_

o E. J. Mrocz' 85 Form Appr ved by Station auperintend2nt Eftsctive Date STATION PROCEDURE COVER SHEET N

' ~ /'h A.

IDENTIFICATION

'\\

Number E0P 35 FR-I.2 Rev.

1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By G. Olson B.

REVIEW I have reviewed the above procedure and have found it to be satisfactory.

e TITLE SIGNATURE DATE

/

DEPARTMENT HEAD

/

C.

UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED:

(Significant change in procedure method or scope YES [ ]

NO (?<]

as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT Adverse environmental impact)

YES [ ]

NO [y]

(If yes, document in PORC/SORC meeting minutes)

D.

INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance YES [ ]

N0()d of safety-related control systems or performance of control systems which may indirectly affect safety system response.)

(If yes, document in PORC/SORC meeting minutes.)

E.

PROCEDURE REQUIRES ORC REVIEW YES C>Q NO ( ]

60RC)JORCAPPROVAL d

F.

@ SORC Meeting Number 3' -85 cM G.

APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:

'AN Q - 1]-((

Station /Seofice/ Unit Superinfiif5 dent Effective Date i

SF 301 Rev. 7 g o2g g $$

3 Page 1 of 1 P

E0P 35 FR-I.2 rage 1 Rev. 1 O

RESPONSE TO LOW PRESSURIZER LEVEL Page No.

Eff. Rev.

1-4 1

4 O

l O

.q.

RESPONSE TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 Page 2 Rev. 1 n

V STEP' ACTION / EXPECTED RESPONSE RESPONSE NOY 097AINEO 4

A.

PURPOSE This procedure provides actions to respond to a low pressurizer level.

B.

EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.

This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition.

T 4

O O

OPW441 344

m e

J/'

RESPONSE-TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2

.Page 3 U

Rev. 1 STEP ACTIOWEXPECTEO RESPONSE RESPONSE NOT OSTAINED 1

Check If SI Has Been Terminated Return to procedure and step in effect.

a.

SI pumps - ALL STOPPED b.

Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2

Verify Letdown - ISOLATED Manually isolate letdown.

3 Check If Charging Flow Has Been Established a.

Charging pump - AT a.

Perform the following LEAST ONE RUNNING

1) E RPCCW flow to RCP thermal barriers is lost., THEN isolate seal injection to affected RCP before starting charging Pump.
2) Start one charging Pump.
3) IF seal injection was F

isolated, THEN restore seal injection to RCPs b.

Instrument Air to b.

Establish instrument air Containment - ESTABLISHED to containment.

1) One instrument air compressor - RUNNING
2) OPEN instrument air containment isolation valves c.

Charging flow -

c.

Establish Normal ESTABLISHED charging flow 4

Increase Charging Flow To IF charging flow at maximum, Restore PZR Level THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.

O OPSees 1 3-84

e RESPONSE TO LOW FME55UM14EM LEVEL EOF 35 FM-1.2 Psgm 4 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 5

Check PZR Level a.

Level - INCREASING a.

Return to Step 4.

b.

Level - GREATER THAN 17%

b.

Return to Step Sa.

6 Turn On PZR Heaters As Necessary 7

Return to Procedure And Step In Effect

-FINAL-4 O

O OPSC641 3-84