ML20205C758

From kanterella
Jump to navigation Jump to search
Rev 1 to Emergency Operating Procedure EOP 35 FR-I.2, Response to Low Pressurizer Level
ML20205C758
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 12/13/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-35-FR-I.2, NUDOCS 8810260566
Download: ML20205C758 (5)


Text

_

o E. J. Mrocz' '

  • 85 Form Appr ved by Station auperintend2nt Eftsctive Date STATION PROCEDURE COVER SHEET N A. IDENTIFICATION

' ~'\ /'h Number E0P 35 FR-I.2 Rev. 1 Title RESPONSE TO LOW PRESSURIZER LEVEL Prepared By G. Olson B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.

e TITLE SIGNATURE DATE DEPARTMENT HEAD / /

C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUIRED:

(Significant change in procedure method or scope YES [ ] NO (?<]

as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT Adverse environmental impact) YES [ ] NO [y]

(If yes, document in PORC/SORC meeting minutes)

D. INTEGRATED SAFETY REVIEW REQUIRE 0 (Affects response of Safety Systems, performance YES [ ] N0()d ,

of safety-related control systems or performance ,

of control systems which may indirectly affect safety system response.)

, (If yes, document in PORC/SORC meeting minutes.)

E. PROCEDURE REQUIRES ORC REVIEW YES C>Q NO ( ] .

F. d 60RC)JORCAPPROVAL

@ SORC Meeting Number 3' -85 cM _

G. APPROVAL AND IMPLEMENTATION ,

The attached procedure is hereby approved, and effective on the date below:

'AN Q - 1]-((

Effective Date Station /Seofice/ Unit Superinfiif5 dent i

SF 301 Rev. 7 3 Page 1 of 1 g o2g g $$

P

E0P 35 FR-I.2 rage 1

. Rev. 1 O RESPONSE TO LOW PRESSURIZER LEVEL Page No. Eff. Rev.

1-4 1 4

O l

O

.q.

RESPONSE TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 Page 2  ;

Rev. 1 n

V -

STEP' ACTION / EXPECTED RESPONSE RESPONSE NOY 097AINEO 4 A. PURPOSE This procedure provides actions to respond to a low pressurizer level.

B. EhTRY CONDITIONS This procedure was written for Modes 1, 2, 3 and 4 assuming RHR in not in service and SI has been terminated. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.

This procedure is entered from E0P 35 F-0.6, INVENTORY Critical Safety Function Status Tree on a YELLOW condition.

T 4

O O

OPW441 344

m ..

e .

J/' RESPONSE-TO LOW PRESSURIZER LEVEL E0P 35 FR-I.2 .Page 3 U Rev. 1 STEP ACTIOWEXPECTEO RESPONSE RESPONSE NOT OSTAINED 1 Check If SI Has Been Terminated Return to procedure and step in effect.

a. SI pumps - ALL STOPPED
b. Charging pumps to Reactor Cold Legs Isolation Valves - CLOSED 2 Verify Letdown - ISOLATED Manually isolate letdown.

3 Check If Charging Flow Has Been Established

a. Charging pump - AT a. Perform the following LEAST ONE RUNNING 1) E RPCCW flow to RCP thermal barriers is '

lost., THEN isolate seal injection to affected RCP before starting charging Pump.

2) Start one charging Pump.
3) IF F seal injection was isolated, THEN restore seal injection to RCPs
b. Instrument Air to b. Establish instrument air Containment - ESTABLISHED to containment.
1) One instrument air compressor - RUNNING
2) OPEN instrument air containment isolation valves
c. Charging flow - c. Establish Normal ESTABLISHED charging flow 4 Increase Charging Flow To IF charging flow at maximum, Restore PZR Level THEN manually operate SI pumps as necessary. E PZR level can NOT be restored, THEN go to E0P 35 E-1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.

O OPSees 1 3-84

e .

RESPONSE TO LOW FME55UM14EM LEVEL EOF 35 FM-1.2 Psgm 4 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 5 Check PZR Level

a. Level - INCREASING a. Return to Step 4.
b. Level - GREATER THAN 17% b. Return to Step Sa.

6 Turn On PZR Heaters As Necessary 7 Return to Procedure And Step In Effect

-FINAL-4 O

O OPSC641 3-84