MONTHYEARML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24053A3562024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant, Unit 3 & 4 (Report 05200025/2023006 & 05200026/2023006) IR 05000424/20230062024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424-2023006 and 05000425-2023006 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23199A1472023-07-19019 July 2023 (Vegp), Unit 4 - Transition to the Operating Reactor Assessment Program (NRC Report 05200026/2023010) IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23053A1342023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant, Unit 4 NRC Report 05200026/2022009 ML23058A2292023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant, Unit 3 (Report 05200025/2022012) ML23003A1682022-11-10010 November 2022 Notification of Vogtle Commercial Grade Dedication Inspection IR 05000424/20220052022-08-24024 August 2022 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005 ML22188A1712022-07-29029 July 2022 (VEGP) Unit 3 - Transition to the Operating Reactor Assessment Program (NRC Report 05200025/2022009) IR 05000424/20210062022-03-0202 March 2022 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 (Report No 05000424/2021006 and 05000425/2021006) ML22054A3232022-03-0202 March 2022 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 and 4 - NRC Report 05200025/2021012 and 05200026/2021012 ML21120A0082021-04-29029 April 2021 Requalification Program Inspection Vogtle Nuclear Plant IR 05000424/20190112021-04-0707 April 2021 Biennial Problem Identification and Resolution Inspection Report 05000424/2019011 and 05000425/2021010 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 IR 05000424/20200062021-03-0303 March 2021 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2020006 and 05000425/2020006 IR 05000424/20200112020-10-26026 October 2020 NRC Triennial Fire Protection Inspection Report 05000424/2020011 and 05000425/2020011 ML20063L6052020-03-0303 March 2020 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3&4 (NRC Report 05200025/2019-006 and 05200025/2019-006) IR 05000424/20190062020-03-0303 March 2020 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2019006 and 05000425/2019006 IR 05000424/20190052019-08-27027 August 2019 Updated Inspection Plan for Vogtle Electric Generating Plant Reports 05000424/2019005 and 05000425/2019005 ML19123A1382019-05-0303 May 2019 Occupational Radiation Safety Baseline Inspection 2019002 Document Request ML19065A3072019-03-0606 March 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000424/20180062019-03-0404 March 2019 Annual Assessment Letter for Vogtle Electric Generating Plant - Report 05000424/2018006 and 05000425/2018006 ML19063D3462019-03-0404 March 2019 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 & 4 (NRC Report 05200025/2018006 and 05200026/2018006) ML19030A7392019-01-28028 January 2019 RFI IR 05000424/20180052018-08-23023 August 2018 Updated Inspection Plan for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Reports 05000424/2018005 and 05000425/2018005 ML18215A1242018-08-0303 August 2018 Radiation Safety Baseline Inspection RFI 2018004 (Public) ML18082A0612018-03-20020 March 2018 Emergency Preparedness Inspection and Request for Information ML18059A7212018-03-0202 March 2018 Annual Assessment Letter for Vogtle Electric Generating Plant Units 2 and 3 (NRC Report 05200025/2017005 and 05200026/2017005 ML18059A1672018-02-28028 February 2018 EOC Assessment Letter IR 05000424/20170052017-08-28028 August 2017 Updated Inspection Plan NRC Inspection Report 05000424/2017005 and 05000425/2017005 ML17233A2492017-08-17017 August 2017 Notification of Inspection Report and Request for Information ML17143A3262017-05-19019 May 2017 Requalification Program Inspection 05000424/2017002 and 05000425/2017002 IR 05000424/20160062017-03-0101 March 2017 Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2016006 and 05000425/2016006) IR 05000424/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424/2016005 and 05000425/2016005 IR 05000424/20150062016-03-0202 March 2016 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (Report 05000424/2015006 and 05000425/2015006) ML16032A0382016-01-29029 January 2016 Vogtle Electric Generating Plant, Unit 2, Notification Of Inspection and Request for Information ML16008A1462016-01-0808 January 2016 Vogtle Electric Generating Plant Emergency Preparedness Inspection and Request for Information ML16008A1202016-01-0808 January 2016 Vogtle Electric Generating Plant - Notification of Inspection and Request for Information IR 05000424/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 (Inspection Report No. 05000424/2015005 and 05000425/2015005 ML15110A0332015-04-17017 April 2015 Notification of Conduct of a Triennial Fire Protection Baseline Inspection, U. S. Nuclear Regulatory Commission Inspection Report Nos. 05000424/2015007 and 05000425/2015007 IR 05000424/20140012015-03-0404 March 2015 Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (NRC Inspection Report 05000424/2014001 and 05000425/2014001) 2024-09-03
[Table view] Category:Letter
MONTHYEARML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 2024-09-09
[Table view] |
Inspection Report - Vogtle - 2008001 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - VOGTLE ELECTRIC GENERATING PLANT (NRC INSPECTION REPORT 05000424/2008001 AND 05000425/2008001)
Dear Mr. Tynan:
On February 5, 2008, the NRC staff completed its performance review of Vogtle Electric Generating Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone performance review and resultant inspection plan.
Overall, Vogtle Unit 1 and Unit 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix due to the Mitigating Systems Performance Index (MSPI), Cooling Water Systems PI crossing the threshold from Green to White. Therefore, in addition to the reactor oversight process (ROP) baseline inspection program, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs In a Strategic Performance Area, when you have notified us of your readiness.
