| {{Adams | | {{Adams |
| | number = ML20245A272 | | | number = ML20247K858 |
| | issue date = 06/14/1989 | | | issue date = 09/06/1989 |
| | title = Ack Receipt of 890531 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/89-05 | | | title = Ack Receipt of 890531 & 0831 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/89-05 |
| | author name = Milhoan J | | | author name = Milhoan J |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
Line 10: |
Line 10: |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = NUDOCS 8906210181 | | | document report number = NUDOCS 8909220041 |
| | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
| | page count = 2 | | | page count = 2 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:, .. | | {{#Wiki_filter:., |
| j
| | , .- . |
| ;
| | [ .# y, |
| .. ; .,
| | [ a :- |
| -
| | " |
| JUN 1A1RB In Reply Refer To:
| | SEP 6 59 |
| Docket: STN 50-482/89-05-I Wolf. Creek Nuclear Operating Corporation ATTN: Bart D. Withers President and Chief Executive Officer i P.O. Box 411 i Burlington, Kansas 66839 l i' | | > In Reply Refer To: |
| Gentlemen:
| | ' Docket: STN 51 482/89-05 . |
| Thank you for.your letter of May 31, 1989, in response to our letter and Notice of Violation dated May 1, 1989. We have reviewed your reply and find it i responsive to the concerns raised in our Notice of Violation. We will. review the implementation of your corrective actions during a future inspection to . | | -Wolf Creek Nuclear Operating Corporation ATTN: Bart D. Withers President and Chief. Executive Officer P.O. Box 411 Burlington, Kansas 66839 |
| determine that full compliance has been achieved and will be maintaine j | | 'Gentiemen: |
| !
| | Thank you' for your letters of May 31, 1989, and August 31, 1989, in response to our letters and Notice of Violation dated May 1 and June 14, 198 We have reviewed your reply and find it responsive to the concerns raised in our Notice of' Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine |
| | |
| | Sincerely, OdWnalSigned By: |
| | Thomas P.Gwynn James L. Milhoan, Director Division of Reactor Projects cc: |
| | Wolf Creek Nuclear Operating Corporation ATTN: Otto Maynard, Manager Regulatory Services P.O. Box 411 Burlington, Kansas 66839 Wolf Creek Nuclear Operating Corporation ATTN: Gary Boyer, Plant Manager |
| | ; |
| | P.O. Box 411 Burlington, Kansas 66839 ! |
| | |
| | I i |
| | RIV:DRP/D$ C:DRP/D , |
| | D. RP 1 DMHunnicutt;df EJHoller # |
| | M LMilhoan '\ |
| | 9/6 /89 9/4 /89 9/ h/89 8909220041 890906 /v 6\ ! |
| | ADOCK 05000482 / l PDR rDu |
|
| |
|
| Sincerely, j
| | _ __-_Q |
| Original Signed By I
| |
| '
| |
| L4lA g 62 % h906 oo 4 N h James L. Milhoan, Director o Division of Reactor Projects Enclosure:
| |
| Wolf Creek Letter WM 89-0161 l
| |
|
| |
|
| C ;
| | c i g,= a |
| Wolf Creek Nuclear Operating Corporation !
| | - |
| | pi |
| | , |
| | , |
| | ,m. .. r . ,a , |
| | , |
| | ,,+,. , |
| | s,.. |
| | . |
| | , |
| | h; |
| | . . |
| | ~- |
| | n., . ., |
| | s_ ., :.. |
| | . .. . |
| | ., , |
| | - |
| | ^' |
| | . |
| | ' |
| | L .U f *^ i Sh # ' d ,'O, ', '. .\ 1 ' i |
| | ' ' ' |
| | 55 t; |
| | ', |
| | ,- |
| | |
| | m |
| | # y:>x; 4ll |
| | , |
| | . |
| | ' ' ' ' |
| | g.NEO ; " m f" ! l ' |
| | ; g, 'k:y g |
| | - ' |
| | , 3 1 |
| | ) |
| | m |
| | , |
| | , , |
| | , |
| | , , |
| | , |
| | , |
| | o, e o s o; |
| | . . |
| | a , |
| | -, |
| | - , y 1: 'l, %:. . ? 'w' ' " ' |
| | s' .L< , s |
| | )' |
| | , . |
| | , ; |
| | j b! ' th .! , |
| | ' '" |
| | [g' h m a; i w. , b; ' |
| | , |
| | , , |
| | ,. |
| | '4 ' - - - |
| | , |
| | ; , , , , , |
| | Mw# ; * |
| | . |
| | .. L . |
| | %g ; Wolff Creek! Nuclear Operidng --2-/ . |
| | '' |
| | Vf -% Corporation 1 - |
| | > |
| | , . , ,.. |
| | ,. + x: ~ t > |
| | ' ' |
| | ,o |
| | ' |
| | )]e u,.'s |
| | ;j :. , %f~- 'i' l.' l ts . . . . |
| | , , |
| | ' ' |
| | < |
| | , e l |
| | q_ |
| | > |
| | jC' Kansas Corporation /Comission Ji: , 4 < .. |
| | "- |
| | ' |
| | . p' |
| | f.W , : ATTN::. Robert D. - Elliottb Chief Enginee ' |
| | " + |
| | s* ' |
| | m.nc - ;. Fourth' Floor,' Docking. State Office Building- * |
| | 'e |
| | '2D;fBTopeka,Kansasi66612-15731 - |
| | ,. e y-. s :b e.,, |
| | , , |
| | .gc |
| | .gf - - ',*- |
| | - |
| | . . ,., , |
| | V, r.?r(Kansas? . Radiation Control; Program Directo k |
| | ',{ . .l ' i 4 |
| | ' |
| | ""(, -z't , ''o,- ., > 'y,,Fe t. . . |
| ' | | ' |
| ATTN: Otto Maynard, Manager of Licensing l P.O. Box 411 , !
