ML20128H437: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:______ __ _ ____          _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _                                    _ _ _ _ _ _ _                    ___
                    ,7 ,                                                                                            . JUN 2 01985 l
l                        Dockets Nos. 50-277                                                                                              DISTRIBUTION l                                                                                and 50-278                                              .6                          BGrimes
;                                                                                                                                        NRC PDR                      JPartlow l
L PDR                        ACRS-10 ORBf4 Rdg                    RIngram Mr. Edward G. Bauer, Jr.                                                                                        HThompson                    GGears Vice President and General Counsel                                                                              OELD                        Gray File Philadelphia Electric Company                                                                                    EJordan                      NChokshi 2301 Market Street j
Philadelphia, Pennsylvania 19101
 
==Dear Mr. Bauer:==
 
==SUBJECT:==
MASONRY WALL DESIGN, IE BULLETIN 80-11 I
Re:                                                              Peach Bottom Atomic Power Station, Units 2 and 3.
By a letter dated October 30, 1984, we forwarded our safety evaluation report (SER) on the subject issue. This SER concluded that except for five walls
!                        qualified by the licensee using energy-balance technique, Items 2(b) and 3 of IE Bulletin 80-11 have been fully implemented at the Peach Bottom facility.
l                      We included our position on the energy-balance technique for implementation I                        by the licensee.
By a letter dated January 9,1985, you provided results of the re-evaluation
'l of the above five walls of the staff review. In the enclosed supplement to our SER, we concur with the licensee that upon removal of certain conservatism from the original wall analysis, the above five walls can be l                        qualified based on the working stress methodology in compliance with the
!                        staff acceptance criteria. Therefore, for all block walls at the Peach L                        Bottom facility, Items 2(b) and 3 of IE Bulletin 80-11 have been fully implemented.
We, therefore, conclude that no further NRC action is required in this subject area. If you have any questions concernin contact your NRC Project Manager (Gerry Gears                                                                                      at (g this action, please 301) 492-8362).
Sincerely, ev. ma sna u JGW 7. aw.'
John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
 
==Enclosure:==
 
As Stated cc w/ enclosure:
See next page 0              :DL                                                                ORB  -
G                        icr                                                      JS ol 6                          i                                                      6 0/8 MMf                7}}

Revision as of 11:17, 23 July 2020

Forwards Sser on Util Response to IE Bulletin 80-11 Re Masonry Wall Design.Suppl Incorporates Addl Info Submitted on 850109.No Further Action Required
ML20128H437
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/20/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20128H441 List:
References
IEB-80-11, NUDOCS 8507090534
Download: ML20128H437 (1)


Text

______ __ _ ____ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ ___

,7 , . JUN 2 01985 l

l Dockets Nos. 50-277 DISTRIBUTION l and 50-278 .6 BGrimes

NRC PDR JPartlow l

L PDR ACRS-10 ORBf4 Rdg RIngram Mr. Edward G. Bauer, Jr. HThompson GGears Vice President and General Counsel OELD Gray File Philadelphia Electric Company EJordan NChokshi 2301 Market Street j

Philadelphia, Pennsylvania 19101

Dear Mr. Bauer:

SUBJECT:

MASONRY WALL DESIGN, IE BULLETIN 80-11 I

Re: Peach Bottom Atomic Power Station, Units 2 and 3.

By a letter dated October 30, 1984, we forwarded our safety evaluation report (SER) on the subject issue. This SER concluded that except for five walls

! qualified by the licensee using energy-balance technique, Items 2(b) and 3 of IE Bulletin 80-11 have been fully implemented at the Peach Bottom facility.

l We included our position on the energy-balance technique for implementation I by the licensee.

By a letter dated January 9,1985, you provided results of the re-evaluation

'l of the above five walls of the staff review. In the enclosed supplement to our SER, we concur with the licensee that upon removal of certain conservatism from the original wall analysis, the above five walls can be l qualified based on the working stress methodology in compliance with the

! staff acceptance criteria. Therefore, for all block walls at the Peach L Bottom facility, Items 2(b) and 3 of IE Bulletin 80-11 have been fully implemented.

We, therefore, conclude that no further NRC action is required in this subject area. If you have any questions concernin contact your NRC Project Manager (Gerry Gears at (g this action, please 301) 492-8362).

Sincerely, ev. ma sna u JGW 7. aw.'

John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

As Stated cc w/ enclosure:

See next page 0 :DL ORB -

G icr JS ol 6 i 6 0/8 MMf 7