STATION PROCEOURE COVER CHEET A. IDENTIFICATION Number E0P 576 Rev. 1 Title RPV LEVEL RESTORAf!0N EMERGENCY PROCEDURE Prepared By W. R. McCollum , | |||
B. REVIEW I have reviewed the above procedure and have found it to be satisfactory. | |||
TITLE $1GNATURE DATE DEPARTMENT HEAD -[ . 2/02/37 h*W h/W YW Z)h1fff C.o. jfRAA dolm C. UNREVIEVE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED: | |||
3 (Significant change in procedure method or scope as described in FSAR) YES[2 NO [ ] ]I (If yes, document in DORC/50RC meeting minutes) | |||
ENVIRONMENTAL IMPACT (Adverse environmental impact) YES [ ] NO [d (If yes, docurcent in PORC/50RC meeting minutes) | |||
D. PROCEDURE REQUIRFS PORC/$0RC REVIEW YES ['f NO [ ] | |||
E. PORC/SORC APPROVAL PORC/SORC Heeting Number /"8['(( | |||
F. APPROVAL AND IMPLEMENTATION The atI. ached procedure is hereby approved, and effective on the date below: | |||
NA 7.~ G sh J ,2o -fj* | |||
Station /ServiceWnit Superintendent Effective Date SF-301 Rev. 6 0010250446 001007 13 DR ADGCK 050 | |||
s RPV L3 vel Restoration E0P 576 Page 1 Rev. 1 | |||
,~., Unit I l' v') | |||
RPV Level Restorhtion Emergency Procedure PAGE NO. EFF. REV. | |||
1-6 1 STEP 5 06JECTIVE5 Enter from CQP | |||
$70 if RPV water level cannot be maintained | |||
> TAF or E0P 577 Upon Deoressurtration b | |||
l Initiate'IC l Release cold leg watar inventory b | |||
t taonsn Injection Lineup Prepare for level restoration d | |||
Monitor RPV tevel/ Pressure Diagnose plant conditions u | |||
late Action Based Upon Parameter Trends and Systee Availability | |||
* GO TC E0P 570 "RPV Level Control" | |||
; GO TO E0P 573 "RP" spray Cooling" | |||
: Go 70 E0P $74 'RPV Steam Cooling" | |||
==References:== | |||
: 1) Emergency Procedure Guidelines, Millstone Unit One | |||
: 2) Emergency Procedure Guidelines, Appendix 8 , | |||
: 3) Emergency Procedure Guidelines, Appendix C | |||
: 4) ACP-QA-3.02, Attachment A ECP 576 RPV Level Restoration | |||
i' I | |||
RPV Level Restoration E0P 576 Page 2 Rev. 1 | |||
. i r | |||
I | |||
: 1. PURPOSE | |||
(%v) ; | |||
The purpose of this procedure is to restore RPV water level to above i top of active fuel. | |||
l l | |||
: 2. ENTRY CONDITIONS 2.1 This procedure is entered from E0P 570 "RPV Level Control" step 3.2 when RPV water level cannot be maintained above the top of the active fuel (TAF = -127),. or E0P 577 upon depressurization. l | |||
: 3. OPERATOR ACTIONS While executing the following steps: ! | |||
E Boron injection is required. | |||
THEN GO TO E0P 575 "RPV Level /Rx Pcwer Control" E RPV water level cannot be determined, RPV Flooding is required, THEN GO TO E0P 578 "RPV Floodir.g". | |||
E RPV Flooding is required for other reasons, LHM GO TO E0P 578 "RPV Flooding". | |||
3.1 Initiate Isolation Candenser 3.2 Line-up for injection and start pumps in two or more of the following normal injection subsystems: | |||
3.2.1 Condensate /Feedwater 3.2.2 LPCI A 3.2.3 LPCI B 3.2.4 Core Spray A 3.2.5 Core Spray B E0P 576 RPV Level Restoration | |||
RPV Level Restoration E0P 576 Page 2a | |||
- Rev. 1 . | |||
) | |||
) l | |||
: 1. C04171045 REQUIRING RPV Floo0!NC A. RPY Level control (EOP $70) | |||
: 1. RPY water level cannot be deteraleed. | |||
B. Centatteent Control (E0P 540) | |||
I | |||
