Forwards Insp Rept 50-482/89-17 on 890626-0706.No Violations or Deviations Noted
ML20247M232
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/27/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20247M237 List:
References
GL-88-17, NUDOCS 8908020003
Download: ML20247M232 (2)


See also: IR 05000482/1989017

Text

~

,,

. f

..

v  % . '... .-

gy

In Reply Re4r To:

o- -

Docket: STN 50-482/89-17

x

-- Wolf Creek Nuclear Operating Corporation

. ATTN: Bart D. Witherc- '

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

'

Gentlemen:

x

This refers to the inspection conducted by Mr. H. F. Bundy of this office

during the period June 26 through July 6,.1989, of activities authorized by NRC'

Operating License NPF-42. for the Wolf Creek Generating Station, and to the

discussion of our findings with Mr. J. A. Bailey and other members of your

staff at the conclusion of the ansite" inspection on June 30, 1989;

Areas examined during the inspection included your actions in response to

Generic Letter 88-17 to prevent and, if necessary, respond to loss of decey

heat removal. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspector. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, ro violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

Original Signc<1 By

J.L Milhmn

Jemes L. Milhoan, Director

Division of Reactor Projects-

Enclosure:

Appendix - NRC Inspection P,eport

50-482/89-17 with Attachment

cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P.O. Box 411

Burlington, Kanses 66839 jn 1

  • RIV:TPS . * C:TPS *AD:DRSMggJU D:0RP

HFBundy/tw WCSeidle JPJaudon JLMilboan

/ /89

  • Previously concurred

/ /89 / /89 /p/89

[f/i t

8908020003 890727

FDR ADOCK 05000482

O F'DC

Q_-__-__--_-_-_-__

g7-- . . ,.

- - - - - -

,

.Ui '

h ~ '

'

' '

'.[..*

.

i

^

, ,

,, __

.

_.

f

'

m . f ,-

ffj' .

,

', -

s .

F(

[ ' s Wolf Creek Nuclear Operating 4 .- 2 -

X J Corporation ,

p~ ,

y , ,

,

,

>, ,

b,

< <

. . , . .. <r .

.

"

Wolf Creek Nuclear Operating terporation' ,

ATTN: Gary- Boyer, Plant Manager : -

.

"

'P.O. Box,411

~

>

,. ,

b Burlingtc.9, Kanses .66839= ' il

.-

t t

,,

,

. . .

>

.eKansas Corporation Commission

  • * ATTN: Robert D. Elliott, Chief. Engineer ,.

- Fourth-Floor, Docking State Office Building.

Toptka, Kansas:~66612-1571

Kansas ~ Radiation Control Program Director

^

'0

bcc w/ enclosures:

bec to DMB.(IE01) .

bcc distrib. by RIV:- , o

  • RR1* ..

.

  • R.:D. Martin, RA ,
  • SectionChief.(DRP/D) *DRP

'*RPB-DRSS .R. DeFayette, RIII

  • RIV File ' SRI, Callaway, RIII-

' MIS System *RSTS Operator

  • ProjectEngineer(DRP/D) Lisa Shea, RM/ALF

C. Seidle.

'

  • DRS . .
  • W. o
  • H. F. Bundy .

M..Hodges. NRR

  • D. V. Pickett. NRR Project Manager (MS: 13-D-18)'
  • w/766

'

1

!.< g

i

l'

l-

.

i

' '

,,..

I h - -

_ _ _ _ _ __ _ - _ _ _ _ ._ _ _. _ _. _.__J