and effective on the date below; i J$ / sr Station 75ervice/tInit Superintendent 6 W-[]
Effective Date SF 301 Rev. 9 8810260410 081007 PDR P ADOCK 05000213 pg ,
f
E0P 35 EL., 0.2 Page 1 Rev. 2 O
LOSS OF ALL AC POWER RECOVERY WIT:? $1 REQUIRE 0 Page No. Eff. Rev.
1-7 2 Table 1 2 Table 2 2 O
l G
. i,
}
._ t
- LOSS OF ALL AC PokIR RECOVERY WITH SI E0P 35 ECA D.2 Page 2 Rdv. 2 {
REQUIRED s
, f A. PURPOSE This procedure provides actions to use engineered safeguards systems ;
to recover plant conditions following restoration of ac emergency i power. j i
B. ENTRY CONDITIONS ;
. i This procedure was written for Modes 1, 2, 3, and 4 assuming th*e RCS !
is hot and pressurized. Using this procedure when not in these modes i requires a step by step evaluation to determine if the required j action is att11 applicable to current plant conditions. [
This procedure is entered from j
- 1) E0P 35 ECA-0.0, LOSS Of ALL AC POWER, Step 25, when ac emergency -
. Power is restored and SI is required. !
i
- 2) E0P 35 ECA-0.1, LOSS OF ALL AC POWER RECOVERY WITH0 LIT SI l REQUIRED, Steps 5 and 19, if SI is required. [
O O
s
. LOSS Or ALL AC POWER RECOVERY WITH SI E0P 35 ECA-0.2 Page 3 REQUIRED Rev. 2 gs [
\
-- STEP ACTKH4-EXPECTED RESPON83 RESPONSE NOT COTAINED ,
NOTE CSF status trees should be monitored for information only. Other Functional Response Procedures should not beimpfementedpriortocompletionofStep7.
1 Check RWST Level > 520,000 gal Establish cold les recirculation
- a. Manually align valves to /
establish cold leg recirculation alignment per Table 1 .
- b. Go to Step 3.
2 Manually Align Valves To Establish SI Injection Alignment per Table 2 l
3 Check RCP Thermal Barrier RFCCW Isolation Status j a. All RPCCW thermat a. Manually isolate RPCCV to i barrier return valves - RCP thermal barriers CLOSED 1. CLOSE RPCCW thermal barrier valves.
9R
- 2. CLOSE RDCCW return isolation valves outside containment.
4 Check if Containment Rectre Pumps should be started
- 4. ECCS valves - ALIGNED a. .!F ECCS valves lined up TOR COLD LEG for 51 injection, THF_N RECIRCULATION Go To Step 4.d.
- b. START Containment keetre pumps lined up tor cold leg rectreulatton
- c. Go to Step 5
- d. IF RCS pressure < 390 psia d. Go to Step 5 THEN start RHR pwtps O
co:ua 3 e4
. Lvs5 Of ALL AC FUVLk hECuVERY Willi SI E0P 35 ECA-0.2 Page 4 REQUIRED Rev. 2 O
(
- STEP ACTION IXPECTED RESPONSE RESPONS8 NOT CSTAINED CAUTION The loads placed on the energized ac emergency bus should not exceed the capacity of the power source.
NOTE If both emergency buses are available, try to equalize loads on both bu'ses.
5 Manually Load Following Safeguards Equipment On AC Emergency Bus
- a. RPCCW punip
- b. SI oump l c. PZR heaters
- d. Available containment air recirculation fans
- c. CRDM Cooling Fan
- f. Auxiliary Building Filter Exhaust fans
- g. Control 'Juilding liVAC C'.t l l e r
- h. One Int t rument Rack room /
Computer room A/C Unit
- i. Fuel Building Initer Exhaust Fans J. Fuel pool cooling pump c n:*s - < s s<
__________________-_____________)
, Luds uk ALL AG NhEN RECOVERY WITH SI E0P 35 ECA-0.2 Page 5 REQUIRED Rev. 2 r 'h h)
STEP ACTION EXPECTED RESPONSE RESPONSE ACT OSTAINED 6 Check If Charging Pump Should Be Started
- a. Check charging pumps - ALL a. Go to Step 7.
STOPPED
- b. Check RCP seal supply b. IF valves open or isolation valves outside porition not known, containment - CLOSED THEN manually close valves.
IF valves can NOT be ;
manually closed. THEN loca11* close valves.
Continue with Step 7.
kHEN valves closed, THEN do Step 6c.