: 1. Drywell temperature reaches the RPY Saturation Te'perature. | |||
e | |||
: 2. Suppression Chamber pressure cannot be saintained below the Primary Containment Design Pressure. | |||
C. RPV Level Restoration (EOP $76) | |||
: 1. RPV water ieval cannot be determined. | |||
4 | |||
: 0. RPV Level /h Power (EOP 575) | |||
: 1. RPV water level cannot be determined, and h Power cannot be determined or maintained above 85. | |||
II. 8090N INJECT!04 IEQUIREMENTS 6 | |||
A. h Power Control (EOP 572) | |||
: 1. If the h is not shut down and Suppression Pool Temperature reaches 110*F. | |||
l E0P 576 RPV Level Restoration | |||
RPV Level Restoration E0P 576 Page 3 | |||
. Rev. 1 O | |||
sj NOTE Completion of step 3.3 is not necessary for execution of step i 3.4. i 1 | |||
3.3 E at least two normal injection subsystems (step 3.2) can not be lined up, line-up as many of the following alternate injection subsystems as possible, BUT 00 NOT INJECT 3.3.1 SLC Test Tank ''OP 304". | |||
3.3.2 M/U Water to SLC System "0P 304". | |||
3.3.3 Boron Tank to SLC System "0P 304". | |||
3.3.4 CRD Pump Test Line "0P 302". | |||
3.3.5 CST to LPCl/CS "0P 335". | |||
3.3.6 Fire System "0P 332A". | |||
3.3.7 ESW to ECCS X-Tie "00 335" 3.4 Monitor RPV pressure and water level. Continue in this procedure at the step indicated in the following table. | |||
RPV Pressure Region High* (> 33n psig) LO(< 330 psig) | |||
$ '$ RISING ~ | |||
3.5 3.6 | |||
?%* | |||
m :n 3 LOWERING 3.7 3.8 l | |||
*RPV pressure at which Core Spray Pump shut-off-head is reached. | |||
EOF 576 RPV t.evel Restoration | |||
l RPJ Level Restoration E0P 576 Page 4 Rev. 1 b')' While executing the following steps: | |||
E the RPV water level trend reverses or RPV pressure changes region, THEN GO T0 step 3.4 of this procedure. | |||
E RPV water level drops to -48" THEN prevent automatic RPV depressurization by depressing the APR Timer Reset pushbutton and CONTINUE to reset every minute UNTIL, | |||
* RPV water level is o -48", @ | |||
Drywell pressure is < 2 psig and the "High Drywell Pressure Reset" key is in the resat position, OR All Core Spray and LPCI pumps are not running, AND the "APR Auto-Blowdown A/C Interlock" alarm is clear. | |||
3.5 RPV level rising end RPV pressure > 330 psig. | |||
3.5.1 IF RPV water level is > -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.2 IF RPV water level is < -127" AND Undensate/Feedwater is available, THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.3 IF RPV water level is < -127" AND E ndensate/Feedwater is not available, THEN GO TO E0P 577 "Emergency RPV Depressurization". | |||
: 3. 6 RPV level rising and RPV pressure < 330 psig. | |||
3.6.1 E RPV pressure is rising, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.6.2 E RPV pressure is M rising, WHEN RPV water level reaches -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3. | |||
E0P 576 RPV Level aestoration | |||
RPV Level Restoration E0P 576 Page 4a Rev.1 , | |||
ICC5 AUTO-lm!TIATION ) i I | |||
j APR - Drywell Hi Pressure (2 psig) M RPV Low Low Water Level ( 44") M AC !.'.terlock (1 C5 or 1 LPCI) M 120 Sec finer (Timed out) | |||
Core Spray | |||
* Orywell Hi Pressure (2 pelg) M | |||
* RPV Low-Low we'.or Level ,(+44") WITH 68 APV Pressure '.aw ( 00-350 psig) $ | |||
I LPCI | |||
