ML20248C640
| ML20248C640 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/27/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20248C643 | List: |
| References | |
| NUDOCS 8910030530 | |
| Download: ML20248C640 (2) | |
See also: IR 05000482/1989025
Text
_ _ - -
-
_
---
.
c
,
SEP 2 71989'
.
..
,
.
-
In Reply Refer To:
Docket: STN 50-482/89-25
l
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to t'.1e inspection conducted by Messrs. R. C. Stewart and
L. E. Ellershaw of this office during the period September 11-15, 1989, of
activities authorized by NRC Operating License NPF-42 for Wolf Creek Generating
Station, and to the discussion of our findings with Mr. G. D. Boyer and other
members of your staff at the conclusion of the inspection.
-
Areas examined during the inspection dealt with the implementation of your-
program for inservice testing of pumps and valves. Within these areas, the
inspection consisted of selective examination of procedures'and representative .
records, interviews with personnel, and observations by the. inspectors. The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations w'ere
-
)
identified.
1
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
.
Sincerely.
J
Original Signed By
i
L L Mimoan
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
1
l
50-482/89-25
cc w/ enclosure:
(see next page)
l
/s
d
i
C:MQPS g # LJCallany:DRS M p
RIV:RI:MQPS -
RI:MQP
D: RP
,
'
,
RStewart:1i
LEller
w~
IBarnes
JLMilhoan
7 /20/89
%/89
9/4/89
q/76/89
y/f/89
8910030330 890921
l
ADOCK 05000482
.g
i
Q
7
.
-
.
_
.
._
_.
t
\\
1
.
..
.
i
W.lf Creek huclear Operating
-2-
Corporation
)
l
Wolf Creek Nuclear Operating Corporation
i
ATTN: Otte Maynard, Manager
j
Regulatory Services
P.O. Box 411
Burlington, Kansas 66839
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Comission
ATTN: Pobert D. Elliott, Chief Engineer
!
Fourth Floor. Docking State Office Building
Topeka, Kansas 66612-1571
I
Kansas Padiation Contro?
.ogram Director
'
bectoDMB(IE01)
!
j
bec distrib. by RIV:
- RRI
- R.
D. Martin, RA
.
- SectionChief(DRP/D)
- DRP
)
- RPB-DRSS
R. DeFayette, RIII
j
- RIV File
SRI, Callaway, RIII
l
- MIS System
- RSTS Operator
- ProjectEngineer(DRP/D)
Lisa Shea, RM/ALF
- DRS
- R. Stewart
j
- L. E11ershaw
- I. Barnes
'
- D. V. Pickett, NRR Project Manager (MS:
13-D-18)
- w/766
j
1
e