Forwards SER Accepting Util 840116,0927 & 850805 Responses to Generic Ltr 82-33,Item 6 Re Compliance w/post-accident Monitoring Instrumentation Guidelines of Reg Guide 1.97 Concerning Emergency Response Facilities
ML20148E606
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/15/1988
From: Martin R
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20148E609 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, TAC-51117, TAC-51118, NUDOCS 8801260068
Download: ML20148E606 (3)


Text

- . _ _ _ - _ _ -

January 15, 1988 Docket Nos.: 50-277 50-278 Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101

Dear Mr. Bauer:

SUBJECT:

CONFORMANCE TO REGULATORY GUIDE 1.97 (TAC NOS. 51117, 51118 Enclosed is the NRC staff's safety evaluation related to confomance of the Peach Bottom Atomic Power Station (PBAPS) to the provisions of Regulatory Guide 1.97, Revision 3. The evaluation is based on review by an NRC Contractor, EG&G Idaho, Inc. The EG&G Idaho, Inc. Technical Evaluation Report is attached to the enclosed evaluation. <

Based on this review, the NRC staff concludes that the PBAPS complies with the recomendations of RG 1.97, Revision 3 except for instrumentation associated with monitoring of the variables neutron flux and containment isolation valve position. It is the staff's position that the licensee shall install and have operational instrumentation to monitor the subject variables which meet the recommendations of RG 1.97, Revision 3.

We request that, upon your assessment of this evaluation, you provide an estimate of the schedule for achieving implementation of any necessary changes. Should you have questions on this issue, particularly the neutron flux monitoring and seismic qualification aspects of the issue, please feel free to contact us.

Sincerely,

/s/

Robert E. Martin, Project Manager Project Directorate PDI-2 Division of Reactor Projects I/II Office of Nuclear Reactor _ Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DISTRIBUTION ,

epocket,Fileed BBoger EJordan l NRC PDR/LPDR M0'Brien JPartlow PDI-2 Reading RMartin/RClark ACRS (10)

SVarga OGC r' LCheung, Rg!

/ W PDI-?/D l n:cp WButler 1

//J788 (//88I]

8801260068 DR 880115 ADOCK 05000277 PDR l

o

/ oD Cisg'c, UNITE D STATES l' .,.. c g ' j NUCLE AR REGULATORY COMMISSION

. - " - t W ASHINGTON, D. C. 20555

.() g #

January 15, 1988 Docket Nos.: EC-277 50-?78 Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101

Dear Mr. Bauer:

SUBJECT:

CONr0RPANCE TO REGULATORY GUIDE 1.97 (TAC NOS. 51117, 51118 Enclosed is the NPC staff's safety evaluation related to conforman:e of the Peach Bottom Atomic Power Station (PBAPS) to the provisions of Peyulatory Guide 1.97, Revision 3. The evaluation is based on review by an NRC Contractor, EG&r, Idaho, Inc. The EGAG Idaho, Inc. Technical Evaluation Report is attached to the enclosed evaluation.

Based on this review, the NRC staff concludes that the PBAPS complies with the recommendations of RG 1.97, Revision 3 except for instrumentation associated with monitoring of the variables neutron flux and containment isolation valve Desition. It is the staff's position that the licensee shall install and have operational instrumentation to monitor the subject variables which meet the recorrendations of RG 1.97, Revision 3.

We request that, upon your assessment of this evaluation, you provide an estimate of the schedule for achieving implementation of any necessary changes. Should you have questions on this issue, particularly the neutron flux monitoring and seismic qualification aspects of the issue, please feel free to contact us.

Sincerely, A+

bert E. Martin, Project Manager Project Directorate PDI-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure: '

See next page

Mr. E. 0. Bauer, s'r. Peach Botten Atonic Power Staticr;, I Philadelphia Electric Company Units ? and 3 l

I cC:

Pr. J. S. Kenper, Senior Vice President Mr. R. A. Peiss, Coordinator  !

Philadelphia Electric Company Pennsylvania State Clearinghouse i 2301 Market Street Governor's Office of State Plannire '

Philadelphia, Pennsylvania 19101 and Development P. O. Box 1323 .

Troy B. Conner, Jr., Eso. Harrisburg, Pennsylvania 17:20 1747 Pennsylvania Avenue, N.W.

Washington, D.C. 20006 Mr. Thomas M. Gerusky, Director l Bureau of Radiation Protection  !

Philadelphia Electric Company Pennsylvania Department of i ATTN: Mr. D. M. Smith, Vice President Environmental Pesources i Peach Botton Atomic Power Station P. O. Box 2063 ,

Route 1, Box 208 Harrisburg, Pennsylvania 17120 l Delta, Pennsylvania 17314 . 1 Mr. Albert R. Steel, Chairman Mr. W. M. Alden Board of Supervisors Engineer-in-Charge-Licensing Peach Bottom Township Philadelphia Electric Company R. D. #1 l 2301 Market Street Delta, Pennsylvania 17314 l Philadelphia, Pennsylvania 19101 Mr. Gary Mock Morgan J. Morris, III P. O. Box 09181 General Manager - Operating Services Columbus, Ohio 43209 ,

Atlantic Electric '

P. O. Box 1500 Mr. Thomas S. Shaw, Jr.

1199 Black Horse Pike Vice President - Production Pleasantville, New Jersey 08232 Delmarva Power ar.d Light Company 800 King Street Resident inspecto Wilmington, Delawar 19890 U. S. Nuclear Regulatory Comission Peach Bottom Atomic Power Station Mr. Tom Macette P. O. Box 399 Power Plant Pesearch Program Delta, Pennsylvania 17314 Department of Natural Resources B-3 Regional Administrator, Region 1 Tawes State Office Building U. S. Nuclear Regulatory Commission Annapolis, Maryland 21401 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Roland Fletcher Department of Environment 201 West Preston Street Baltimore, Maryland 21?01

.