| | t- 5 - |
| Burlington, Kanas 66839 :
| | .I |
| )
| | ;bectoDMB;(IE01)'. .e |
| Wolf Creek Nuclear Operating Corporation ;
| | . |
| ATTN: Gary Boyer Plant Manager '
| | ,. , |
| P.O. Box 411 l Burlington, Kansas 66839 . !
| | . .-F .. j,- |
| Kansas Corporation Conrnission ,
| | g .. . bec distrib',,6 '.by RIV:' . .4 |
| ATT4 Rcbert D. Elliott, Chief Engineer Fourth Floor, Docking State Office Buildin Topeka, Kansas 66612-1571 Kansas Radiation Control Program Director -
| | - |
| RIV:DRP/Dh D: h/ . | | ;>.* .RRI . N ,2 R.-D.1 Martin,.RA- |
| '
| | " |
| DMHunnicutt;df EJHoller JLMilhoan
| | - |
| ' I 6//4/89 6/4/89 6/g/89 i | | cSectioniChief (DRP/D)- -DRP; . . |
| -- ___ _ _ _ - - -Q
| | ' |
| | ' |
| | ;RPB-DRSSf ' |
| | 'R. DeFayette, RIIIL < |
| | SRI, Callaway, RIII |
| | ' ' |
| | RIV:FileJ ,, |
| | > |
| | <;%e < MIS' Syste i RSTS 0)erator : |
| | lfFW ProjectEngineer(DRP/D); .. . |
| | . :Lisa;Slea,.RM/ALF * |
| | DL V. Pickett.s NRR Project Manager (MS: 130-18) 7 DRS |
| | :p , |
| | , |
| | , |
| | y |
| | ' |
|
| |
|
| - _ - _
| | '\l g |
| _,
| | # 5 |
| _
| | . >:>< |
| 'i
| | , |
| * *
| | ' |
| . | |
| ;
| |
| ;
| |
| Wolf Creek Nuclear Operating -2- I Corporation ;
| |
| i
| |
|
| |
|
| l
| | , , |
| !
| | fl7 ,. , |
| bec to DMB (IE01)
| | , ., i':' _ |
| !
| | - ' !, l 1 7,. |
| '
| | t1 ' . [, :,.k,' |
| I bec distrib. by RIV:
| | s q . |
| RRI R. D. Martin, RA SectionChief(DRP/D) DRP
| | ,. |
| .RPB-DRSS R. DeFayette, RIII RIV File SRI, Callaway, RIII MIS System RSTS Operator Project Engineer (DRP/D) Lisa Shea, RM/ALF DRS D. V. Pickett, NRR Project Manager (MS: 13-D-18) | | * |
| I J
| | as. |
| l i
| |
| !
| |
| !
| |
| ;
| |
| I
| |
|
| |
|
| ;
| | In- |
| l-I
| |
|
| |
|
| - __ _ _ _ _ _ - _ _ _ - - _ _ _ . | | . . |
|
| |
|
| ,, i | | 'l: , [ |
| ' | | ~ . |
| | ','g '' |
| a | | a |
| '* '. l W$LF CREEK NUCLEAR OPERATING CORPORATION Bart D. Withers ,
| |
| Presidint and !
| |
| chief ExecutNo Omoer '
| |
| !,
| |
| May 31, 1989 l WM 89JD16 P f
| |
| * \
| |
| i ,
| |
| W U. S. Nuclear Regulatory Commission ATTN: Document Control Desk j
| |
| !
| |
| M4-2lM i
| |
| { l'
| |
| Mail Station P1-137 __
| |
| Washington, D. C. 20555 y __
| |
| l Reference: Letter dated May 01, 1989 from L. J. Callan, NRC, to B. D. Withers, WCNOC Subject: Docket No. 50-482: Response to Violation 482/8905-01, 02, and 03 Gentlemen Attached is Wolf Creek Nuclear Operating Corporation's (WCNOC) response to violations 482/8905-01, 02, and 03 which were documented in the Referenc Violation 482/8905-01 involved an inoperable fire barrier, 482/8905-02 involved the failure to lock a valve in accordance with procedure, and 482/8905-03 involved the failure to update a drawin If you have any questions concerning this matter, please contact me or M O. L. Maynard of my staf .
| |
| Very truly yours, Bart D. Withers President and Chief Executive Officer BDW/jad Attachment cca B. L. Bartlett (NRC), w/a
| |
| /d ^ ' q Q'
| |
| E. J. Holler (NRC). w/a R. D. Martin (NRC), w/a (N@ h j
| |
| [
| |
| D. V. Pickett (NRC), w/a PO. Box 411/ Dur0ngton, KS 66839 / Phone: (316) 364-8831
| |
| .
| |
| An Equal opportunity Ernpoyer M FHCJVET
| |
| _ - - - - - _ --- -
| |
|
| |
|
| | r3 .o |
| _ | | _ |
| '
| | - |
| e
| | , f |
| . ', | | ?k:f s |
| Attachment to WM 89-0161
| | 'Y,- |
| , Page 1 of 4 Violation (482/8905-01): Inocerable Fire Barrier Findinn: | | . |
| TS 6.8.1 requires that written procedures be established, implemented, and maintained for, among other things, the fire protection program. Procedure ADM 13-103, Revision 5, " Fire Protection: Impairment Control," implements procedures for impaired fire protection equipment including degraded fire barriers. ADM 13-103, Section 4, requires that fire protection impainment control permit forms be prepared for all fire protection system impairments i and that entries be made in the fire ptstection impairment control log for l the impairment Contrary, to the above, on February 25, 1989, the NRC inspector identified an open, unsealed, 3/4-inch conduit located between Room 1326 (Fire Area A-14) and Room 1329 (Fire Area A-33) for which no fire impairment had been issued.
