Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-424/88-53.Violation Re Failure to Log Safeguards Event Occurred as Stated in Notice of Violation.Encl Withheld (Ref 10CFR2.790 & 73.21)
ML20247N767
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/27/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8908030155
Download: ML20247N767 (2)


Text

-- _ _ .

,

e'

.

,.

-

JUL 2 7 M-Docket No: 50-424 License No: NPF-68 Georgia Power Company SAfECUARDS INFORE.qjyj p gg,,, ATTN: Mr. W. G. Hairston, III Senior Vice President -

Nuclear Operations P. O. Box-1295 Birmirgham, AL 35201

' Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-424/88-53 Thank you for your response of June 29, 1989, to our Notice of Violation issued on May 31, 1989, concerning activities conducted at your Plant Vogtle facility under NRC License No. NPF-6 In your response, you acknowledged the occurrence of violations relating to the protection of safeguards material and deportability of a safeguards event. We have evaluated your response to these violations and found that they meet the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections. In your response, however, you denied the violation concerning the failure to log a safeguards event. After careful consideration of the basis for your denial, we have concluded, for the reasons presented- in the enclosure to this letter, that the violation occurred as stated in the Notice of Violatio In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure. Therefore, the enclosure to this letter will not be placed in the NRC Public Document Roo We appreciate your cooperation in this matte

Sincerely,

/

Stewart D. Ebneter Regional Administrator Enclosure: (See page 2)

I' fY 8908030153 890727 g PDR ADOCK 05000424 g PDC

, _ - - _

/:  :

. s ,. j Georgia Power Company 2

.

g g 7 gg Enclosure:

Staff Assessment of Licensee Response (Safeguards Information)

cc w/ enc 1:

R. P. Mcdonald, Executive Vice President-Nuclear Operations C. K. McCoy, Vice President -

Nuclear -!

G. R. Fredrick, Quality Assurance Site Manager G. Bockhold, Jr. , General Manager Nuclear Operations J. A. Bailey, Manager-Licensing cc w/o encl:

State of Georgia bec w/ encl:

NRR/DRIS/SB bcc w/o encl:

E. Reis, OGC

'

J. Hopkins, NRR NRC Resident Inspector Document Control Desk RIDS, IE-04, 016

,