- c. START charging pump a
C PS N S- 1 1 44
e i ,
LV3d V: ALL AL (V~= L X KtLuiLM1 WIAH 51 EOF 33 ECA-0.2 Page 5 s REQUIRED Rev. 2 a
-- sTip ACTl0N EXPECTRO milPCNSE RESPON$t NOT OSTAH to .I
~
CAUTION i
- 1. ATV pump suction should be shif ted to the CST if DWST level decreases to < 80,000 gal. l
- 2. If SG narrow range level decreases to l
< 4% (34% for adverse containment) and AFV flow is < 525 gpm, the HD ATV pumps should be manuallv loaded on se emergency bus to supply water to the SGs.
NOTE If MD ATV pump operation is not required, !
pump switches should be main',ained in PULL-TO-LOCK '
to prevent automatic start. i i
,_ _7 Check Intact Sd Levels
- a. Narrow range level a. Maintain ATV flow ;
O > 41 (34% FOR ADVERSE CONTAI NMI.NT)
- 525 gym until narrow range level is
> 4% (34% FOR ADVERSE I CONTAINMENT) in at least l one SG. E i
IF ATW flow NOT > 525 spm, !
THEN Check KD ATV flow i piih valves - OPEN. [
l START MD AFV pur, a a s [
necessary.
I
- b. Control AFV flow to l maintain narrow range [
level between 4% l (34% FOR ADVERSE i CONTA!KMENT) and 50%
i t
l r
owed - t 3 44
e
. LO55 OF ALL AC POWER RECOVERY WlIH SI EOP 35 ECA.O.2 Page 7 REQUIRED Rev. 2 0 -- STEP ACTICHt t1PECTED RESPG.488 RESPONlt NOT OOTAINED NOTE Other Functional Response Procedures may now be implemented as necessary.
8 Place Containment Spray Pump Switches in AUTO
- a. Quench spray ptops
- b. Containment recirculation spray pumps CAUTION
?. RCP thermal barrier cooling should be established slowly to minimize potential introdvetion of steam into the RPCCW system. RCP thermal barrier cooling should not be established to an RCP with excessive seal leakage.
- 2. RCP seal injection should be established slowly (bearing temperature change approximately l'F/ min) to minimize RCP thermal stresses and potential seal failures.
- 3. As part of subsequent recovery actions, RCPs should not be started prior to a status evaluaticA.
9 Establish RCP Seal Cooling
- a. OPEN Train A and B RFCCV containment re'. urn outer isolation valves,
- b. Check CLOSED Charging Header to seals
- c. OPEN seal supply isolation valves
- d. Throttle OPEN Charging H ader to seals 10 Go To EOP 35 E-1. LOS! 0F RIACTOR OR SECONDARY COOLANT Step 1 s, -FINAL-C #1N4 1 3 64
..~-
9
+- LOSS OF ALL AC POWER RECOVERY WITH SI E0P 35 ECA-0.2 Page 1 ^
REQUIRED Rev. 2 l' O i l
1 TABLES &
I Table 1 - Cold Leg Recirculation ECCS Valve Lineup Table 2 - Charging Pump ECCS Flow Valve Lineup 4
i i
4 5
)
i-J
- O ,
{
4 I
{
t I
l i l
I' 1
r 1
l orva : u4 4-- T'MPWwe 7---+n yyry w -
y-Ow'>e m-, W -gg-. .--w-w--w - - -m r.--s --e -e- e 1.r -mn- ww wr M=
LOSS OF ALL AC POWER REcoiERY WITH SI EOP 35 ECA-0.2 Page 1 of 1 REQUIRED Rev. 2
+,J TABLE 1 COLD LEG RECIRCULATION ECCS VALVE LINEUP VALVE FUNCTION POSITION TRAIN A 3SIL*MV8812A RWST/RHR Pump A Suction Isol CLOSED 3R11S*MV8716A RIIR Pump A Hot Leg Injection CLOSED 3RSS*MV20A Recire Pump A Spray Header Isol CLOSED 3RSS*MV8837A Recirc Pump A RIIR Isol OPEN 3SIlf*MV8814 SI Pump A Miniflow Isol CLOSED 3SIH*MV8920 SI Pump B Miniflow Isol CLOSED 3SIL*MV8804A RHR to Charg Pump Suction OPEN 3SWP*MV50A SWP Supply RPCCW Train A CLOSED 35WP*MV54A Rectre Spray HX A Inlet OPEN 3SIH*MV8807A SI/CHG Pumps Suction Xconn OPEN 3CHS*LCV112D RWST to Charging Pump Suetion CLOSED 3SIL*MV8809A RHR Pump A Cold Leg Injection CLOSED TRAIN B 3SIL*MV8812B RWST/RIIR Pump B Suction Isol CLOSED 3RHS*MV8716B RIIR Pump B Hot Leg Injection CLOSED 3RSS*MV20B Recire Spray Pump B Spray Header Isol CLOSED 3RSS*MV8837B Recire Spray Pump B RIIR Isol OPEN 3SIH*MV8813 SI Pumps Master Miniflow Isol CLOSED 3SIL*MV8804B RJIR to SI Pump Suction OPEN 3SWP*MV50B SWP Supply RPCCW Train B CLOSED 3SWP*MV54B Recire Spray HX B Inlet OPEN 3SIH*MV8807B SI/CHG Pumps Suction Xconn OPEN 3CHS*LCV112E RWST to Cha rging Pump Suction CLOSED 3SIH*MV8806 RWST/SI Suction CLOSED 3SIL*MV8809B RHR Pump B Cold Leg Injection CLOSED O
LOSS OF ALL AC POWER RECOVERY WITH SI E0P 35 ECA-0.2 Page 1 of 2 REQUIRED Rev. 2 TABLE 2 CHARGING' PUMP ECCS FLOW VALVE LIhTUP VALVE FUNCTION POSITION .