| | s- |
| | ! Y |
| | ,r k 8 |
| | , |
| | l,; a~, '! . l; 7:[ ,, .' [:9 , , |
| | .g , |
| | zww.ax _ n a |
| | |
| | , - . - _ _ ___ _ _ _ . - _ _ _ - . |
|
| |
|
| j Reason For Violations l
| | ! ,. |
| ) Investigation into the reason the conduit was not sealed has concluded that the original embedded conduit had been thrown out of level during construction, leaving it undesirable for use as a racewa It was subsequently abandoned and overlooked during penetration sealing activities. Probable cause of this oversight was its similarity in size and l
| | 's lP |
| approximate location to form tie bolt holes present in the are It was j noted through the investigation that this penetration was not previously I
| | *- ' |
| identified on the Turnover Exception Item Lis Based on the investigation, l
| | ,. |
| the failure to take corrective actions is due to personnel oversight at the time of construction turnover.
| | .s y |
| | ~ |
| | ip- W$4.F CREEK NUCLEAR OPERATING CORPORATION l ' |
| | Bart D. Withers Presioent end - |
| | Chief Exacutive offwer August 31, 1989 |
|
| |
|
| l Corrective Steps Which Have Been Taken And Results Achieved:
| | U. S. Nuclear Regulatory Commission |
| Corrective Work Request to seal the unsealed conduit was initiate A Fire Impairment Control Pennit was issued and an hourly fire watch was established on February 28, 198 The impairment permit and fire watch were maintained until grouting of the penetration was completed on March 17, 198 Corrective Steps Which Will Be Taken To Avoid Further Violations:
| | < |
| The unsealed conduit is believed to be an isolated case as no other unsealed penetrations were noted in the are Date When Full Compliance Will Be Achieved:
| | l l I |
| Full compliance has been achieve _ , _ _ _
| |
| ___ ,
| |
| i
| |
| ,
| |
| ';. ,
| |
| ,
| |
| *
| |
| ' Attachment to WM 89-0161 '
| |
| Page 2 of 4 l Violation (482/8905-02): Failure to Lock a Valve in Accordance With L Procedure 1 1 fin 4LBE 1 TS 6.8 1 requires that written procedures shall be established including the j applicable procedures recommended. in'. Appendix A of Regulatory Guide (RG) ;
| |
| 1.33, Rsvision 2, dated February _197 . Appendix A of RG'1.33 states that equipment control (e.g... locking and tagging) should be covered by. written i procedures. Checklist A of AL-120, Revision 11, "Aitxiliary Feedwater Normal' {
| |
| Lineup," requires, in part, that' the handwheel to'the Turbine Driven ]
| |
| Auxiliary Feedwater (TDAFW) Pump Discharge Isolation- Valve AL HV-012 be I lockwired in the neutral positio i l
| |
| Contrary to the above, on February 08, 1989, the NRC inspectors observed l that Jd HV-012 was not lockwired in the neutral positio j i
| |
| Reason For Violation:
| |
| AL HV-012 (TURB DRIVEN AFWP DISCH HDR TO S/G C ISO) was found by the NRC resident inspector with the locking wire and' seal installed but the seal was i not properly crimpe ADM 02-102 (Control of Locked Component Status) and j
| |
| '
| |
| CKL-AL-120 (Auxiliary Feedwater Normal Lineup) requires AL HV-012 to be in
| |
| - | |
| the locked neutral position. The seal and wire are used as a locking device l and are meant to serve as an Administrative Control only. Additionally. AL ]
| |
| HV-012 is specifically identified with a blue valve tag with the required ,
| |
| y " locked neutral" position engraved on the tag to alert personnel of the !
| |
| requirements to treat this valve as a locked component per the requirements l of ADM 02-10 AL HV-012, as well as other required locked components, were !
| |
| verffiedandsecondcheckedon 12/10/88 prior to plant heatup. greater than 200 The cause for AL HV-012 not being properly locked appears to.have been the failure of operations personnel to properly crimp the ^ seal when 1 attaching the locking wire and its sea The seal and wire became !
| |
| disengaged subsequent to the locked valve verification effort and. went undetected until noted by the NRC resident inspecto The locked neutral valve construction prevents effective utilization of a locking wire' and i seal. The method for locking valves full open or full closed precludes this
| |
| , | | , |
| type of proble Corrective Steps Which Have Been Taken And Results Achieved: I The Shift Supervisor. dispatched an operator to verify. ALHV-012 valve position and properly lockwire the valve in the locked neutral positio Operations personnel performed a verification of locked neutral valves to ensure these valves were properly lockwire No discrepancies were identifie Additionall Operations personnel performed a walkdown of locked open and locked closed valves outside of containment to verify that ;
| | ATTN: Document Control Desk gp ., 51989 ,1 Mail Station Pl-137 I'f |
| these valves were properly lockwire _ _ - _ _ _ _ _ _ _ - . -__ _-
| | ; |
| | u% |
| | ,i ! y t |
| | ;. Washington, D..C. 20555 _ . MY |
| | ! |
| | Reference: Letter dated June 7, 1989 from J. L. Milhoan, NRC to B. D. Withers, WCNOC Subject: Docket No. 50-4823: Responce to Request for Additional Information on Violation 482/8905-03 Gentlemens This letter. provides Wolf Creek Nuclear Operating Corporation's (WCNOC) |
| | response to the ' request for additional information documented in the Referenc .The request for additional information was in conjunction with r violation 482/8905-03 involving a failure to updated drawing If you have any questions concerning this matter, please contact me or Mr. O. L.-Maynard of my staf Very truly yours, |
|
| |
|
| i | | , _ |
| | _-A . |
| | Bart D. Withers President and Chief Executive Officor BDW/jad |
| | ' Attachment cca Eartlett (NRC), w/a Holler (NRC), w/a Martin (NRC), w/a Pickett (NRC), w/a RO. Bor 411 ! Berlington, KS 66839 / Phone: (316) 364-8831 An Equal Opportunny Employer M/F/HCrVET h (Q}&) A n & e R ndL |
| | |
| | - |
| | w n~my .. . E 7 |
| | ' |
| | ., p , .\ ?% , s a |
| | #. ' "i -. |
| | h.; +- ' ' |
| | - |
| | [!j-pl;n gi .c 4 |
| | ' |
| | i !** d .-7gttachment to.WH ? 89-0217.- |
| | Page'1:of 11 p |
| | ,, |
| | _ |
| | > |
| | }f _ |
| | .. |
| | E , |
| | Response to Requestifor" Additional ~ |
| | Information Regarding. Violation 482/8905-03:. |
| | : Failure to Update Drawing |
| | 'r-Requests |
| | @ LWolf Creek. Nuclear Operating Corporation's (WCNOC) letter of Nay, 31, 1989; |
| | . |
| | y ' |
| | : states:that,WCNOC-is evaluating several options to enhance drawing controlb |
| | %' .in'the: Control Room. The letterLfurther states that the selected corrective action willsbe, completed:by August 31-, 1989'. Please provide the |
| | ' |
| | > |
| . | | . |
| ..