* Drywell Hi Pressure (2 psig) M a RPV Low-Low Water Level (-44") WITH RPV Pressure Low (300-350 psil) | |||
) | |||
l l | |||
E0P $76 RPV l.evel Restoration | |||
r> | |||
RPV Level Restoration E0P 576 Page 5 Rev. 1 - | |||
(D 3.7 RPV level lowering and RPV pressure > 330 psig. | |||
V 3.7.1 H, Condensate /Feedwater is not operating, THEN attempt to start Condensate /Feedwater. | |||
3.7.2 LF, CRD is not operating, THEN attempt to start CRD 3.7.3 E CRD is not operating, AND IF at least two normal injection subsystems are IIned-up for injection with pumps running, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.7.4 E CR0 is rot operating, AND IF no normal injection subsystem.is lined-up Tor injection with at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure). | |||
~ | |||
NOTE For Hydrogen / oxygen control following a LOCA, refer to section 7.6 of OP 311. | |||
3.7.5 WHEN RPV level approaches -127" (TAF), | |||
E any system, or normal injection subsystem, or a? ternate injection subsystem is lined-up with at least one pump running. | |||
THEN GO TO E0P 577 "Emergency RPV Depressurization". | |||
IF no system, or normal injection su'> system, or aTternate injection subsystem is liaed-up with at least one pump running, THEN GO TO E0P 574 "RPV Steam Cooling". | |||
E0P 576 RPV Level Restoration | |||
RPV Level Restoration E0P 576 Page 6 | |||
* Rev. 1 0 3.8 RPV water level lowering and RPV pressure < 330 psig. ; | |||
3.8.1 IF no normal injection system is lined-up for injection Eth at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure). | |||
3.8.2 g RPV pressure is rising, THEN GO TO E0P 577 "Eu egency RPV Depressurizatior". | |||
WHEN RPV water level drops to -127" (TAF), | |||
THEN GO TO E0P 573 "RPV Spray Coeling". | |||
WRM: dip O | |||
FINAL 0 | |||
"CP ~;75 iPV *.evel iustoration | |||
,}} |
Latest revision as of 10:46, 30 December 2020
ML20205A274 | |
Person / Time | |
---|---|
Site: | Millstone, Haddam Neck, 05000000 |
Issue date: | 06/03/1988 |
From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
To: | |
Shared Package | |
ML20204H467 | List:
|
References | |
EOP-576, NUDOCS 8810250446 | |
Download: ML20205A274 (9) | |
Text
-
r E.J. Hroczka 8-25-03 -
corm $cproved by Station Suoerintendent Effective Date t
)
STATION PROCEOURE COVER CHEET A. IDENTIFICATION Number E0P 576 Rev. 1 Title RPV LEVEL RESTORAf!0N EMERGENCY PROCEDURE Prepared By W. R. McCollum ,
B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE $1GNATURE DATE DEPARTMENT HEAD -[ . 2/02/37 h*W h/W YW Z)h1fff C.o. jfRAA dolm C. UNREVIEVE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
3 (Significant change in procedure method or scope as described in FSAR) YES[2 NO [ ] ]I (If yes, document in DORC/50RC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact) YES [ ] NO [d (If yes, docurcent in PORC/50RC meeting minutes)
D. PROCEDURE REQUIRFS PORC/$0RC REVIEW YES ['f NO [ ]
E. PORC/SORC APPROVAL PORC/SORC Heeting Number /"8['((
F. APPROVAL AND IMPLEMENTATION The atI. ached procedure is hereby approved, and effective on the date below:
NA 7.~ G sh J ,2o -fj*
Station /ServiceWnit Superintendent Effective Date SF-301 Rev. 6 0010250446 001007 13 DR ADGCK 050
s RPV L3 vel Restoration E0P 576 Page 1 Rev. 1
,~., Unit I l' v')
RPV Level Restorhtion Emergency Procedure PAGE NO. EFF. REV.