TRAIN A 3CHS*LCV112D RWST to Charging Suction OPEN 3CHS*LCV112B VCT To Charging Isolation CLOSED -
3CHS*MV8468A RHR to Charging Suction Isol OPEN 3CHS*MV8438A Charging Header Isol OPEN 3CHS*MV8438C Charging Header X-Tie OPEN 3SIH*MV8801A Charging Cold Legs Injection OPEN 3CHS*MV8105 Charging Header Isolation CLOSED TRAIN B 3CHS*LCV112E RWST to Charging Suction OPEN 3CHS*LCV112C VCT To Charging Isolation CLOSED 3CHS*MV8468B RHR to Charging Suction Isol OPEN 3CF~*MV8438B Charging Header Isol OPEN 3SIH*MV8801B Charging Cold Legs Injection OPEN 3CHS*MV8106 Charging Header Isol CLOSED SI PUMP ECCS FLOW VALVE LISTUP ,
VALVE FUNCTION POSITION TRAIN A 3SIH*MV8923A SI Pump A Suction Isol OPEN 3SIH*MV8814 SI Pump A Miniflow Isol OPEN 3SIH*MV8920 SI Pump B Miniflow Isol OPEN 3SIH*MV8821A SI Pump A Cold Leg Injection OPEN 3SIH*MV8802A SI Pump A Hot Leg Injection CLOSED 3SIH*MV8835 SI Cold Leg Injection OPEN TRAIN B 3SIH*MV8806 RWST/SI Suction OPEN 33IH*MV8923B SI Pump B Suction Isol OPEN 3SIH*MV8813 SI Pumps Master Mintflow Isol OPEN 3SIH*MV8821B SI Pump B to Cold Leg Injection OPEN 3SIH*MV8802B SI Pump B to Hot Leg Injection CLOSED O
OPSoe4 2 344
t 4
LOSS OF ALL AC POWER RECOVERY WITH SI E0P 35 ECA-0.2 Page 2 of 2 REQUIRED Rev. 2
..s b
TABLE 2 (cont)
RiiR PUMP ECCS FLOW VALVE LINEUP VALVE FUNCTION POSI' TION TRAIN A 3RHS*MV8701C RHR Loop A RCS Suction Isol CLOSED 3RHS*MV8701A RHR Loop A Isol (Inner) CLOSED 3SIL*MV8812A RWST/RHR Pump A Suction Isol OPEN 3RHS*MV8702A RiiR Loop B Isol (Outer) CLOSED 3RHS*hV8716A RHR Pump A Hot Leg Injection OPEN 3SIL*MV8809A RHR Pump A Cold Leg Injection OPEN 3SIL*MV8804A RHR to Charg Pump Suction CLOSED 3SIH*MV8924 SI/CHG Isolation OPEN 3 Sill *MV8807A SI/CHG Pumps Xconn CLOSED TRAIN B 3RHS*MV8701B RHR Loop A Isol (Outer) CLOSED 3SIL*MV8812B RWST/RHR Pump B Suction Isol OPEN 3RHS*MV8702B RiiR Loop B Isol (Inner) CLOSED p 3RHS*MV8702C RHR Loop B RCS Suction Isol CLOSED 3RHS*MV8716B RHR Pump B Hot Leg Injection CPEN 3SIL*MV8840 RHR fot Leg Injection CLOSED 3SIL*MV8809B RHR Pu,mp B Cold Leg Injection OPEN 3SIL*MV8804B RHR to SI Pump Suction CLOSED 3 Sill *MV8807B SI/ClfG Pump Suction Xconn CLOSED O
OF 5068-2 3-44