| | fd supplemental'information describing your selected corrective action within' |
| ,, ' *
| | ! 30 days of' when your evaluation is complete- or ' August 31, 1989,.whichever is-earlier. |
| - ,
| |
| Attachment to WM 89-0161 .
| |
| ~
| |
| Page 3 of 4 l
| |
|
| |
|
| Corrective Steps Which Will Be Taken To Avold-Further Violations:
| | , |
| Due to previous problems with locked neutral valves, Operations management implemented a new method for locking valves required ^ to be in a. locked
| | : s. |
| _ l neutral positio The new method utilizes stainless steel wire and a locking tab as opposed to a lead sea . Operations personnel installed the stainless steel wire. and locking tab on all locked neutral valve An additional verification of locked neutral valves was performed post-installation of the stainless steel wire and locking ' tab with no i discrepancies identifie The Operations department will conduct periodic inspections and verifications. of the locked neutral valves.to verify the j effectiveness of the new method for locking neutral valve ;
| |
| l A letter to Operations personnel describing the new method for locking valves required to be in a locked neutral position has been placed in Operations Required Readin Date When Full Comollance Will Be Achieved:
| |
| i
| |
| . Full compliance has been achieve _
| |
| l Violation (482/8905-03): Failure to Update Drawing Findinn: )
| |
| '
| |
| ?
| |
| 10 CFR Part 50, Appendix B, Criterion V states, in part. .that activities affecting quality shall be prescribed by documented instructions,- J procedures, or drawings and shall be accomplished in accordance with these instruction, procedures, or drawing Licensee Administrative Procedure ADM 01-042, Revision 9 " Plant Modification Request Implementation," Step 5.4.5, !
| |
| requires color coding applicable control room drawings to indicate '
| |
| implementation progress, if a plant modification request (PMR) is partially implemente Contrary to the above, on February 28, 1989, the NRC inspector determined that Drawing M-12ALO1(Q) was not color coded (" redlined") to reflect field I implementation and partial closeout of PMR 00264 in December 198 Reason For Violation:
| |
| Drawing M-12ALO1(Q) had been redlined sometime between 9/09/88 and 9/20/8 ,
| |
| '
| |
| This is based on discussions with personnel involved and from auditor's-notes of a Quality Assurance surveillance on the redline program, then in progres The drawing was excluded from the auditor's problem list in that time period, indicating it had been properly redline A replacement for this drawing had been requested on 9/15/88, apparently because of soiling or damage, after the redlining took place. Mark-ups were not transferred sir.ce the replacement drawing was found unmarked during the NRC inspection on 2/28/8 The replacement drawing remained at revision
| |
| *0', confirming that replacement occurred outside the drawing revision process ( the drawing was re-issued upon request from the Control Room in lieu of being issued due to a revision),
| |
| b _ = __- _ A
| |
|
| |
|
| | > |
| | "Resr>onse n Aspreviouslymentionedin'WCNOC'slletterdatedMay 31,.1989 (WM 89-0161', |
| | . |
| | )' a , |
| | -significant effort has.been expended'to provide plant operators with |
| | . |
| | drawings that, reflect the as-built configuration of the. plant as;'a' result of plant modifications.> > Additional- administrative controls discussed -below~ |
| | h :have been implemented to' enhance the drawing control process in the Control |
| | , Room, k' Administrative procedure ADM 02-014,;Revh 0, " Control of Operations |
| | ,, . Documents *.was issued on August'18,- 1989 to g ovide detailed instructions for. controlling documents used in the Control' Room. This procedure requires |
| | 'that.when replacements, revisiono and/or controlled changes are received for |
| ' | | ' |
| i
| | : |
| * | | g4 |
| o,' l
| | - |
| > ., { | | -Control Room drawings that have been red-lined, the Shift Clerk will have a |
| l
| | . Licensed Operator review the new revision to ensure all red-lined information was incorporated into the document. Any information that was |
| . Attachment to WM 89-0161 ]
| | [ red-lined onto the drawing and not incorporated by the document revision vill be transferred onto the new revision and/ar replacement. drawings, and |
| Page 4 of 4 )
| | , |
| !
| | - will be. reviewed'by the Licer. sed Operator prior to the new document being |
| I I
| | . file ',. |
| Corrective Steps Which Have Been Taken And Results Achieved: 1
| | F l |
| | | , |
| I Drawing H-12AL01 (Q), Rev. O has been redlined to reflect field l implementation and partial closecut of PMR 0026 A letter has been issued
| | f ..' |
| ! to Shift Supervisors and Supervising Operators providing interim l instructions for the replacement of damaged or soiled drawings which have I been redline !
| | 'h i- , |
| l Corrective Steps Which Will Be Taken To Avoid Further Violations: l l
| | . |
| | | . |
| A significant effort has been expended to improve the method for updating I drawings in the Control Room. A Quality Assurance surveillance conducted in l August of 1988 identilled several concerns relative to Control Room i drawing A task force was convened to address these concerns and resulted
| | _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ |
| '
| |
| in various corrective action Procedure ADM 01-042, " Plant Modification j
| |
| '
| |
| Request Implementation" was revised to provide' acceptable methods and !
