ML20055F625
| ML20055F625 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/09/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| References | |
| NUDOCS 9007180207 | |
| Download: ML20055F625 (5) | |
Text
f w;[-('
]lk.f t
- ata.
e og w,
m..
)
- InReyly.ReferTo:
4
. Docket:.STN 50-482 f%
y Wolf Creek Nuclear Operating Corporation
-ATTN:
Bart D. Withers President and: Chief Executive Officer t
,' T
.P.O. Box 411 6
Burlington,7. Kansas 66839
. Gentlemen:
6imy' This refers to the ' meeting conducted at Wolf Creek Nuclear.0perating
. Corporation's request in the Region IV office 1on June 26, 1990. This meeting-
+
~
+4
- related to activities authorized by NRC License _No. NPF-42 for Wolf Creek and is
'was attended by those on the attached Attendance List.
The subjects discussed at this meeting-are described in the enclose'.i Meeting L
Summary.
.It is 'our' opinion that thisL meeting was beneficial ~ and has provided a better; e,derstanding of your performance during the latest refueling outage.
a In accordance with Section 2.790 of the NRC's " Rules of Practice,".L Part 2,. -
Title 10, Code-of Federal.-Regulations, a copy of this letter will be placed.in-
.the-NRC's:Public Document Room.
j
=1
- Should you.have any questions concerning this matter, we will be pleased to
~
discuss them with.you..
Sincerely, 0'nginal Signed By:.
Samuel J. Colins Samuel. J. Collins, _ Director l'
Division of Reactor Projects Enclosu're':
Meeting: Summary w/ attachments i
cc-w/ enclosure
~
Wolf Creek Nuclear Operating Corp.
. ATTN: ; Gary Boyer, Plant Manager P.O. Box'411 Burlington, Kansas 66839 t
r
(
.c LRIV:DRFV(df cC:DRP
^h WBJones; JSWieb J ollins Mih[
7/3 /90_-
_7/S /9 A
fY 900710020790070'g2 7
ADOCK0500je DR
~
a
'., 4.. *>
r.4, q,
o kj \\.
?
h a=
Wolf Creek Nuclear Operating -
,l Corporation m
Shaw, Pittman, Potts & Trowbridge ATTN: Jay Silberg, Esq.
1800 M Street, NW Washington, D.C.
20036 Public Ser/ ice Commission ATTN:
Chris R, Rogers, P.E.
Manager, Electric Department P.O. Box 360 Jefferson City, Missouri 65102 U.S. Nuclear Regulatory Commission ATTN:
Regional Administrator, Region Ill
'i99 Roosevelt Road Glen Ellyn, Illinois 60137 Wolf Creek Nuclear Operating Corp.
ATTN:
Otto Maynard, Manager Regulatory Services P.O. Box 411 Burlington, Kansas 66839 Kansas Corporation Commission ATTN:
Robert Elliot, Chief Engineer Utilities Division 4th Floor - State Office Building Topeka, Kansas 66612-1571 Office of the Governor State of Kansas Topeka, Kansas 66612 Attor'<ey General 1st floor - The Statehouse Topeka, Kansas 66612 Chairman, Coffey County Commission Coffey County Courthouse Burlington, Kansas 66839 Kansas Department of Health and Environmeat Bureau of Air Quality & hadiation tuntrol ATTN:
Gerald Allen, Public Health Physicist F.
Division of Environment 1
Forbes field Building 321
^1 1 -
Topeka, Tansas 66620 t
6N NN
n.
Idil$h[
q_,
=,
M Ir Wolf. Creek Nuclear, Operating ' -
Corpor6 tion.
1 L..
'U'.S. Nuclear. Regulatory Comission
!~
ATTN: 1 Senior Resident Inspectar P.0; Box 311!
-Burlington, Kansas. ~ 66839 '
- U.S. Nuclear Regulatory Commission
-ATTH:
Regional Administrator Region:IV; 611'Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 bcc.toDMB'(IE45) bec dist' rib.'by RIV:
R..D. Martin'
' Resident Inspector
.Sectionchief(DRP/0)-
DRP DRSS-FRPS R. Hague, RIII-
- RIVJFile.
. SRI, Callaway, RIII
- 1. MIS. System
'RSTS Operator ProjectEngineer(DRP/D):
Lisa Shea, RM/ALF
.- DRS -
I y
Y' I' ' i 's
- j.'
' j u
k i
k
_i_
f g
s I
Y f(
4 Mf s,.
g
- r.
~ ~
-QUc
- g 3
s %%,n f
+
n-
-d 2
3 Ili.
" ~*
.NEEi1N.G
SUMMARY
y
- lQ v' m,,
,Licensce:
f@.- 4.
Wolf Crwk Nuclear Operating scorporation'(WC.NOC)
%g$
- Facility:
. Wolf Creek Generating suMon (UCGS)
((
cLicense No.:
hPF-42 N
Docket No.:
STN 50-482 p'
- e
Subject:
Licensee Perfonaance During Latest Refueling Outage On'-June 26,:1990,' representatives of WCNOC net with Region IV perscanel in -
Arlington Texas, to discuss't.betr perfonnance during tre latest refuel 199 7
. outage. The meeting was, held at the requer.t of WCNOC. Aug mat.ters
. discussed were refueling outage critical path scheduling, plant n>dificationo, diesel generator: maintenance activitfes, erosion / corrosion in pipe, and utates 1
of various licensed operator and health physicti programs, : The ettendancolist
.is attached to: this sumary,,
,n c:
Attachment:
^
LAttendance List 1
b i
[
't n
j.
-L 9
1 f
z';( l t,
_ ?i
- ,e.
$$, m$'
- 'I,
E !,
.: it,
d E.
- )
,h e
3:99q
< ~ a
4 e, 4
ATTENDANCE LIST Attendance et the June 26, 1990, meeting between WCNOC and NRC in Arlington, Texas:
WCNOC J. A. Bailey, Vice President, Nuclear Operations G. D. Boyer, Plant Manager lk J. D. Weeks. Manager, Operationc T. S. Morrill, Manager, Radiation Protection H. K. Chernoff, Supervisor, licensing 5
R. Lewis, Supervisor, Results Engineering 4
NRC L. J. Callan, Director, Division of Reactor Safety
- ~
T. P. Gwynn, Deputy Director, Division of Reactor Projects J. S. Wiebe, Chief, Project Section D. Division of Reactor Projects C. I. Grimes, Project Directorate IV-2, NRR W. B. Jones, Project Engineer, Project Section D, Division of Reactor Projects D. Pickett, Project Manager, NRR
-u s
)
r
(
~~
'S e
y
-'