ML20205C758: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:_ | ||
o E. J. Mrocz' ' | |||
* 85 Form Appr ved by Station auperintend2nt Eftsctive Date STATION PROCEDURE COVER SHEET N A. IDENTIFICATION | |||
' ~'\ /'h Number E0P 35 FR-I.2 Rev. 1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By G. Olson B. REVIEW I have reviewed the above procedure and have found it to be satisfactory. | |||
e TITLE SIGNATURE DATE DEPARTMENT HEAD / / | |||
C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED: | |||
(Significant change in procedure method or scope YES [ ] NO (?<] | |||
as described in FSAR) | |||
(If yes, document in PORC/SORC meeting minutes) | |||
ENVIRONMENTAL IMPACT Adverse environmental impact) YES [ ] NO [y] | |||
(If yes, document in PORC/SORC meeting minutes) | |||
D. INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance YES [ ] N0()d , | |||
of safety-related control systems or performance , | |||
of control systems which may indirectly affect safety system response.) | |||
, (If yes, document in PORC/SORC meeting minutes.) | |||
E. PROCEDURE REQUIRES ORC REVIEW YES C>Q NO ( ] . | |||
F. d 60RC)JORCAPPROVAL | |||
@ SORC Meeting Number 3' -85 cM _ | |||
G. APPROVAL AND IMPLEMENTATION , | |||
The attached procedure is hereby approved, and effective on the date below: | |||
'AN Q - 1]-(( | |||
Effective Date Station /Seofice/ Unit Superinfiif5 dent i | |||
SF 301 Rev. 7 3 Page 1 of 1 g o2g g $$ | |||
P | |||
E0P 35 FR-I.2 rage 1 | |||
. Rev. 1 O RESPONSE TO LOW PRESSURIZER LEVEL Page No. Eff. Rev. | |||
1-4 1 4 | |||
O l | |||
O | |||
.q. | |||
RESPONSE TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 Page 2 ; | |||
Rev. 1 n | |||
V - | |||
STEP' ACTION / EXPECTED RESPONSE RESPONSE NOY 097AINEO 4 A. PURPOSE This procedure provides actions to respond to a low pressurizer level. | |||
B. EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions. | |||
This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition. | |||
T 4 | |||
O O | |||
OPW441 344 | |||
m .. | |||
e . | |||
J/' RESPONSE-TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 .Page 3 U Rev. 1 STEP ACTIOWEXPECTEO RESPONSE RESPONSE NOT OSTAINED 1 Check If SI Has Been Terminated Return to procedure and step in effect. | |||
: a. SI pumps - ALL STOPPED | |||
: b. Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2 Verify Letdown - ISOLATED Manually isolate letdown. | |||
3 Check If Charging Flow Has Been Established | |||
: a. Charging pump - AT a. Perform the following LEAST ONE RUNNING 1) E RPCCW flow to RCP thermal barriers is ' | |||
lost., THEN isolate seal injection to affected RCP before starting charging Pump. | |||
: 2) Start one charging Pump. | |||
: 3) IF F seal injection was isolated, THEN restore seal injection to RCPs | |||
: b. Instrument Air to b. Establish instrument air Containment - ESTABLISHED to containment. | |||
: 1) One instrument air compressor - RUNNING | |||
: 2) OPEN instrument air containment isolation valves | |||
: c. Charging flow - c. Establish Normal ESTABLISHED charging flow 4 Increase Charging Flow To IF charging flow at maximum, Restore PZR Level THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1. | |||
O OPSees 1 3-84 | |||
e . | |||
RESPONSE TO LOW FME55UM14EM LEVEL EOF 35 FM-1.2 Psgm 4 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 5 Check PZR Level | |||
: a. Level - INCREASING a. Return to Step 4. | |||
: b. Level - GREATER THAN 17% b. Return to Step Sa. | |||
6 Turn On PZR Heaters As Necessary 7 Return to Procedure And Step In Effect | |||
-FINAL-4 O | |||
O OPSC641 3-84}} |
Latest revision as of 03:04, 30 December 2020
ML20205C758 | |
Person / Time | |
---|---|
Site: | Millstone, Haddam Neck, 05000000 |
Issue date: | 12/13/1985 |
From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
To: | |
Shared Package | |
ML20204H467 | List:
|
References | |
EOP-35-FR-I.2, NUDOCS 8810260566 | |
Download: ML20205C758 (5) | |
Text
_
o E. J. Mrocz' '
- 85 Form Appr ved by Station auperintend2nt Eftsctive Date STATION PROCEDURE COVER SHEET N A. IDENTIFICATION
' ~'\ /'h Number E0P 35 FR-I.2 Rev. 1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By G. Olson B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
e TITLE SIGNATURE DATE DEPARTMENT HEAD / /
C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED:
(Significant change in procedure method or scope YES [ ] NO (?<]
as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT Adverse environmental impact) YES [ ] NO [y]
(If yes, document in PORC/SORC meeting minutes)
D. INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance YES [ ] N0()d ,
of safety-related control systems or performance ,
of control systems which may indirectly affect safety system response.)
, (If yes, document in PORC/SORC meeting minutes.)
E. PROCEDURE REQUIRES ORC REVIEW YES C>Q NO ( ] .
F. d 60RC)JORCAPPROVAL
@ SORC Meeting Number 3' -85 cM _
G. APPROVAL AND IMPLEMENTATION ,
The attached procedure is hereby approved, and effective on the date below:
'AN Q - 1]-((
Effective Date Station /Seofice/ Unit Superinfiif5 dent i
SF 301 Rev. 7 3 Page 1 of 1 g o2g g $$
P
E0P 35 FR-I.2 rage 1
. Rev. 1 O RESPONSE TO LOW PRESSURIZER LEVEL Page No. Eff. Rev.
1-4 1 4
O l
O
.q.
RESPONSE TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 Page 2 ;
Rev. 1 n
V -
STEP' ACTION / EXPECTED RESPONSE RESPONSE NOY 097AINEO 4 A. PURPOSE This procedure provides actions to respond to a low pressurizer level.
B. EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition.
T 4
O O
OPW441 344
m ..
e .
J/' RESPONSE-TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 .Page 3 U Rev. 1 STEP ACTIOWEXPECTEO RESPONSE RESPONSE NOT OSTAINED 1 Check If SI Has Been Terminated Return to procedure and step in effect.
- a. SI pumps - ALL STOPPED
- b. Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2 Verify Letdown - ISOLATED Manually isolate letdown.
3 Check If Charging Flow Has Been Established
- a. Charging pump - AT a. Perform the following LEAST ONE RUNNING 1) E RPCCW flow to RCP thermal barriers is '
lost., THEN isolate seal injection to affected RCP before starting charging Pump.
- 2) Start one charging Pump.
- 3) IF F seal injection was isolated, THEN restore seal injection to RCPs
- b. Instrument Air to b. Establish instrument air Containment - ESTABLISHED to containment.
- 1) One instrument air compressor - RUNNING
- 2) OPEN instrument air containment isolation valves
- c. Charging flow - c. Establish Normal ESTABLISHED charging flow 4 Increase Charging Flow To IF charging flow at maximum, Restore PZR Level THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.
O OPSees 1 3-84
e .
RESPONSE TO LOW FME55UM14EM LEVEL EOF 35 FM-1.2 Psgm 4 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 5 Check PZR Level
- a. Level - INCREASING a. Return to Step 4.
- b. Level - GREATER THAN 17% b. Return to Step Sa.
6 Turn On PZR Heaters As Necessary 7 Return to Procedure And Step In Effect
-FINAL-4 O
O OPSC641 3-84