IR 05000295/1988021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20248G913
| number = ML20248G913
| issue date = 03/29/1989
| issue date = 03/29/1989
| title = Ack Receipt of 890307 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/88-21 & 50-304/88-21.Written Verification of Commitments Stated Requested within 45 Days of Ltr Date
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/88-21 & 50-304/88-21.Written Verification of Commitments Stated Requested within 45 Days of Ltr Date
| author name = Greenman E
| author name = Greenman E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8904130623
| document report number = NUDOCS 8904130623
| title reference date = 03-07-1989
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 08:59, 16 March 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/88-21 & 50-304/88-21.Written Verification of Commitments Stated Requested within 45 Days of Ltr Date
ML20248G913
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/29/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8904130623
Download: ML20248G913 (2)


Text

_ _ _ _ - .

-

i

  • '

LO CO

. . , - .,,

_

. WAR 29 198g

,

Docket No' 50-295

' Docket No. 50-304-Commonwealth Edison Company

~ ATTN: Mr.'Corde11' Reed Senior Vice President

' Post Office Box 767 Chicago, IL 50690 Gentlemen:

Thank you for your letter' dated March 7, 1989, informing us of the steps you-'

.~have taken to correct the violations identified in Inspection Report N /88021(DRF); 50-304/88021(DRP) forwarded by our letter dated February 7, 1989. Your response: acknowledged.two violations, 1) that quality assurance (QA) program procedures were not followed in that neither a DVR nor a DR was initiated when all 20 main. steam safety valves (MSSVs) were tested and found

.to be out of tolerance for lift setpoints, and 2) that purchase documents for.-

the MSSV testing failed to be properly marked as _ASME Section XI.for code related_ testing or to include all technical engineering requirement In. response to the first violation, you trained quality control (QC) personnel on; ZAP 15-53-l," Processing Discrepancy Records," incorporating lessons learned

'from this violation. . In addition, onsite QA personnel were trained on the

importance of proper documentation of events, including QA's responsibility to assure that DRs or DVRs were initiated, and processed promptly. We believe that similar lessons learned training should be applied to other individuals who are responsible for initiating DRs or DVRs. In a conversation between Mr. M. Holzmer, the NRC senior resident inspector and Mr. W. Stone of your staff, on March 22.and 23, 1989 you agreed to write a letter to all department heads at'the Zion Station to accomplish this purpos In response to the second violation you committed to instruct QC personnel to

. question the purchase order originator when QC is unsure whether all require-ments are listed or referenced. We believe that all reviewers of purchase orders should be similarly trained. In a conversation between Mr. M. Holzmer, the NRC senior resident inspector and Mr. W. Stone of your staff, on March 22 and 23, 1989 you stated that this had been covered in one of your department head meetings and you agreed to provide documentation that all department heads have received this training. In the event that you cannot find the necessary minutes of the meeting, you agreed to hold retre:ning with the department heads and to document the sam You are requested to submit to this office, within 45 days of the date of this letter, a written statement of verification of the commitments stated abcv Sg u\ i

"

8904130623 890329 PDR ADOCK 05000295 l l

'O PDC I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ .w

_ __

,2

  • -

.

MAR 2 91HQ l

'

If your understar. ding of these commitments is different from curs, please call Julian Hinds or Mark Holzmer of my staf

Sincerely OR)GD(Al. ItCMED IT( W. L FORNEY Edward G. Greenman, Director Division of Reactor Projects cc: T. J. Maiman, Vice President, PWR Operations P. Kovack, Nuclear Licensing Manager T. Joyce, Station Manager Paul Shemanski, Acting Project Manager, NRR DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Mayor, City of Zion Chandu Patel, NRR qu RIII RIII RIII RIII lhoun/jp ?C"inds u

CLM DLW McWnna gGreenman es.n.e9 :leter %ln

m__ . . _ _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ J