IR 05000321/1988021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20205H053
| number = ML20205H053
| issue date = 10/18/1988
| issue date = 10/18/1988
| title = Ack Receipt of 880920 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/88-21 & 50-366/88-21
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/88-21 & 50-366/88-21
| author name = Ernst M
| author name = Ernst M
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8810280380
| document report number = NUDOCS 8810280380
| title reference date = 09-20-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 23:00, 6 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/88-21 & 50-366/88-21
ML20205H053
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/18/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8810280380
Download: ML20205H053 (2)


Text

hq

- -

-

-

.

' t 00T 181988 Docket Nos. 50-321, 50-366 License Nos. OPR-57, hPF-5 A eorgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President -

Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC I 13PECTION REPORT i!05. 50-321/88-21 AND 50-366/88-21 .

Thank you for your response of September 20, 1988, to our Notice of Violation issued on August 23, 1988, concerning activities conducted at your Hatch facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, NbAv. 0A h S>< Malcolm L. Ernst Acting Regional Administrator cc: d . P. Mcdonald. Executive Vice President, Nuclear Operations

/J. T. Beckham, Vice President, Plant Hatch A4. C. Nix, General Manager, Plant Hatch A. M. Fraser, Site Quality Assurance Manager vi.. T. Gucwa, Manager Licensing and Engineering, Plant Hatch

/S. B. Tipps, Manager of Nuc1 car Safety and Compliance State of Georgia bec: (See page 2)

I k

es102G03GO G91V18 DR ftDOCK 0500 ]1 ,

TEcI

-

-

d n

'

Georgia Power Company 2 00T .181988 be . P. Crocker, NRR M. V. Sinkule, R11 NRC Resident Inspector DRS, Technical Assi; tant Document Control Dc A

,

RII RII RII RI R OWard:*.. GWiseman Tdn17n AHerdt AG'ik son 10//l /88 10/0 /88 10/l('/88 10/i v/88 10/$/88 I

RII RII RII<

AV '/

MSii1kul e enkins JStqhr 10/pt/83 10//f/88

-

0,t$/88