May 8, 2019

SUBJECT:

WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2019001

Dear Mr. Heflin:

On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. On April 10, 2019, the NRC inspectors discussed the results of this inspection with Mr. J. McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one Severity Level IV violation with no associated finding. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as an NCV consistent with Section 2.3.2 of the Enforcement Policy.

Additionally, in the preceding twelve months the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process, as described in NRC Inspection Reports 05000482/2018002, dated August 12, 2018; 05000482/2018003, dated November 7, 2018; and in this report. Therefore, the NRC plans to conduct an inspection using Inspection Procedure 92723, Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled and completed once you provide written notification of your readiness for the inspection.

If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Wolf Creek Generating Station. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Wolf Creek Generating Station.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects

Docket No. 05000482 License No. NPF-42

Enclosure:

Inspection Report 05000482/2019001 w/Attachment: Request for Information

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2019001

Enterprise Identifier: I-2019-001-0012

Licensee:

Wolf Creek Nuclear Operating Corporation

Facility:

Wolf Creek Generating Station

Location:

Burlington, Kansas 66839

Inspection Dates:

January 1, 2019, to March 31, 2019

Inspectors:

D. Dodson, Senior Resident Inspector

F. Thomas, Resident Inspector

L. Carson II, Senior Health Physicist

B. Correll, Reactor Inspector

S. Hedger, Emergency Preparedness Inspector

Approved By:

Nicholas H. Taylor

Chief, Project Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a quarterly inspection at Wolf Creek Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in report sections: 7115

List of Findings and Violations

Failure to Provide Unfettered Access to an NRC Resident Inspector Cornerstone Severity Cross-cutting Aspect Inspection Procedure Not Applicable Severity Level IV NCV 05000482/2019001-01 Closed Not Applicable 71111.22 -

Surveillance Testing The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.70(b)(3), associated with the licensees failure to provide unfettered access to an NRC resident inspector. Specifically, while the NRC resident inspector was performing deep backshift observations and inspections, the resident inspector was removed from the site even though the resident inspector complied with applicable access control measures. As a result, the NRCs ability to regulate was adversely impacted.

Additional Tracking Items

None.

PLANT STATUS

Wolf Creek Generating Station operated at or near full power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems.

71111.04 - Equipment Alignment

Partial Walkdown (IP Section 02.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Component cooling water train B on February 15, 2019
(2) Residual heat removal train B on March 20, 2019
(3) Instrument air compressor A on March 21, 2109
(4) Spent fuel pool cooling train A on March 22, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Auxiliary building, elevation 1,974 and 2,026 feet, fire area A-3 on March 13, 2019
(2) Fuel building, elevation 2,000 feet, fire areas F-2 and F-3 on March 20, 2019
(3) Fuel building, elevation 2,047 feet, fire areas F-6 and F-7 on March 20, 2019
(4) Auxiliary building, elevation 2,000 feet, fire areas A-24 and A-25 on March 26, 2019 Annual Inspection (IP Section 03.02) (1 Partial Sample)

The inspectors evaluated fire brigade performance on February 8, 2019.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated licensed operator performance during reactivity manipulations by under instruction reactor operators on February 20, 2019; during performance of offsite power operability verification in accordance with STS NB-005, "Breaker Alignment Verification," during an extended emergency diesel generator maintenance window on March 5, 2019; and during performance of component cooling water pump B inservice testing in accordance with STS EG-100B, "Component Cooling Water Pumps B/D Inservice Pump Test," by under instruction reactor operators on March 11, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated licensed operator simulator requalification activities that included multiple instrument and component malfunctions and a steam generator tube rupture scenario on February 5, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with instrument air compressor A, which failed to maintain pressure on December 23, 2018.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Essential service water train B unplanned strainer piping replacement on January 8, 2019
(2) Risk assessment associated with component cooling water train A planned maintenance on February 12, 2019
(3) Risk assessment associated with emergency diesel generator and service water pump B planned maintenance during the week of March 4, 2019
(4) Risk assessment associated with component cooling water train B planned maintenance on March 14, 2019
(5) Risk assessment associated with auxiliary feedwater train A planned maintenance on March 28, 2019

71111.15 - Operability Determinations and Functionality Assessments

Sample Selection (IP Section 02.01) (4 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Steam generator secondary side un-reinforced penetration cover plate stress report error on January 3, 2019
(2) Identification of new or previously unevaluated boric acid leaks on February 21, 2019
(3) Pressurizer safety valve B increased tailpipe temperature indication on March 2, 2019
(4) Emergency diesel generator train B phase C output cable strands found cut on March 18, 2019