| |
| ,
| |
| instructions for redlining PMR changes on affected Control Room drawings. A l review of Control Room drawings that require redlining for PMRs that have been installed has been complete A drafting person has been assigned to l perform the redlining of Control Room drawings to provide consistency and j l
| |
| reduce the number of individuals interfacing with changes to Control Room 1 drawing Document Control personnel provided training to the Control Room l shift clerks on drawings and document control method (,
| |
| A verification of corrective action surveillance was performed by Quality l Assurance during May 1989 and identified based upon a sampling of Control Room drawings that redlining was being performed in accordance with procedure ADM 01-04 I WCNOC is evaluating ueveral options to enhance drawing control in the Control Room along with the replacement of damaged or soiled drawing The evaluation and implementation of appropriate administrative controls to enhance the drawing control process will be completed by August 31, 198 Date When Full Compliance Will Be Achieved:
| |
| Full compliance has been achieved and the drawing control process enhancements will be completed by August 31, 198 i
| |
| _m__- _ _ _ - . _ - - - - -
| |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:NRC TO UTILITY
MONTHYEARIR 05000482/19900261990-11-14014 November 1990 Ack Receipt of Responding to NRC Requesting Addl Info Concerning 900731 Notice of Violation from Insp Rept 50-482/90-26 IR 05000482/19900341990-11-0909 November 1990 Forwards Notice of Violation Re Insp Rept 50-482/90-34 & Summary of Enforcement Conference on 901106 ML20058D7601990-11-0101 November 1990 Forwards Summary of Staff Understanding of Current Status Re GSIs Remaining Unimplemented at Facility,Per GL-90-04 ML20058E1391990-10-26026 October 1990 Forwards Final SALP Rept 50-482/90-14 on 900401-0630 ML20058B2831990-10-23023 October 1990 Forwards Insp Rept 50-482/90-34 on 900926-1005.Violations Noted ML20062C9971990-10-19019 October 1990 Forwards Insp Rept 50-482/90-31 on 900801-0914 & Notice of Violation ML20058A3621990-10-18018 October 1990 Advises That Util 900925 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2, 'Vendor Interface for Safety-Related Components,' Acceptable ML20059P0671990-10-15015 October 1990 Ack Receipt of Requesting Withdrawal of Request for Relief Re Procurement of ASME Section III Matls ML20062B3081990-10-0505 October 1990 Forwards Insp Rept 50-482/90-30 on 900730-0810.Violations Noted But Not Cited.Four Open Items Identified ML20059N3091990-10-0101 October 1990 Forwards Insp Rept 50-482/90-28 on 900701-31 & Notice of Violation ML20059M6851990-09-28028 September 1990 Ack Receipt of 900830 Response to Violations Noted in Insp Rept 50-482/90-26.Addl Info Re Troubleshooting Required ML20059M0451990-09-27027 September 1990 Requests Addl Info Re Seismic Design Consideration for safety-related Vertical Steel Tanks.Info Needed within 90 Days Following Receipt of Ltr ML20059J3541990-09-11011 September 1990 Forwards Initial SALP Rept 50-482/90-14 for Apr 1989 - June 1990.Areas of Operations,Radiological Controls,Maint/ Surveillance & Engineering/Technical Support Rated Category 2,while Area of Security & Emergency Remained Category 1 ML20059C4171990-08-23023 August 1990 Accepts Util 890531 Response to NRC Bulletin 88-011 Re Surge Line Stratifiction.Nrc Topical Rept Evaluation Encl ML20059A7431990-08-14014 August 1990 Ack 900808 Visit to Region IV & Info Re Status of Actions on Recent Kansas City Power & Light Co Offer to Purchase Kansas Gas & Electric Co.Util Assurance That Offer to Purchase Will Have No Effect on Safety Operations of Importance to NRC ML20058P2581990-08-14014 August 1990 Ack Receipt of Transmitting Scenario for Upcoming Annual Exercise.Nrc Understands That Util Taking Actions to Resolve Concerns Expressed in FEMA 900727 Memo ML20058P2421990-08-13013 August 1990 Forwards Insp Rept 50-482/90-23 on 900507-11 & 0629-0703 & Notice of Violation.No Response to Violation Required Due to Corrective Action Implemented Prior to Inspectors Departure IR 05000482/19900241990-08-0606 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/90-24.Responses to Training Violation & Unresolved Item Re Min Protective Action Recommendations Responsive to Insp Rept Concerns ML20055J4891990-07-31031 July 1990 Advises That NRC Form 474, Simulation Facility Certification, Submitted on 900110,complete & Requires No Further Info.Simulation Facility Acceptable for Purposes of 10CFR55.31(a)(4) Based on Certification of Facility ML20055J4881990-07-31031 July 1990 Discusses Util 891226 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance ML20056A2851990-07-31031 July 1990 Forwards Insp Rept 50-482/90-26 on 900601-30 & Notice of Violation.Violation Re Failure to Update Info Into Updated FSAR Noted But Not Cited ML20056A1731990-07-30030 July 1990 Advises That Requalification Program Evaluation Scheduled at Plant Site During Wks of 901022 & 29.Util Requested to Furnish Approved Items Listed in Encl 1.Failure to Supply Ref Matl May Result in Postponement of Exam ML20058L3311990-07-27027 July 1990 Summarizes 900724 Meeting W/Util in Region IV Ofc Re Changes to Operator Licensing Program.Meeting Agenda,Attendance List & Viewgraphs Encl ML20055J3971990-07-24024 July 1990 Requests Addl Info Re Steam Generator Tube Rupture Operator Action Times for Plant.Response Requested within 30 Days of Receipt of Ltr IR 05000482/19900171990-07-19019 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/90-17 