1-6 1 STEP 5 06JECTIVE5 Enter from CQP
$70 if RPV water level cannot be maintained
> TAF or E0P 577 Upon Deoressurtration b
l Initiate'IC l Release cold leg watar inventory b
t taonsn Injection Lineup Prepare for level restoration d
Monitor RPV tevel/ Pressure Diagnose plant conditions u
late Action Based Upon Parameter Trends and Systee Availability
- GO TO E0P 573 "RP" spray Cooling"
- Go 70 E0P $74 'RPV Steam Cooling"
References:
- 1) Emergency Procedure Guidelines, Millstone Unit One
- 2) Emergency Procedure Guidelines, Appendix 8 ,
- 3) Emergency Procedure Guidelines, Appendix C
i' I
RPV Level Restoration E0P 576 Page 2 Rev. 1
. i r
I
- 1. PURPOSE
(%v) ;
The purpose of this procedure is to restore RPV water level to above i top of active fuel.
l l
- 2. ENTRY CONDITIONS 2.1 This procedure is entered from E0P 570 "RPV Level Control" step 3.2 when RPV water level cannot be maintained above the top of the active fuel (TAF = -127),. or E0P 577 upon depressurization. l
- 3. OPERATOR ACTIONS While executing the following steps: !
E Boron injection is required.
THEN GO TO E0P 575 "RPV Level /Rx Pcwer Control" E RPV water level cannot be determined, RPV Flooding is required, THEN GO TO E0P 578 "RPV Floodir.g".
E RPV Flooding is required for other reasons, LHM GO TO E0P 578 "RPV Flooding".
3.1 Initiate Isolation Candenser 3.2 Line-up for injection and start pumps in two or more of the following normal injection subsystems:
3.2.1 Condensate /Feedwater 3.2.2 LPCI A 3.2.3 LPCI B 3.2.4 Core Spray A 3.2.5 Core Spray B E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 2a
- Rev. 1 .
)
) l
- 1. RPY water level cannot be deteraleed.
B. Centatteent Control (E0P 540)
I
- 1. Drywell temperature reaches the RPY Saturation Te'perature.
e
- 2. Suppression Chamber pressure cannot be saintained below the Primary Containment Design Pressure.
C. RPV Level Restoration (EOP $76)
- 1. RPV water ieval cannot be determined.
4
- 1. RPV water level cannot be determined, and h Power cannot be determined or maintained above 85.
II. 8090N INJECT!04 IEQUIREMENTS 6
A. h Power Control (EOP 572)
- 1. If the h is not shut down and Suppression Pool Temperature reaches 110*F.
l E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 3
. Rev. 1 O
sj NOTE Completion of step 3.3 is not necessary for execution of step i 3.4. i 1
3.3 E at least two normal injection subsystems (step 3.2) can not be lined up, line-up as many of the following alternate injection subsystems as possible, BUT 00 NOT INJECT 3.3.1 SLC Test Tank OP 304".
3.3.2 M/U Water to SLC System "0P 304".
3.3.3 Boron Tank to SLC System "0P 304".
3.3.4 CRD Pump Test Line "0P 302".
3.3.5 CST to LPCl/CS "0P 335".
3.3.6 Fire System "0P 332A".
3.3.7 ESW to ECCS X-Tie "00 335" 3.4 Monitor RPV pressure and water level. Continue in this procedure at the step indicated in the following table.