Unit 2 plant performance for the most recent quarter as well as the previous three quarters was within the Regulatory Response Column of the NRCs Action Matrix due to the MSPI, Cooling Water Systems PI crossing the threshold from Green to White in the second quarter of calendar year 2006. In May 2007, the NRC conducted a supplemental inspection in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. As documented in NRC Supplemental Inspection Report 05000425/20070012, your problem identification, root cause, and corrective actions were adequate. However, an additional failure was discovered in the third quarter of 2007 which resulted in the PI remaining in the White performance band. Therefore, in addition to the ROP baseline inspection program, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001. This inspection will be conducted in conjunction with the Unit 1 supplemental inspection.
SNC 2 In addition, both Unit 1 and Unit 2 were in the Regulatory Response Column of the NRCs Action Matrix due to a White finding in the Emergency Preparedness Cornerstone that originated in the third quarter of 2006. On February 14, 2008, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001. The NRC did not identify any new concerns at the exit meeting. The inspection results will be documented in NRC inspection report 05000425/2007502.
The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2009. In addition, we will be conducting NRC Temporary Instructions 171 and 172, reactor operator licensing examinations, license renewal inspections, and in-office review of testing results for containment recirculation sump modifications on both Unit 1 and Unit 2.
The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Scott Shaeffer at (404) 562-4521 with any questions you may have regarding this letter or the inspection plan.
Sincerely
/RA/
Joseph W. Shea, Acting Director Division of Reactor Projects Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 Enclosure: Vogtle Inspection/Activity Plan cc w/encl: (See page 3)
_________________________
OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE CWR /via email/ SMS /RA/ JWS /RA for/
NAME CRapp SShaeffer HChristensen DATE 03/03/2008 03/03/2008 03/03/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC 3 cc w/encl: Laurence Bergen J. T. Gasser Oglethorpe Power Corporation Executive Vice President Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bob Masse, Resident Manager Oglethorpe Power Corporation David H. Jones Alvin W. Vogtle Nuclear Plant Vice President - Engineering Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders L. M. Stinson, Vice President, Electronic Mail Distribution Fleet Operations Support Southern Nuclear Operating Company, Inc. Senior Engineer - Power Supply Electronic Mail Distribution Municipal Electric Authority of Georgia N. J. Stringfellow Electronic Mail Distribution Manager-Licensing Southern Nuclear Operating Company, Inc. Reece McAlister Electronic Mail Distribution Executive Secretary Georgia Public Service Commission Moanica Caston 244 Washington Street, SW Southern Nuclear Operating Company, Inc. Atlanta, GA 30334 Electronic Mail Distribution NRC Resident Inspector Director, Consumers' Utility Counsel U.S. Nuclear Regulatory Commission Division 7821 River Rd Governor's Office of Consumer Affairs Waynesboro, GA 30830 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Director, Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Attorney General Law Department 132 Judicial Building Atlanta, GA 30334
SNC 4 Letter to T. from Joseph W. Shea dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - VOGTLE ELECTRIC GENERATING PLANT (NRC INSPECTION REPORT 05000424/2008001 AND 05000425/2008001)
Distribution w/encl:
B. Singal, NRR C. Evans, RII L. Slack, RII RIDSNRRDIRS ROP Reports INPO OE Mail PUBLIC
Page 1 of 2 Vogtle 03/03/2008 08:44:06 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-ISI - UNIT 1 INSERVICE INSPECTION 3 1 IP 7111108P Inservice Inspection Activities - PWR 03/24/2008 03/28/2008 Baseline Inspections EB3SGISI - U1 SG ISI 3 1 IP 7111108P Inservice Inspection Activities - PWR 03/31/2008 04/04/2008 Baseline Inspections EB3TI172 - TI-172 1 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/21/2008 04/25/2008 Generic Safety Inspectio LICREN - LICENSE RENEWAL 5 1, 2 IP 71002 License Renewal Inspection 05/19/2008 05/23/2008 License Renewal Inspec 1, 2 IP 71002 License Renewal Inspection 06/02/2008 06/06/2008 License Renewal Inspec PB2-SUPP - 95001- SUPPLEMENTAL FOR WHITE MSPI-CWS 2 1, 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 06/04/2008 06/08/2008 Supplemental Program PSB1-EP - EP EXERCISE 4 1, 2 IP 7111401 Exercise Evaluation 06/23/2008 06/27/2008 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/23/2008 06/27/2008 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 06/23/2008 06/27/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 06/23/2008 06/27/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 06/23/2008 06/27/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 07/07/2008 07/11/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/22/2008 09/26/2008 Baseline Inspections EB3ISI - U2 ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/29/2008 10/03/2008 Baseline Inspections EB3SGISI - U2 SG ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2008 10/10/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/06/2008 10/10/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Vogtle 03/03/2008 08:44:06 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 3 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 Baseline Inspections EB1-MODS - MODIFICATIONS - 10CFR50.59 5 1, 2 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/27/2008 11/07/2008 Baseline Inspections PB7-PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 1, 2 IP 71152B Identification and Resolution of Problems 12/01/2008 12/05/2008 Baseline Inspections PI&R - PROBLEM IDENTIFIACTION & RESOLUTION 5 1, 2 IP 71152B Identification and Resolution of Problems 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/23/2009 02/27/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 05/11/2009 05/14/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/01/2009 06/08/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/08/2009 06/12/2009 Not Applicable OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 06/22/2009 06/26/2009 Baseline Inspections PSB1EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 06/22/2009 06/26/2009 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 06/22/2009 06/26/2009 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 06/22/2009 06/26/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.