ML20059N8021990-07-10010 July 1990 Ack Receipt of Transmitting Objective & Guidelines for Upcoming Emergency Preparedness Exercise. Util Exercise Scenario,Submitted on 900628,currently Under Review ML20055F6251990-07-0909 July 1990 Forwards Summary of 900626 Meeting W/Util in Region IV Ofc Re Licensee Performance During Latest Refueling Outage. Attendance List Encl ML20055D9881990-07-0505 July 1990 Forwards Insp Rept 50-482/90-25 on 900611-15.No Violations or Deviations Noted.One Unresolved Item Noted ML20055D9531990-07-0505 July 1990 Forwards Insp Rept 50-482/90-22 on 900501-31.Noncited Violation Noted.One Unresolved Item Identified IR 05000482/19900051990-07-0505 July 1990 Ack Receipt of 900629 & 0413 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/90-05 ML20058K3611990-06-26026 June 1990 Forwards Insp Rept 50-482/90-24 on 900514-18 & Notice of Violation.Unresolved Items Noted Re Discrepancy Between Emergency Plan & Emergency Plan Implementing Procedures Re Min Protective Action Recommendations During Emergency IR 05000482/19900161990-06-26026 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/90-16 ML20055C7671990-06-18018 June 1990 Forwards Insp Rept 50-482/90-27 on 900604-08.No Violations or Deviations Noted ML20059M9091990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248C6401989-09-27027 September 1989 Forwards Insp Rept 50-482/89-25 on 890911-25.No Violations Noted or Deviations Identified ML20248E7801989-09-21021 September 1989 Forwards Amend 4 to Indemnity Agreement B-99.Amend Increases Primary Nuclear Energy Liability Insurance.Util Requested to Submit Signed Amend to Signify Acceptance ML20247N1671989-09-20020 September 1989 Forwards Safety Evaluation Re Plant First 10-yr Inservice Testing Program & Requests for Relief Re Reclassification of 16 Valves from Passive to Active & Clarification of Cold Shutdown Justification ML20247M9531989-09-19019 September 1989 Forwards Insp Rept 50-482/89-22 on 890828-0901.No Violations Noted ML20247K0501989-09-14014 September 1989 Forwards Insp Rept 50-482/89-23 on 890801-31.No Citation for Violation Described in Paragraph 3 Issued,Per Section V.G.1 of NRC Enforcement Policy IR 05000482/19890051989-09-0606 September 1989 Ack Receipt of 890531 & 0831 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/89-05 ML20247B1931989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executives Meeting on 890818 in Arlington,Tx.Topics Discussed Included, Improving Communications,Salp Process in Region IV & Enforcement.List of Attendees & Agenda Encl ML20246F9131989-08-21021 August 1989 Forwards Request for Addl Info Re 880620 Proposed Revs to Tech Specs 3/4.4.9.1 & 3/4.4 9.3, RCS Pressure/Temp Limits & Overpressure Protection Sys, Respectively ML20246D6441989-08-17017 August 1989 Informs That Request to Withdraw Application for Amend to License NPF-42 Granted ML20245J6031989-08-14014 August 1989 Advises That Licensing Exams Scheduled for Wk of 891120.Ref Matl Listed on Encl Should Be Provided by 890920. Procedures for Administration of Written Exams Also Encl ML20245H2921989-08-0808 August 1989 Forwards Insp Rept 50-482/89-21 on 890701-31.No Violations or Deviations Noted ML20247N7251989-07-31031 July 1989 Concurs That Requirements of License Condition 2.C.(7), Attachment 3,Item (2) Re Emergency Response Capabilities Have Been Met,Based on Review of Util & on Past Emergency Preparedness Insps ML20248A2171989-07-31031 July 1989 Forwards Summary of 890623 Meeting at Facility to Discuss SALP for Apr 1988 - Mar 1989 & Util 890721 Response to SALP Rept.Viewgraphs Also Encl ML20247M2321989-07-27027 July 1989 Forwards Insp Rept 50-482/89-17 on 890626-0706.No Violations or Deviations Noted ML20247L3261989-07-26026 July 1989 Forwards Insp Rept 50-482/89-16 on 890601-30.No Violations or Deviations Noted IR 05000482/19890121989-07-24024 July 1989 Ack Receipt of 890419 & 0519 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/89-12. Summary of 890418 Meeting Encl 1990-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20195G3451999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990105,which Transmitted Wolf Creek Emergency Plan Form Apf 06-002-01 Emergency Action Levels, Rev 0,dtd 990105,under Provisions of 10CFR50,App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20195D5111999-06-0202 June 1999 Forwards Safety Evaluation Authorizing Inservice Inspection Program Alternative for Limited Reactor Vessel Shell Weld Exam & Relief Request from Requirements of ASME Code,Section XI for Wolf Creek Generating Station ML20207E2791999-05-25025 May 1999 Announces Corrective Action Program Insp at Wolf Creek Reactor Facility,Scheduled for 990816-20.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML20207A8681999-05-25025 May 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328. as Part of Reorganization,Division of Licensing Project Mgt Created ML20207A3491999-05-21021 May 1999 Forwards Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted ML20206H3901999-05-0707 May 1999 Informs That on 990407,NRC Administered Generic Fundamentals Exam Section of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206H5941999-05-0505 May 1999 Forwards Insp Rept 50-482/99-04 on 990405-09.No Violations Noted.Scope of Inspection Included Review of Implementation of Licensee Inservice Insp Program for Wolf Creek Facility Refueling Outage 10 ML20206H2891999-04-30030 April 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation, for Wcgs.Exemption Related to Application ML20205L8541999-04-0909 April 1999 Forwards