ML20059J354
| ML20059J354 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/11/1990 |
| From: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20059J360 | List: |
| References | |
| NUDOCS 9009190276 | |
| Download: ML20059J354 (4) | |
See also: IR 05000482/1990014
Text
6
~
'
a
- i
.
!
'
SEP 1 1 1990
l
In Reply To:
Docket:
50-482/90-14
.
.
,
!
Wolf Creek Nuclear Operating Corporation
I
ATTN:
Bert D. Withers
President and Chief Executive Officer
i
P.O. Box 411.
Burlington, Kansas 66839
i
Gentlemen:
i
This forwards the initial Systematic Assessment of Licensee Performance ($ ALP)
Report _(50-482/90-14) for the Wolf Creek Generating Station (WCGS). The SALP.
Board met on August 14, 1990, to ovaluate WCGS's performance for the period
,
April 1,1989, through June 30, 1990. The performance analyses and resulting
evaluations are documented in the enclosed SALP Board Report.
,
In accordance with NRC policy, I have reviewed the SALP Board's assessment'and
coneJr with their ratings, at discussed below:'
i
Performance in the area of operations was-rated as Category 2.
.
,
attained a very high operating capacity factor during the_ assessment period.
~
Although the plant operated well, continued improvement in critical
self-assessment is warranted.
I
Radiological controls was rated Category 2 with an improving trend.'
The _
'
person-rem exposure for the last several years has been notably low. This
was attained, in part, through a well -lmplemented radiological controls
pryram. Development of comprehensive procedures to support the
established program was still needed.
The areas of security and emergency preparedness remained Category 1.
i
Effective management involvement in these two areas was apparent,
j
'
The area of maintenance / surveillance was rated Category 2.
Little
'
improvement was noted in the trending program since the previous assessment
'
period.
Better control of maintenance troubleshooting activities is
needed to ensure that operators are constantly cognizant of potentially
l
changing plant conditions.
'i
Performance in the area of engineering / technical support was' rated
Category 2.
Additional programmatic controls have been implemented
identifying and resolving industry technical issues. Nevertheless,
additional effort was needed to complete the implementation of the program
cr uges.
.
- RIV. SRI *C:DRP/D *NRR
- NRR
NR
- D:DRSS'
- D:DRS
!
MEstow
JSWiebe
DVPickett
BABo,qer CIGrimes
ABBeach
LJCallan
/ /90
9/ /90
9/ /90
9/ /90 9/(Q'90
9/. /90
9/ /90
W
-
- DRP
'
SJCollins
J.-
u gomery
RD
in
Y9/)D/90
9/h/90
9/p/90
h
{
- previously concurred
9009190276 900911
Q q ^ '" r4~
.?
rx . .
-
.
-
. - -
-
4 DOCK 05000482
.
-
- _ _ - .
.
-.
.
- _ .
. ..
-
R,i'
,
i
\\
'
.
l
Wolf Creek Nuclear Operating
-2-
I
Corporation
The area of safety assessment / quality verification was rated as Category 2.
Performance in the area of safety _ assessment was generally strong; however,_
the quality verification program was not_ fully effective in identifying
problem areas and ensuring that appropriate corrective actions were taken
i
promptly to prevent recurrence,
t
Overall,'performane*, remained relatively steady during the assessment period.
Obvious irnrovement in the area of radiological controls.was noted.
Based on.
- .
the SALP board's assessment, the length of the SALP peri d will r* Tin a
-
L
15-month cycle; therefore, the next SALP period will be from July 1.1990, to.
!
l
September 30, 1991.
'
-
A management meeting will be scheduled with you and your staff to review the
!
results of this SALP report. The time and date of this meeting will be
!
t
promulgated separately. Within 30 days of this. management meeting, you may .
'
provide written comments on, and amplification of. as! appropriate, the initial
SALP Report.
Your comments, a summary of our meeting, and my disposition of
your comments will be issued as an appendix to the enclosed initial SALP Report -
and will constitute the fir.a1 SALP Report.
A copy of your written comments will be included in the final distribution _of
the SALP report.
'
TN
Robert D. h -t h
F.tgional: Admi 4 ,trater
1
Enclosure:
l
SALP Board Report 50-482/90-14
I
's
cc w/ enclosure:
Wolf Creek Nuclear Openting Cetp.
ATTN: Gary Boyer, Plant Manager
i
P.O. Box 411
'
Burlington, Kan as 66839
'
t
Shaw, Pittman, Potts & Trowbridge
ATTN: Jay Silberg, Esq.
1800 M Street, NW
Washington, D.C.
20036
Public Service Commission
'
ATTN: Chris R. Rogers, P E.
Manager, Electric Department
P.O. Box 360
Jefferson City, Missouri
65102
t
t
,
-_
._. .
.
, . _ _
<
i
.g
-
!
Wolf Creek Nuclear Operating
-3
Corporation
t
i
U.S. Nuclear. Regulatory Commission
l
ATTN: Regional Administrator, Region III-
799 Roosevelt Road
~
l
Glen Ellyn, Illinois 60137
-
' Wolf Creek Nuclear Operating Corp.
. ATTN: Otto Maynard, Manager
.
Regulatory Services
P.O. Box 411
~
.
.Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:.
Robert Elliot, Chief Engineer
.t
Utilities Division-
4th Floor - State Office Building
Topeka, Kansas 66612-1571
l
Office of the Governor
!
State of Kansas
[
Topeka, Kansas 66612
<
Attorney General
1st Floor - The Stat 6vuse
Topeka, Kansas 666'.2
]
Chairman, Coffey County Commission
Coffey County Courthouse
Burlington, Kansas 66839
Kansas Department of Health
'
'
and Environment
.
Bureau of Air Quality & Radiation
.
r
'
Control
ATTN: Gerald Allen, Public
i
Health Physicist
'
Division of Environment
Forbes Field Building 321
.
'
Topeka, Kansas 66620
U.S. Nuclear Regulatory Commission
ATTN: Senior Resident Inspector
1
P.O. Box 311
Burlington, Kansas 66839
$
U.S. Nuclear Regulatory Commission
v
ATTN: RegionO Administrator, Region IV
,
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
i
L
?
!
-
-
.-=
I
,
<
'
A
.
Wolf Creek Nuclear Operating
-4-
Corporation
,
bec to DMB (IE40)
bec distrib. by RIV:
- R. D. Martin
- Resident Inspector
- Section Chief (DRP/0)
- DRP(2)
- DRSS-FRPS
Section Chief (RIII, DRP/3C)
- RIV Filt
SRI, Callaway, RIII
- MIS System
- RSTS Operator
- Project Engineer (DRP/D)
Lisa Shea, RM/ALF
Chairman Carr (MS:
17-D-1)
Records Center, INPO
Commissioner Roberts (MS:
18-H-1)
RRIs at all sites
Commissioner Rogers (MS:
16-H-3)
G. F. Sanborn, EO
Commissioner Curtiss (MS:
16-G-15)
- DRS
.
Commissioner Remick (MF:17-G-21))
16-G-3
'A. B. Beach', D:DRSS
J. M. Taylor, EDO (MS:
L. A. Yandell, DRSS
J. M. Montgomery
B. Murray, DRSS
J. T. Gilliland, PA0
D. A. Powers, DRSS
C. A. Hackney
- w/766
i
I
,
~!
.
.
.