71111.19 - Post Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Safety injection pump A following planned maintenance on January 15, 2019
(2) Containment spray pump A following planned maintenance on January 16, 2019
(3) Essential service water pump B following planned maintenance on January 29, 2019
(4) Diesel driven fire pump following planned maintenance on February 19, 2019
(5) Loss of voltage and degraded voltage testing of channel 2 bistable after replacement of associated power supply on February 20, 2019
(6) Turbine driven auxiliary feedwater pump following planned maintenance on February 27, 2019
(7) Turbine driven auxiliary feedwater pump discharge to steam generator C valve (ALHV0012) following planned maintenance on February 27, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Reactor Coolant System (RCS) Leak Detection (IP Section 03.01) (1 Sample)

(1) STS BB-006, "[Reactor Coolant System] Water Inventory Balance Using the [Nuclear Plant Information System] Computer," on February 1, 2019

Surveillance Testing (IP Section 03.01) (5 Samples)

(1) STS SF-001, "Control and Shutdown Rod Operability Verification," on January 17, 2019
(2) STS IC-909B, "Accumulator Pressure Instrument Channel Calibration," on February 6, 2019
(3) STS IC-217, "[Reactor Coolant Pump] Loss of Voltage and Underfrequency [Trip Actuation Device Operational Testing]," on February 28, 2019
(4) STS KJ-005B, "Manual/Auto Start, [Synchronization] & Loading of [Emergency Diesel Generator] NE02," on March 6, 2019
(5) STN KU-010, "Station Blackout Diesel and Non-Safety [Auxiliary Feedwater] Pump Test," on March 11, 2019

71114.06 - Drill Evaluation

Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01) (1 Sample)

The inspectors evaluated the emergency preparedness drill on January 30, 2019

Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)

The inspectors evaluated the emergency preparedness drill on February 20,

RADIATION SAFETY

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 02.01) (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

  • RWP 183000, "Non-Destructive Testing/ISI"
  • RWP 184420, "Maintenance Support/Scaffolding"
  • RWP 186020, "Reactor Vessel Head Lift Activity"

Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02) (1 Sample)

The inspectors evaluated dose estimates and exposure tracking. The inspectors reviewed the following ALARA planning documents:

  • RWP 186020, "ALARA Review Package Reactor Vessel Head"
  • RWP 183000, "Non-Destructive Testing/ISI"

Additionally, the inspectors reviewed the following radiological outcome evaluations:

  • RWP 186020, "In-Progress and Post ALARA Review"
  • RWP 184420, "Maintenance Support/Scaffolding In-Progress and Post ALARA"

71124.04 - Occupational Dose Assessment

External Dosimetry (IP Section 02.02) (1 Sample)

The inspectors evaluated the external dosimetry program implementation.

Internal Dosimetry (IP Section 02.03) (1 Sample)

The inspectors evaluated the internal dosimetry program implementation.

Whole Body Counts:

In-vitro internal monitoring:

There was no in-vitro internal monitoring at Wolf Creek from 2018 to 2019.

Dose assessments performed using air sampling and DAC-hr. monitoring:

  • Air sample no. 18-0181

Source Term Categorization (IP Section 02.01) (1 Sample)

The inspectors evaluated the licensees characterization of the source term and use of scaling factors for the use of hard-to-detect radionuclide activity.

Special Dosimetric Situations (IP Section 02.04) (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

Declared pregnant workers:

There were no declared pregnant workers at Wolf Creek in 2018 and 2019.

EDEX exposures:

  • EDEX multi-package no. MP6042
  • EDEX multi-package no. MP6051

Shallow Dose Equivalent:

  • Skin dose ACAD no. 3933
  • Skin dose ACAD no. 2364

Neutron Dose Assessment:

  • 2017 - RWP 170036
  • 2018 - RWP 180036

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

Unplanned Scrams per 7000 Critical Hours Sample (01/01/2018-12/31/2018)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

Unplanned Power Changes per 7000 Critical Hours Sample (01/01/2018-12/31/2018)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

Unplanned Scrams with Complications (USwC) Sample (01/01/2018-12/31/2018)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) On November 27, 2018, Condition Report 128267 documented that Administrative Controls page for Technical Specification Surveillance Requirement 3.3.5.3 was added to the technical specifications prematurely and needed to be removed.
(2) On January 8, 2019, Condition Report 129197 documented that errors were found in documentation revised to implement a new emergency action level scheme.

INSPECTION RESULTS

Failure to Provide Unfettered Access to an NRC Resident Inspector Cornerstone Severity Cross-cutting Aspect Inspection Procedure Not Applicable Severity Level IV NCV 05000482/2019001-01 Closed Not Applicable

71111.22 - Surveillance

Testing The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.70(b)(3),associated with the licensees failure to provide unfettered access to an NRC resident inspector. Specifically, while the NRC resident inspector was performing deep backshift observations and inspections, the resident inspector was removed from the site even though the resident inspector complied with applicable access control measures. As a result, the NRCs ability to regulate was adversely impacted.

