ML20205C758: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_
o E. J. Mrocz'          '
* 85 Form Appr ved by Station auperintend2nt                        Eftsctive Date STATION PROCEDURE COVER SHEET N A. IDENTIFICATION
  ' ~'\ /'h Number E0P 35 FR-I.2                                    Rev. 1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By      G. Olson B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
e TITLE                            SIGNATURE            DATE DEPARTMENT HEAD                                                      /  /
C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED:
(Significant change in procedure method or scope              YES [ ]    NO (?<]
as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT Adverse environmental impact)                                YES [ ]    NO [y]
(If yes, document in PORC/SORC meeting minutes)
D. INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance              YES [ ]    N0()d      ,
of safety-related control systems or performance                                    ,
of control systems which may indirectly affect safety system response.)
,                (If yes, document in PORC/SORC meeting minutes.)
E. PROCEDURE REQUIRES            ORC REVIEW                      YES C>Q    NO ( ]    .
F. d 60RC)JORCAPPROVAL
                @ SORC Meeting Number          3' -85 cM            _
G. APPROVAL AND IMPLEMENTATION                                                          ,
The attached procedure is hereby approved, and effective on the date below:
                                          'AN Q - 1]-((
Effective Date Station /Seofice/ Unit Superinfiif5 dent i
SF 301 Rev. 7 3                                    Page 1 of 1 g o2g g $$
P
 
E0P 35 FR-I.2      rage 1
  .                        Rev. 1 O          RESPONSE TO LOW PRESSURIZER LEVEL Page No.                Eff. Rev.
1-4                          1 4
O l
O
 
                    .q.
RESPONSE TO LOW PRESSURIZER LEVEL          E0P 35 FR-I.2        Page 2        ;
Rev. 1 n
V -
STEP'            ACTION / EXPECTED RESPONSE          RESPONSE NOY 097AINEO 4      A. PURPOSE This procedure provides actions to respond to a low pressurizer level.
B. EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition.
T 4
O O
OPW441 344
 
m                          ..
e    .
J/'        RESPONSE-TO LOW PRESSURIZER LEVEL            E0P 35 FR-I.2          .Page 3 U                                                        Rev. 1 STEP              ACTIOWEXPECTEO RESPONSE              RESPONSE NOT OSTAINED 1 Check If SI Has Been Terminated      Return to procedure and step in effect.
: a. SI pumps - ALL STOPPED
: b. Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2  Verify Letdown - ISOLATED            Manually isolate letdown.
3  Check If Charging Flow Has Been Established
: a. Charging pump - AT            a. Perform the following LEAST ONE RUNNING                    1) E RPCCW flow to RCP thermal barriers is    '
lost., THEN isolate seal injection to affected RCP before starting charging Pump.
: 2) Start one charging Pump.
: 3) IF F seal injection was isolated, THEN restore seal injection to RCPs
: b. Instrument Air to            b. Establish instrument air Containment - ESTABLISHED            to containment.
: 1) One instrument air compressor - RUNNING
: 2) OPEN instrument air containment isolation valves
: c. Charging flow -              c. Establish Normal ESTABLISHED                          charging flow 4  Increase Charging Flow To            IF charging flow at maximum, Restore PZR Level                    THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.
O OPSees 1 3-84
 
e    .
RESPONSE TO LOW FME55UM14EM LEVEL            EOF 35 FM-1.2          Psgm 4 Rev. 1 STEP            ACTION / EXPECTED RESPONSE                RESPONSE NOT OSTAINED 5 Check PZR Level
: a. Level - INCREASING                a.      Return to Step 4.
: b. Level - GREATER THAN 17%          b.      Return to Step Sa.
6 Turn On PZR Heaters As Necessary 7 Return to Procedure And Step In Effect
                                                -FINAL-4 O
O OPSC641 3-84}}

Latest revision as of 03:04, 30 December 2020

Rev 1 to Emergency Operating Procedure EOP 35 FR-I.2, Response to Low Pressurizer Level
ML20205C758
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 12/13/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-35-FR-I.2, NUDOCS 8810260566
Download: ML20205C758 (5)


Text

_

o E. J. Mrocz' '

  • 85 Form Appr ved by Station auperintend2nt Eftsctive Date STATION PROCEDURE COVER SHEET N A. IDENTIFICATION

' ~'\ /'h Number E0P 35 FR-I.2 Rev. 1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By G. Olson B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.

e TITLE SIGNATURE DATE DEPARTMENT HEAD / /

C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED:

(Significant change in procedure method or scope YES [ ] NO (?<]

as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT Adverse environmental impact) YES [ ] NO [y]

(If yes, document in PORC/SORC meeting minutes)

D. INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance YES [ ] N0()d ,

of safety-related control systems or performance ,

of control systems which may indirectly affect safety system response.)

, (If yes, document in PORC/SORC meeting minutes.)

E. PROCEDURE REQUIRES ORC REVIEW YES C>Q NO ( ] .

F. d 60RC)JORCAPPROVAL

@ SORC Meeting Number 3' -85 cM _

G. APPROVAL AND IMPLEMENTATION ,

The attached procedure is hereby approved, and effective on the date below:

'AN Q - 1]-((

Effective Date Station /Seofice/ Unit Superinfiif5 dent i

SF 301 Rev. 7 3 Page 1 of 1 g o2g g $$

P

E0P 35 FR-I.2 rage 1

. Rev. 1 O RESPONSE TO LOW PRESSURIZER LEVEL Page No. Eff. Rev.

1-4 1 4

O l

O

.q.

RESPONSE TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 Page 2  ;

Rev. 1 n

V -

STEP' ACTION / EXPECTED RESPONSE RESPONSE NOY 097AINEO 4 A. PURPOSE This procedure provides actions to respond to a low pressurizer level.

B. EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.

This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition.

T 4

O O

OPW441 344

m ..

e .

J/' RESPONSE-TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 .Page 3 U Rev. 1 STEP ACTIOWEXPECTEO RESPONSE RESPONSE NOT OSTAINED 1 Check If SI Has Been Terminated Return to procedure and step in effect.

a. SI pumps - ALL STOPPED
b. Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2 Verify Letdown - ISOLATED Manually isolate letdown.

3 Check If Charging Flow Has Been Established

a. Charging pump - AT a. Perform the following LEAST ONE RUNNING 1) E RPCCW flow to RCP thermal barriers is '

lost., THEN isolate seal injection to affected RCP before starting charging Pump.

2) Start one charging Pump.
3) IF F seal injection was isolated, THEN restore seal injection to RCPs
b. Instrument Air to b. Establish instrument air Containment - ESTABLISHED to containment.
1) One instrument air compressor - RUNNING
2) OPEN instrument air containment isolation valves
c. Charging flow - c. Establish Normal ESTABLISHED charging flow 4 Increase Charging Flow To IF charging flow at maximum, Restore PZR Level THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.

O OPSees 1 3-84

e .

RESPONSE TO LOW FME55UM14EM LEVEL EOF 35 FM-1.2 Psgm 4 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 5 Check PZR Level

a. Level - INCREASING a. Return to Step 4.
b. Level - GREATER THAN 17% b. Return to Step Sa.

6 Turn On PZR Heaters As Necessary 7 Return to Procedure And Step In Effect

-FINAL-4 O

O OPSC641 3-84