Insp Rept 50-482/99-02 on 990207-0320.Five Violations Identified & Being Treated as Noncited Violations ML20205J3371999-04-0606 April 1999 Forwards Request for Addl Info Re Wolf Creek Generating Station IPEEE & 971208 Response to RAI from NRC Re Ipeee. RAI & Schedule for Response Were Discussed with T Harris on 990405 ML20205K4451999-04-0303 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/98-05 & of Need for Larger Scope of Review for Planned C/As for Violation 50-482/98-05,which Requires Extending Completion Time ML20205H7091999-04-0202 April 1999 Discusses 990325 Meeting at Plant in Burlington,Ks to Discuss Results of PPR Completed on 990211 ML20205G5851999-04-0101 April 1999 Forwards RAI Re Licensee 960214 Submittal of 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant. Response Requested within 120 Days of Receipt of Ltr ML20205C2101999-03-26026 March 1999 Informs That NRC Staff Reviewed WCNOC 960918,970317 & 980429 Responses to GL 96-05, Periodic Verification of Design- Basis Capability of Safety-Related Movs. Forwards RAI Re MOV Program Implemented at Wolf Creek Generating Station ML20204H7571999-03-23023 March 1999 Discusses WCNOC 990202 Proposed Rev to Response to GL 81-07, Control of Heavy Loads, for Wcgs.Rev Would Make Reactor Building Analyses Consistent with TS & Change Commitment Not to Allow Polar Crane Hook Over Open Rv.Revs Approved ML20205A4221999-03-19019 March 1999 Advises of Planned Insp Effort Resulting from Wolf Creek Plant Performance Review for Period 980419-990125. Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20207L5941999-03-0404 March 1999 Informs That Staff Accepts Util 981210 Requested Approval for Use of ASME Code,Section III Code Case N-611, Use of Stress Limits as Alternative to Pressure Limits,Section III, Div 1,Subsection NC/ND-3500, for Certain Valve Components ML20207F3121999-03-0303 March 1999 Informs That Info Provided in Entitled, Addl Info Requested for Topics Discussed During Oct 14-15 Meeting, from Wcnoc,Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20207F4491999-03-0303 March 1999 Forwards Signed Copy of Updated Computer Access & Operating Agreement Between NRC & Wcnoc,Per ML20207F0411999-02-26026 February 1999 Informs That KM Thomas Will Resume Project Mgt Responsibilities for Wcngs,Effective 990301 ML20206U6131999-02-0202 February 1999 Forwards Draft SER on Proposed Conversion of Current TSs for Wolf Creek Generating Station to Improved Tss.Encl Draft SER Being Provided for Review to Verify Accuracy & to Prepare Certified Improved TSs ML20202B7391999-01-26026 January 1999 Forwards Insp Rept 50-482/99-01 on 990111-14.No Violations Noted.Nrc Understands That During 990114 Exit Meeting,Vice President,Operations/Chief Operating Officer Stated That Util Would Revise Security Plan ML20199H4671999-01-15015 January 1999 Forwards Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted.Conduct at Wolf Creek Generally Characterized by safety-conscious Operations & Sound Maintenance Activities ML20199B0591999-01-11011 January 1999 Forwards Y2K Readiness Audit Rept for Wolf Creek Nuclear Generating Station.Purpose of Audit Was to Assess Effectiveness of Wolf Creek Nuclear Operating Corp Programs for Achieving Y2K Readiness ML20199A0991998-12-29029 December 1998 Informs That on 981202,NRC Staff Completed Insp Planning Review (Ipr) of WCGS & Advises of Planned Insp Effort Resulting from Ipr.Forwards Historical Listing of Plant Issues,Referred to Plant Issues Matrix IR 05000482/19980121998-12-18018 December 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/98-12.NRC Have Withdrawn Violation 50-482/98-12-02 for First Example Re Procedure AP 05-0001 ML20198B2701998-12-16016 December 1998 Informs That Staff Has Incorporated Rev of Bases for TS 3/4.7.1.2, Afs Into WCGS Tss,Per 981108 Request.Rev Specifies Essential SWS Requirements for turbine-driven Afs. Overleaf Pages Provided to Maintain Document Completeness ML20196K0321998-12-0808 December 1998 Informs That Staff Has Incorporated Rev of Bases for TS 3/4.4.4, Relief Valves, Requested by .Rev Clarifies Bases to Be Consistent with Amend 63 to Wolf Creek TSs .Rev Acceptable.Bases Page Encl 1999-09-29
[Table view] |
Text
.,
, .- .
[ .# y,
[ a :-
"
SEP 6 59
> In Reply Refer To:
' Docket: STN 51 482/89-05 .
-Wolf Creek Nuclear Operating Corporation ATTN: Bart D. Withers President and Chief. Executive Officer P.O. Box 411 Burlington, Kansas 66839
'Gentiemen:
Thank you' for your letters of May 31, 1989, and August 31, 1989, in response to our letters and Notice of Violation dated May 1 and June 14, 198 We have reviewed your reply and find it responsive to the concerns raised in our Notice of' Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine
Sincerely, OdWnalSigned By:
Thomas P.Gwynn James L. Milhoan, Director Division of Reactor Projects cc:
Wolf Creek Nuclear Operating Corporation ATTN: Otto Maynard, Manager Regulatory Services P.O. Box 411 Burlington, Kansas 66839 Wolf Creek Nuclear Operating Corporation ATTN: Gary Boyer, Plant Manager
P.O. Box 411 Burlington, Kansas 66839 !
I i
RIV:DRP/D$ C:DRP/D ,
D. RP 1 DMHunnicutt;df EJHoller #
M LMilhoan '\
9/6 /89 9/4 /89 9/ h/89 8909220041 890906 /v 6\ !
ADOCK 05000482 / l PDR rDu
_ __-_Q
c i g,= a
-
pi
,
,
,m. .. r . ,a ,
,
,,+,. ,
s,..
.
,
h;
. .
~-
n., . .,
s_ ., :..
. .. .
., ,
-
^'
.
'
L .U f *^ i Sh # ' d ,'O, ', '. .\ 1 ' i
' ' '
55 t;
',
,-
m
- y:>x; 4ll
,
.
' ' ' '
g.NEO ; " m f" ! l '
- g, 'k
- y g
- '
, 3 1
)
m
,
, ,
,
, ,
,
,
o, e o s o;
. .
a ,
-,
- , y 1: 'l, %:. . ? 'w' ' " '
s' .L< , s
)'
, .
, ;
j b! ' th .! ,
' '"
[g' h m a; i w. , b; '
,
, ,
,.
'4 ' - - -
,
- , , , , ,
Mw# ; *
.
.. L .
%g ; Wolff Creek! Nuclear Operidng --2-/ .
Vf -% Corporation 1 -
>
, . , ,..
,. + x: ~ t >
' '
,o
'
)]e u,.'s
- j
- . , %f~- 'i' l.' l ts . . . .
, ,
' '
<
, e l
q_
>
jC' Kansas Corporation /Comission Ji: , 4 < ..
"-
'
. p'
f.W , : ATTN::. Robert D. - Elliottb Chief Enginee '
" +
s* '
m.nc - ;. Fourth' Floor,' Docking. State Office Building- *
'e
'2D;fBTopeka,Kansasi66612-15731 -
,. e y-. s :b e.,,
, ,
.gc
.gf - - ',*-
-
. . ,., ,
V, r.?r(Kansas? . Radiation Control; Program Directo k
',{ . .l ' i 4
'
""(, -z't , o,- ., > 'y,,Fe t. . .
'
t- 5 -
.I
- bectoDMB;(IE01)'. .e
.
,. ,
. .-F .. j,-
g .. . bec distrib',,6 '.by RIV:' . .4
-
- >.* .RRI . N ,2 R.-D.1 Martin,.RA-
"
-
cSectioniChief (DRP/D)- -DRP; . .
'
'
- RPB-DRSSf '
'R. DeFayette, RIIIL <
SRI, Callaway, RIII
' '
RIV:FileJ ,,
>
<;%e < MIS' Syste i RSTS 0)erator :
lfFW ProjectEngineer(DRP/D); .. .
. :Lisa;Slea,.RM/ALF *
DL V. Pickett.s NRR Project Manager (MS: 130-18) 7 DRS
- p ,
,
,
y
'
'\l g
- 5
. >:><
,
'
, ,
fl7 ,. ,
, ., i':' _
- ' !, l 1 7,.
t1 ' . [, :,.k,'
s q .
,.
as.
In-
. .
'l: , [
~ .
','g
a
r3 .o
_
-
, f
?k:f s
'Y,-
.
s-
! Y
,r k 8
,
l,; a~, '! . l; 7:[ ,, .' [:9 , ,
.g ,
zww.ax _ n a
, - . - _ _ ___ _ _ _ . - _ _ _ - .
! ,.
's lP
,.
.s y
~
ip- W$4.F CREEK NUCLEAR OPERATING CORPORATION l '
Bart D. Withers Presioent end -
Chief Exacutive offwer August 31, 1989
U. S. Nuclear Regulatory Commission
<
l l I
,
ATTN: Document Control Desk gp ., 51989 ,1 Mail Station Pl-137 I'f
u%
,i ! y t
- . Washington, D..C. 20555 _ . MY
!
Reference: Letter dated June 7, 1989 from J. L. Milhoan, NRC to B. D. Withers, WCNOC Subject: Docket No. 50-4823: Responce to Request for Additional Information on Violation 482/8905-03 Gentlemens This letter. provides Wolf Creek Nuclear Operating Corporation's (WCNOC)
response to the ' request for additional information documented in the Referenc .The request for additional information was in conjunction with r violation 482/8905-03 involving a failure to updated drawing If you have any questions concerning this matter, please contact me or Mr. O. L.-Maynard of my staf Very truly yours,
, _
_-A .
Bart D. Withers President and Chief Executive Officor BDW/jad
' Attachment cca Eartlett (NRC), w/a Holler (NRC), w/a Martin (NRC), w/a Pickett (NRC), w/a RO. Bor 411 ! Berlington, KS 66839 / Phone: (316) 364-8831 An Equal Opportunny Employer M/F/HCrVET h (Q}&) A n & e R ndL
-
w n~my .. . E 7
'
., p , .\ ?% , s a
- . ' "i -.
h.; +- ' '
-
[!j-pl;n gi .c 4
'
i !** d .-7gttachment to.WH ? 89-0217.-
Page'1:of 11 p
,,
_
>
}f _
..
E ,
Response to Requestifor" Additional ~
Information Regarding. Violation 482/8905-03:.
- Failure to Update Drawing
'r-Requests
@ LWolf Creek. Nuclear Operating Corporation's (WCNOC) letter of Nay, 31, 1989;
.
y '
- states:that,WCNOC-is evaluating several options to enhance drawing controlb
%' .in'the: Control Room. The letterLfurther states that the selected corrective action willsbe, completed:by August 31-, 1989'. Please provide the
'
>
.
fd supplemental'information describing your selected corrective action within'
! 30 days of' when your evaluation is complete- or ' August 31, 1989,.whichever is-earlier.
,
- s.
>
"Resr>onse n Aspreviouslymentionedin'WCNOC'slletterdatedMay 31,.1989 (WM 89-0161',
.
)' a ,
-significant effort has.been expended'to provide plant operators with
.
drawings that, reflect the as-built configuration of the. plant as;'a' result of plant modifications.> > Additional- administrative controls discussed -below~
h :have been implemented to' enhance the drawing control process in the Control
, Room, k' Administrative procedure ADM 02-014,;Revh 0, " Control of Operations
,, . Documents *.was issued on August'18,- 1989 to g ovide detailed instructions for. controlling documents used in the Control' Room. This procedure requires
'that.when replacements, revisiono and/or controlled changes are received for
'
g4
-
-Control Room drawings that have been red-lined, the Shift Clerk will have a
. Licensed Operator review the new revision to ensure all red-lined information was incorporated into the document. Any information that was
[ red-lined onto the drawing and not incorporated by the document revision vill be transferred onto the new revision and/ar replacement. drawings, and
,
- will be. reviewed'by the Licer. sed Operator prior to the new document being
. file ',.