Description:

At approximately 10:00 p.m. on January 31, 2019, the resident inspector arrived at the Wolf Creek control room to observe reactor coolant system water inventory balance activities being performed by reactor operators. This observation was part of a baseline inspection sample required by Inspection Procedure 71111, Attachment 22, Surveillance Testing. At approximately 11:30 p.m., the control room operators reached a point in the testing procedure that required a 2-hour waiting period. During this time, the resident inspector performed plant status walk-downs of Class 1E electrical equipment and other control building equipment. At approximately 12:00 a.m. on February 1, 2019, an announcement was made over the plant announcement system requesting the resident inspector to answer. When the resident inspector responded, he was informed by a plant security officer that his plant access data system access had expired as a result of expired site access qualifications. The resident inspector was told that he would need to exit the protected area.

The resident inspector then attempted to exit the area, but discovered that his key card did not work. Almost immediately after having attempted to scan the key card, another security officer made an announcement and requested the resident inspector answer. The resident inspector notified the officer that the residents key card did not work and the security officer indicated that another security officer was on the way to escort the resident inspector out of the protected area. After a second check of the plant access training list, the security officer still did not see the resident inspectors name listed. Security then allowed the resident inspector to gather his personal belongings (while maintaining escort line of sight of the resident inspector), and then the resident inspector was escorted outside the protected area at approximately 12:30 a.m. After communicating with NRC management, the resident inspector left the Wolf Creek site at approximately 1:00 a.m. As a result, the resident inspector was neither able to observe all desired portions of the planned surveillance inspection activity, nor able to observe station conditions during the deep backshift, as planned.

After the NRC branch chief made licensee management aware of the resident inspectors access issues the following morning, the licensee conducted fact-finding and determined that the resident inspector had properly complied with applicable access control measures for security, radiological protection, and personal safety and had taken all actions necessary to ensure unfettered access. The resident inspectors site access was restored later on the morning of February 1, 2019.

Corrective Actions: The licensee performed fact-finding, reinstated the NRC inspectors site access, and briefed executive management. Additionally, the licensee conducted a basic cause evaluation to understand the causes of the issue. The licensee determined the probable cause to be that personnel in the licensing division had not communicated to the individual responsible for entering the training records into the learning management system (LMS) [an internal licensee training database], that the security division needed to be notified when an NRC inspectors site access training dates have been updated.

Corrective Action References: Condition Reports 129819, 129828, and 130158

Performance Assessment:

The inspectors determined this violation was associated with a minor performance deficiency.

Enforcement:

The ROPs significance determination process does not specifically consider the regulatory process impact in its assessment of licensee performance. Therefore, it is necessary to address this violation, which impedes the NRCs ability to regulate, using traditional enforcement to adequately deter non-compliance.

Severity: The finding was evaluated in accordance with the NRCs Enforcement Policy. The finding was reviewed by NRC management and because the violation was of very low safety significance, was not repetitive or willful, and was entered into the corrective action program, this violation is being treated as a Severity Level IV non-cited violation, consistent with the Enforcement Policy.

Violation: Title 10 CFR 50.70(b)(3), requires, in part, that the licensee shall afford any NRC resident inspector assigned to that site unfettered access, equivalent to access provided regular plant employees, following proper identification and compliance with applicable access control measures for security, radiological protection, and personal safety. Contrary to the above, on February 1, 2018, the licensee did not afford an NRC resident inspector assigned to the site unfettered access, equivalent to access provided regular plant employees, following proper identification and compliance with applicable access control measures for security, radiological protection, and personal safety. Specifically, while the NRC resident inspector was performing deep backshift observations and inspections, the resident inspector was removed from the site, even though the resident inspector complied with applicable access control measures. As a result, the NRCs ability to regulate was adversely impacted.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Licensee-Identified Non-Cited Violation

71152 - Problem

Identification and Resolution This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Title 10 CFR 50.54(q)(2) requires, in part, a holder of a license under this part shall maintain the effectiveness of an emergency plan that meets the requirements in Appendix E to this part and the planning standards of 50.47(b). Planning standard 10 CFR 50.47(b)(4)requires, in part, that a standard emergency classification and action level scheme is in use by the nuclear facility licensee. Contrary to the above, from September 26, 2018, to January 22, 2019, the licensee failed to maintain the effectiveness of an emergency plan which met the requirements in Appendix E to this part and the planning standards of 10 CFR 50.47(b). Specifically, the licensee failed to maintain a standard emergency classification scheme as required by 10 CFR 50.47(b)(4) because document APF 06-002-03, "EAL [elevated action level] Classification Matrix," Revision 0A, failed to include an elevated action level threshold associated with the potential loss of reactor coolant system barrier.