RPV Pressure Region High* (> 33n psig) LO(< 330 psig)
$ '$ RISING ~
3.5 3.6
?%*
m :n 3 LOWERING 3.7 3.8 l
- RPV pressure at which Core Spray Pump shut-off-head is reached.
EOF 576 RPV t.evel Restoration
l RPJ Level Restoration E0P 576 Page 4 Rev. 1 b')' While executing the following steps:
E the RPV water level trend reverses or RPV pressure changes region, THEN GO T0 step 3.4 of this procedure.
E RPV water level drops to -48" THEN prevent automatic RPV depressurization by depressing the APR Timer Reset pushbutton and CONTINUE to reset every minute UNTIL,
- RPV water level is o -48", @
Drywell pressure is < 2 psig and the "High Drywell Pressure Reset" key is in the resat position, OR All Core Spray and LPCI pumps are not running, AND the "APR Auto-Blowdown A/C Interlock" alarm is clear.
3.5 RPV level rising end RPV pressure > 330 psig.
3.5.1 IF RPV water level is > -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.2 IF RPV water level is < -127" AND Undensate/Feedwater is available, THEN GO TO E0P 570 "RPV Level Control", step 3.3. l 3.5.3 IF RPV water level is < -127" AND E ndensate/Feedwater is not available, THEN GO TO E0P 577 "Emergency RPV Depressurization".
3.6.1 E RPV pressure is rising, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.6.2 E RPV pressure is M rising, WHEN RPV water level reaches -127" THEN GO TO E0P 570 "RPV Level Control", step 3.3.
E0P 576 RPV Level aestoration
RPV Level Restoration E0P 576 Page 4a Rev.1 ,
ICC5 AUTO-lm!TIATION ) i I
j APR - Drywell Hi Pressure (2 psig) M RPV Low Low Water Level ( 44") M AC !.'.terlock (1 C5 or 1 LPCI) M 120 Sec finer (Timed out)
- Orywell Hi Pressure (2 pelg) M
I LPCI
- Drywell Hi Pressure (2 psig) M a RPV Low-Low Water Level (-44") WITH RPV Pressure Low (300-350 psil)
)
l l
E0P $76 RPV l.evel Restoration
r>
RPV Level Restoration E0P 576 Page 5 Rev. 1 -
(D 3.7 RPV level lowering and RPV pressure > 330 psig.
V 3.7.1 H, Condensate /Feedwater is not operating, THEN attempt to start Condensate /Feedwater.
3.7.2 LF, CRD is not operating, THEN attempt to start CRD 3.7.3 E CRD is not operating, AND IF at least two normal injection subsystems are IIned-up for injection with pumps running, THEN GO TO E0P 577 "Emergency RPV Depressurization" 3.7.4 E CR0 is rot operating, AND IF no normal injection subsystem.is lined-up Tor injection with at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure).
~
NOTE For Hydrogen / oxygen control following a LOCA, refer to section 7.6 of OP 311.
3.7.5 WHEN RPV level approaches -127" (TAF),
E any system, or normal injection subsystem, or a? ternate injection subsystem is lined-up with at least one pump running.
THEN GO TO E0P 577 "Emergency RPV Depressurization".
IF no system, or normal injection su'> system, or aTternate injection subsystem is liaed-up with at least one pump running, THEN GO TO E0P 574 "RPV Steam Cooling".
E0P 576 RPV Level Restoration
RPV Level Restoration E0P 576 Page 6
3.8.1 IF no normal injection system is lined-up for injection Eth at least one pump running, THEN start pumps in the alternate injection subsystems which are lined-up for injection (step 3.3 of this procedure).
3.8.2 g RPV pressure is rising, THEN GO TO E0P 577 "Eu egency RPV Depressurizatior".
WHEN RPV water level drops to -127" (TAF),
THEN GO TO E0P 573 "RPV Spray Coeling".
WRM: dip O
FINAL 0
"CP ~;75 iPV *.evel iustoration
,