Significance: The finding was evaluated using Inspection Manual Chapter 0609, Appendix B, "Emergency Preparedness Significance Determination Process," issued September 22, 2015, and determined to be of very low safety significance (Green) because it was a failure to comply with NRC requirements, was associated with a risk-significant planning standard, and was not a lost or degraded planning standard function.

Corrective Action References: Condition Reports 129197, 129228, and

EXIT MEETINGS AND DEBRIEFS

On March 14, 2019, the inspector presented the baseline radiation safety inspection results to Mr. S. L. Smith, Vice President Engineering, and other members of the licensee staff.

On April 3, 2019, the inspector presented baseline problem identification and resolution inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.

On April 10, 2019, the inspectors presented the quarterly resident inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.

The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.01Adverse Weather Protection

Procedures

Number

Title

Revision

CKL ZL-009

Site Readings Sheets

111

Drawings

Number

Title

Revision

KD-7496

One Line Diagram

KD-7496A

Distribution System Equipment Lineup Limitations

71111.04Equipment Alignment

Procedures

Number

Title

Revision

CKL EC-120

Fuel Pool Cooling and Cleanup System Normal Valve

Lineup/Breaker Checklist

18A

CKL EG-120

Component Cooling Water System Valve, Switch and

Breaker Lineup

CKL EJ-120

RHR System Lineup

CKL KA-120

Compressed Air Valve, Breaker and Switch Lineup

36A

SYS EC-121

Recirc of the RWST Through The Fuel Pool Cleanup

System

SYS EC-201

Filling Spent Fuel Pool From Reactor Makeup Water

SYS KA-201

Instrument Air Dryer Operation

Drawings

Number

Title

Revision

M-12BN01

Piping & Instrumentation Diagram Borated Refueling

Water Storage System

M-12EC01

Piping & Instrumentation Diagram Fuel Pool Cooling and

Clean-Up System

M-12EC02

Piping & Instrumentation Diagram Fuel Pool Cooling and

Clean-Up System

M-12EJ01

Piping & Instrumentation Diagram Residual Heat

Removal System

M-12EG01

Piping & Instrumentation Diagram Component Cooling

Water System

M-12KA01

Piping & Instrumentation Diagram Compressed Air

System

M-12KA02

Piping & Instrumentation Diagram Compressed Air

System (Service Air)

Condition Reports

131029

Miscellaneous

Documents

Number

Title

Date

APF 21-001-02

Control Room Turnover Checklist - On-Coming

CRS/WC SRO/RO/BOP Review - Night Shift

03/22/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 19-0112

03/18/2019 to

03/24/2019

71111.05AQFire Protection Annual/Quarterly

Procedures

Number

Title

Revision

AP 10-106

Fire Preplans

18A

Miscellaneous

Documents

Number

Title

Revision

or Date

APF 10-105-02

Fire Drill Scenario and Critique Report: 1974 Aux

Building PC Storage Area

2/08/2019

APF 10-105-02

Fire Drill Scenario and Critique Report: 1974 Aux

Building PC Storage Area: Backshift

2/08/2019

E-1F9905

Fire Hazard Analysis

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number

Title

Revision

AI 30B-015

Licensed Operator Requalification Examination

Guidelines

Miscellaneous

Documents

Number

Title

Date

APF 30E-003-05

Lesson Plan Coversheet - Simulator Discovery

Scenario

01/29/2019

STS NB-005

Surveillance Test Routing Sheet (STRS) - Breaker

Alignment Verification

03/04/2019

71111.12Maintenance Effectiveness

Drawings

Number

Title

Revision

M-12KA01

Piping & Instrumentation Diagram Compressed Air

System

M-12KA04

Piping & Instrumentation Diagram Instrument Air System 21

Condition Reports

28929

28970

130277

130471

Miscellaneous

Documents

Number

Title

Revision

or Date

Final Scope Evaluation - Pending MREP Approval:

EF - Essential Service Water

03/26/2019

Functional Failure Determination Checklist for KA -

CR 126897

10/17/2018

Functional Failure Determination Checklist for KA -

CR 128929

01/23/2019

Maintenance Rule Expert Panel Meeting Agenda

2/19/2019

Maintenance Rule Expert Panel Meeting Agenda

03/26/2019

System Health Report for KA

01/01/2018 to

06/30/2018

APF 16C-006-03

Work Order Revision Sheet - WO 18-440917-000

71111.13Maintenance Risk Assessments and Emergent Work Control

Procedures

Number

Title

Revision

AI 22C-013

Protected Equipment Program

AP 10-103

Fire Protection Impairment Control

AP 22C-003

On-Line Nuclear Safety and Generation Risk

Assessment

Condition Reports

130240

Work Orders

17-431786-006

Miscellaneous

Documents

Number

Title

Revision

or Date

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 2019-0102

01/07/2019 to

01/13/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 19-0105

2/11/2019 to

2/17/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 19-0107

01/27/2019 to

2/02/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 2019-0110

03/04/2019 to

03/10/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 2019-0111

03/11/2019 to

03/17/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 19-0113

03/25/2019 to

03/31/2019

GPD-1353 7/76

Bechtel - Calculation Cover Sheet - Calc. No. HV-288 0

71111.15Operability Determinations and Functionality Assessments

Procedures

Number

Title

Revision

AI 16-003

Temporary Grounding

AP 26C-004

Operability Determination and Functionality Assessment 37

MPE NE-004

Alternator Inspection

Condition Reports

29066

29758

130243

130292

130332

130333

130334

130335

130336

130337

130338

130339

130340

130341

130342

130348

130399

130401

130402

130403

130404

130583

130835

Work Orders

2-240639-000

16-420222-000

Miscellaneous

Documents

Number

Title

Revision

or Date

10466-E-029

Technical Specification for 5,000-Volt and 15,000Volt

Single-Conductor Power Cable for the Standardized

Nuclear Unit Power Plant System

APF 28-001-01

Operability Evaluation: NE002 B-EDG Stator

09/12/2017

MPE NE-004

On the Spot Change (OTSC) - Alternator Inspection

10/19/2015

71111.19Post Maintenance Testing

Procedures

Number

Title

Revision

OFN SB-008

Instrument Malfunctions

STN AL-201

Auxiliary Feedwater System Valve Test

STN FP-211

Diesel Fire Pump 1FP01PB Monthly Operation and Fuel

Level Check

STS AB-201B

TDAFP Steam Isolation Inservice Valve Test

STS AL-103

TDAFW Pump Inservice Pump Test

73B

STS AL-201C

Turbine Driven Auxiliary Feedwater System Inservice

Valve Test

STS EN-100A

Containment Spray Pump A Inservice Pump Test

STS IC-208B

4KV Loss of Voltage & Degraded Voltage TADOT NB02

BUS - SEP GRP 4

STS PE-052A

Auxiliary Feedwater Pump Turbine Pressure Test

STS PE-007

Periodic Verification of Motor Operated Valves

5A

Drawings

Number

Title

Revision

E-K3EF06

Schematic Diagram ESW Pump Discharge Air Release

Valve

M-0023

P&ID Fire Protection System (FP)

M-12AB01

Piping & Instrumentation Diagram Main Steam System

M-12AB02

Piping & Instrumentation Diagram Main Steam System

M-12AB03

Piping & Instrumentation Diagram Main Steam System

M-12AL01

Piping & Instrumentation Diagram Auxiliary Feedwater

System

M-12BN01

Piping & Instrumentation Diagram Borated Refueling

Water Storage System

M-12EN01

Piping & Instrumentation Diagram Containment Spray

System

M-12FC02

Piping & Instrumentation Diagram Auxiliary Feedwater

Pump Turbine

M-12FC05

Piping & Instrumentation Diagram Auxiliary Turbines

SGFP Turbine A

M-12FC06

Piping & Instrumentation Diagram Auxiliary Turbines

SGFP Turbine B

M-K2EF01

Piping & Instrumentation Diagram Essential Service

Water Sys.

Condition Reports

130240

Miscellaneous

Documents

Number

Title

Revision

or Date

APF 15C-002-01

Procedure Cover Sheet - Fire Pump Operations -

SYS FP-293

2/19/2019

APF 21-001-02

Control Room Turnover Checklist: Day Shift

2/19/2019

APF 21-001-02

Control Room Turnover Checklist: Night Shift

2/20/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk

Assessment: Schedule Week 19-0108

2/18/2019 to

2/24/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Containment

Spray Pump A Inservice Pump Test

01/16/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): ESW

System Valve

01/29/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Safety

Injection Pump A Inservice Pump Test

01/16/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Turbine

Driven Auxiliary Feedwater System Inservice Valve

Test

11/30/2018

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Turbine

Driven AFW Pump Inservice Pump Test

2/27/2019

STN FP-211

Diesel Fire Pump 1FP01PB Monthly Operation and

Fuel Level Check

2/29/2019

STS EF-100B

Surveillance Test Routing Sheet (STRS): ESW

System Inservice Pump B & ESW B Check Valve

01/29/2019

WCRE-34

Fourth Ten Year Interval Inservice Testing Program

71111.22Surveillance Testing

Procedures

Number

Title

Revision

AP 25A-100

Containment Entry

18A

I-ENG-003

Vibration Monitoring and Analysis

STN KU-010

Station Blackout Diesel and Non-Safety AFW Pump

Test

STN SF-001

Control Rod Parking

STS BB-006

RCS Water Inventory Balance Using the NPIS

Computer

19A

STS IC-217

RCP Loss of Voltage and Underfrequency TADOT

15C

STS IC-909B

Accumulator Pressure Instrumentation Channel

Calibration

STS KJ-005B

Manual/Auto Start, Sync & Loading of EDG NE02

STS SF-001

Control and Shutdown Rod Operability Verification

Drawings

Number

Title

Revision

E-13EJ08

Schematic Diagram Residual Heat Removal Pump

Miniflow Valve EJFCV0610

M-12EJ01

Piping and Instrumentation Diagram Residual Heat

Removal System

M-13EJ03

Piping Isometric Residual Heat Removal System

Auxiliary Building - A and B Train

Condition Reports

29583

29991

29992

130583

130759

130767

Miscellaneous

Documents

Number

Title

Revision

or Date

Vibration Alert/Action Criteria

AIF 28A-100-27

Level of Effort Evaluation - Proposed Traditional

Violation Unfettered Access NRC: CR 130158

APF 15C-002-01

Procedure Cover Sheet - Diesel Generator NE01 and

NE02 Lineup for Automatic Operation

2A

APF 15C-002-01

Procedure Cover Sheet - Post Maintenance Run of

Emergency Diesel Generator B - SYS KJ-124

APF 15C-004-01

Document Revision Request (DRR): RCS Water

Inventory Balance Using the NPIS Computer

APF 15C-004-01

Document Revision Request (DRR): RCS Water

Inventory Balance Using the NPIS Computer

APF 25A-401-01

ALARA Review Package: 190036

09/17/2018

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Control and

Shutdown Rod Operability Verification

01/17/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Control Rod

Parking

01/17/2019

APF 29B-00-01

Surveillance Test Routing Sheet (STRS): RCS Water

Inventory Balance Using the NPIS Computer

2/01/2019

APF 29B-00-01

Surveillance Test Routing Sheet (STRS): RCS Water

Inventory Balance Using the NPIS Computer

2/01/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): RHR System

Inservice Pump Test

01/09/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Manual/Auto

Start, Synchronization & Loading of Emergency D/G

NE02

03/06/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Station

Blackout Diesel and Non-Safety AFW Pump Test

03/11/2019

APF 29B-003-01

Surveillance Test Routing Sheet (STRS): Train B RHR

System Inservice Valve Testing

01/09/2019

Miscellaneous

Documents

Number

Title

Revision

or Date

RPF 02-105-01

Radiation Work Permit: 190036

000

RPF 02-210-01

WCGS Radiological Survey Map: 2000 Containment -

Survey #M-20181031-6

10/31/2018

RPF 02-210-01

WCGS Radiological Survey Map: Map 1: 2068

Containment - Survey #M-20181031-7

10/31/2018

RPF 02-210-01

WCGS Radiological Survey Map: Map 2: 2047

Containment - Survey #M-20181031-7

10/31/2018

RPF 02-210-01

WCGS Radiological Survey Map: Map 1: Containment

Personnel Hatch-Survey #M-20180531-8

05/31/2018

RPF 02-210-01

WCGS Radiological Survey Map: Map 2: 2026

Containment - Survey #M-20180531-8

05/31/2018

M-018-00309

Instruction Manual for Emergency Diesel Generator

System

W139

71114.06Drill Evaluation

Procedures

Number

Title

Revision

EPP 06-006

Protective Action Recommendations

Condition Reports

29197

29732

29734

29735

29736

29739

29740

29741

29742

29745

29749

29751

29754

29770

29774

29783

29856

130241

130280

130281

130282

130283

130284

130286

130287

130290

130291

130293

130294

130296

130300

130301

130303

130304

130305

130306

130307

130308

130309

130310

130312

130313

130314

Miscellaneous

Documents

Number

Title

Revision

or Date

19-SA-01

Wolf Creek Generating Station Emergency Planning Drill 02/21/2019

APF 06-002-03

EAL Classification Matrix - All Conditions

OA

APF 06-002-03

EAL Classification Matrix - All Conditions

OB

APF 06-002-03

EAL Classification Matrix - Cold Conditions

OA

APF 06-002-03

EAL Classification Matrix - Hot Conditions

OA

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. CR-001

Miscellaneous

Documents

Number

Title

Revision

or Date

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. EOF-001

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. EOF-002

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. EOF-003

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. EOF-004

EPF 06-007-02

WCGS Immediate Emergency Notification - Message

No. TSC-002

EPF 06-007-03

WCGS Follow-Up Emergency Notification - Message

No. EOF-001

EPF 06-007-03

WCGS Follow-Up Emergency Notification - Message

No. EOF-002

EPF 06-007-03

WCGS Follow-Up Emergency Notification - Message

No. EOF-003

EPF 06-007-03

WCGS Follow-Up Emergency Notification - Message

No. TSC-001

EPF 06-013-04

Potassium Iodide Issue Record

71124.02 - Occupational ALARA Planning and Controls

Procedures

Number

Title

Revision

AP 25A-100

Radiation Protection Manual

AP 25A-401

ALARA Program

AP 25A-410

ALARA Committee

AP 25B-100

Radiation Worker Guidelines

AP 25B-100

RWP Program

24A

RPP-03-105

Radiological Work Permits

Audits and Self-Assessments

Number

Title

Date

18-01-RP/PC

Quality Assurance Audit Report: Radiological

Protection/Process Control

2/15/2018

QH-2018-1558

RP Effectiveness Implementing Stop Work Criteria

05/24/2018

QH-2019-1811

Quick Hit Assessment: NRC IP 71124.02 Assessment

2/07/2019

Corrective Action Reports (CRs)

113708

113736

113752

28580

29938

29940

29941

130433

Radiation Work Permits, ALARA Planning, In-Progress Reviews

Number

Title

Revision

183000

RFO 22 - Non-Destructive Testing ISI Exams

183220

RFO 22 - Primary Side Steam Generator Eddy Current Tests

184420

RFO 22 - Maintenance Support Scaffolding

186020

RFO 22 - Reactor Head and All Associated Work Activities

Miscellaneous Documents

Number

Title

Date

RF22 RP Summary Report

Scaling Factors - 10CFR Part 61 Waste Stream Sample

Screening and Evaluation

2/02/2108

Source Term Reduction Strategy: 5-Year Update

03/11/2019

WF3 2019 Radiation Work Permit Totals (millirem)

01/13/2019

WF3 Site Dose Totals Online/Outage for the past 3 years

(dose in Person-Rem)

01/09/2019

71124.04 - Occupational Dose Assessment

Procedures

Number

Title

Revision

RPP-01-105

Health Physics Organization, Responsibilities, and Code of

Conduct

RPP 03-121

Determination of Neutron Dose

RPP 03-122

Skin Dose Calculations

13A

RPP 03-205

DAC-Hour Tracking

17A

RPP 03-210

Internal Exposure Calculations and Evaluations

17A

RPP 03-215

Collection of Bioassay Samples

8B

RPP 03-406

RP Dosimetry / Records

RPP 05-707

Operation of Whole Body Counters

Audits and Self-Assessments

Number

Title

Date

18-01-RP/PC

Quality Assurance Audit Report: Radiological

Protection/Process Control

2/15/2018

QH-2017-1558

Benchmarking NRC PI Effectiveness

2/21/2017

QH-2019-1801

Quick Hit Assessment: NRC IP 71124.04 Assessment

2/07/2019

Corrective Action Reports (CRs)

113730

113756

113973

117700

118254

21163

21171

21729

Corrective Action Reports (CRs)

2130

2348

25779

26076

26614

27562

27564

29934

CFR Part 61 Waste Stream Analysis Reports

Number

Title

Date

446223

Dry Active Waste

03/12/2018

446223

RCS Filters

03/01/2018

446223

SFP Filters

2/28/2018

447547

CVCS Resins

03/27/2018

447769

Drum Dryer Waste Tank

03/12/2018

447769

Radwaste Resin

03/27/2018

Neutron Dose Assessments

Number

Title

Date

RWP-17-0036

Containment Entries at Power

2/31/2017

RWP-17-0036

Containment Entries at Power

03/10/2019

RWP-18-0036

Containment Entries at Power

2/31/2018

Dose Assessment and Air Sample Surveys

Number

Title

Date

18-0181

Air Sample:

04/20/2018

18-0631

Air Sample:

04/20/2018

18-0639

Air Sample:

04/20/2018

18-0665

Air Sample:

04/20/2018

ACAD 1356

Air Sample:

04/20/2018

ACAD 2364

Air Sample:

04/20/2018

ACAD 3933

Air Sample:

04/20/2018

ACAD 3635

Air Sample:

04/20/2018

Positive Whole-Body Counts (ACAD No.)

Number

Title

Date

1174

Airborne Radiodine Activity in Containment

04/20/2018

7657

Airborne Radiodine Activity in Containment

04/12/2018

23

Airborne Radiodine Activity in Containment

04/18/2018

Miscellaneous Documents

Number

Title

Date

2018 Whole Body Counting Reports

06/16/2017 to

2/25/2019

Dose Assessment Records for 5 Radworkers

05/21/2018

Miscellaneous Documents

Number

Title

Date

2018 Whole Body Counting Reports

06/16/2017 to

2/25/2019

17025:2005

NVLAP Certificate of Accreditation - Ionizing Radiation

Dosimetry

2/17/2018

TSC No.14-043 Neutron Dosimetry Evaluation at WCGS

04/30/2014

71151Performance Indicator Verification

Condition Reports

25935

25943

Miscellaneous

Documents

Number

Title

Date

Functional Failure Determination Checklist for AAPL -

CR 125935

08/30/2018

Functional Failure Determination Checklist for OF -

CR 125943

09/05/2018

Interoffice Correspondence - Plant Health Committee

Meeting Minutes

08/27/2018

71152Problem Identification and Resolution

Procedures

Number

Title

Revision

AP 06-002

Radiological Emergency Response Plan

AP 06-002

Radiological Emergency Response Plan

EMG F-0

Critical Safety Function Status Trees (CSFST)

EPP 06-005

Emergency Classification

Calculations

Number

Title

Revision

XX-E-009 CN003

System NB, NG, PG, Under Voltage/Degraded Voltage

XX-E-009 CN004

System NB, NG, PG, Under Voltage/Degraded Voltage

XX-E-009 CN006

System NB, NG, PG, Under Voltage/Degraded Voltage

Condition Reports

47771

103562

103849

104098

104139

104253

104266

104389

28267

29197

29228

29344

29904

Miscellaneous

Documents

Number

Title

Revision

or Date

Administrative Controls Page SR 3.3.5.3

Wolf Creek Generating Station - Issuance of

Amendment Regarding Emergency Action Level

Scheme Change (CAC No. MF8450)

08/28/2017

AP 15C-003

Procedure Users Guide for Abnormal Plant Conditions

APF 06-002-01

Emergency Action Levels

17A

APF 06-002-02

Emergency Action Levels Technical Bases

0A

APF 06-002-02

Emergency Action Levels Technical Bases

0B

APF 06-002-03

EAL Classification Matrix

0A

APF 06-002-03

EAL Classification Matrix

0B

HP-Rev. 3

Background Information for Westinghouse Owners

Group Emergency Response Guideline, FR-P.1,

Response to Imminent Pressurized Thermal Shock

03/31/2014

LO1732349

Lesson Plan, EMG FR-P1/P2 Pressurized Thermal

Shock

LR0010700

Lesson Plan, Mitigating Core Damage

LR1432305

Lesson Plan, EMG FR-P (Integrity) Series Procedures

000A

WCAP-10319

A Generic Assessment of Significant Flaw Extension,

Including Stagnant Loop Conditions, From Pressurized

Thermal Shock of Reactor Vessels on Westinghouse

Nuclear Power Plants

2/00/1983

WO 16-0045

Docket No. 50-482: Request to Adopt Emergency Action

Level Scheme Pursuant to NEI 99-01, Revision 6,

Development of Emergency Action Levels for Non-

Passive Reactors

09/30/2016

WO 17-0013

Docket No. 50-482: Response to Request for Additional

Information Regarding Adopting New EAL Scheme

03/16/2017

WO 17-0042

Docket No. 50-482: Supplement to RAI Response

Regarding Adopting New EAL Scheme

04/26/2017

The following items are requested for the

Occupational Radiation Safety Inspection

at Wolf Creek Generating Station

March 11 thru 15, 2019

Integrated Report 2019001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before March 5, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on a regulatory compliance data management system, please ensure

the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the

inspectors will have access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at 817-200-1221 or

louis.carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: June 16, 2017

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection: June 16, 2017

A.

List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D.

Procedure indexes for the following areas:

1. Occupational Dose Assessment

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of positive whole body counts since date of last inspection, names redacted if

desired

H.

Part 61 analyses/scaling factors

I.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML19128A369

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NHT Yes No

Publicly Available Sensitive

NRC-002

OFFICE

SRI:DRP/B

RI:DRP/B

C:DRS/OB

C:DNMS/RIB

C:DRS/EB1

C:DRS/EB2

NAME

DDodson

FThomas

GWerner

GWarnick

VGaddy

JDrake

SIGNATURE

DED

FDT

GEW

GXW

vgg

JFD

DATE

5/6/19

05/07/19

04/29/2019

5/7/19

4/30/19

4/29/19

OFFICE

C:DRS/RCB

TL:DRS/IPAT

BC:DRP/B

NAME

NMakris

RKellar

NTaylor

SIGNATURE

NJM

RLK

NHT

DATE

4/29/19

04/29/2019

5/7/19